# CENTERPOINT ENERGY GAS TRANSMISSION — Gas transmission and gathering — incident on 2013-02-28

- **operation:** document
- **citation:** PHMSA Report 20130024
- **title:** CENTERPOINT ENERGY GAS TRANSMISSION — Gas transmission and gathering — incident on 2013-02-28
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2013-03-19
- **effective on:** 2013-02-28
- **summary:** Gas transmission and gathering incident in CONWAY, FALKNER County, AR. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 2689 NATURAL GAS released, $195 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-39872f189fbe52117d7affac.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-39872f189fbe52117d7affac.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-39872f189fbe52117d7affac
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident in CONWAY, FALKNER County, AR. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 2689 NATURAL GAS released, $195 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20130024.

Operator ID: 602.

Reported incident date: 2/28/2013 15:08.

Location detail: CONWAY TB #2

Cause detail: MALFUNCTION OF CONTROL/RELIEF EQUIPMENT

Cause detail: THIS EVENT WAS REPORTED BECAUSE IT IS CONSIDERED TO BE SIGNIFICANT BY THE OPERATOR. CEGT BELIEVES THE EVENT IS SIGNIFICANT DUE TO EMERGENCY RESPONDERS EVACUATING 60 PEOPLE FROM A NEAR BY BUILDING (DAYCARE) TO ENSURE THEIR SAFETY. THERE WERE NO DEATHS, INJURIES OR A FIRE. THIS EVENT DID NOT HAVE A REPORTABLE LOSS OF GAS VOLUME AND HAD A MINIMAL REPAIR COST. THE METERING FACILITY INVOLVED FUNCTIONED PROPERLY AND AS DESIGNED. TRASH IN A SENSING LINE CAUSED THE REGULATOR TO OPEN AND BUILD PRESSURE IN THE MEASUREMENT STATION. THE SYSTEM RELIEF OPENED/BLEW AS IT WAS DESIGNED TO DO. CEGT TECHNICIANS ARRIVED AT THE LOCATION, CORRECTED THE ISSUES AND MADE THE AREA SAFE.

PHMSA trend classification: not significant, not serious.

PHMSA standardized cause: EQUIPMENT FAILURE — MALFUNCTION OF CONTROL/RELIEF EQUIPMENT.

PHMSA indexed costs: $2,208 reported total cost, $1,642.578 in 1984 dollars, $2,332.995 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.