# KM INTERSTATE GAS TRANSMISSION CO — Gas transmission and gathering — incident on 2010-03-09

- **operation:** document
- **citation:** PHMSA Report 20100012
- **title:** KM INTERSTATE GAS TRANSMISSION CO — Gas transmission and gathering — incident on 2010-03-09
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2010-04-07
- **effective on:** 2010-03-09
- **summary:** Gas transmission and gathering incident in ROSELAND, ADAMS County, NE. Reported cause: MATERIAL FAILURE OF PIPE OR WELD. Reported consequences: 0 fatalities, 0 injuries, 2535 NATURAL GAS released, $21,200 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-3a73faf434915dc2d0fdb330.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-3a73faf434915dc2d0fdb330.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-3a73faf434915dc2d0fdb330
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident in ROSELAND, ADAMS County, NE. Reported cause: MATERIAL FAILURE OF PIPE OR WELD. Reported consequences: 0 fatalities, 0 injuries, 2535 NATURAL GAS released, $21,200 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20100012.

Operator ID: 1007.

Reported incident date: 3/9/2010 16:02.

Location detail: 3389+75

Cause detail: DESIGN-, CONSTRUCTION-, INSTALLATION-, OR FABRICATION-RELATED

Cause detail: A METALLURGICAL ANALYSIS OF THE FAILURE WAS CONDUCTED. THE CONCLUSION OF THAT ANALYSIS IS THAT THIS REPORT IS SELF CONTAINED AND NO FURTHER INFORMATION IS REQUIRED TO COMPLETE THIS REPORT.

PHMSA trend classification: not significant, not serious.

PHMSA standardized cause: MATERIAL FAILURE OF PIPE OR WELD — CONSTRUCTION, INSTALLATION OR FABRICATION-RELATED.

PHMSA indexed costs: $55,297 reported total cost, $33,343.588 in 1984 dollars, $55,629.757 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 1258