{"operation":"document","citation":"PHMSA Report 20030049","title":"EL PASO FIELD SERVICES — Gas transmission and gathering — incident on 2003-04-23","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2003-05-14","effective_on":"2003-04-23","summary":"Gas transmission and gathering incident in WICKETT, WARD County, TX. Reported cause: 24. Reported consequences: 0 fatalities, 0 injuries, $110,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-3c373a8b946b85a4a7d424ed.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-3c373a8b946b85a4a7d424ed.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-3c373a8b946b85a4a7d424ed","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/3f48859a-5658-4f64-acf0-e33e632af625?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%202002%20to%20December%202009.zip","body":"Gas transmission and gathering incident in WICKETT, WARD County, TX. Reported cause: 24. Reported consequences: 0 fatalities, 0 injuries, $110,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20030049.\n\nOperator ID: 30950.\n\nReported incident date: 4/23/2003.\n\nCause detail: MISCELLANEOUS\n\nCause detail: ON APRIL 23, 2003, CASING VENT WAS FOUND LEAKING GAS TO THE ATMOSPHERE FROM PIPELINE. LOCATION WAS APPROXIMATELY 1 MILE EAST OF WICKETT, TX, AT HIGHWAY SPUR 57 AND RAILROAD CROSSING. SHORTED PIPE CASING IS SUSPECTED FACTOR OF CONTRIBUTING TO THE LEAK. PIPELINE CROSSING WAS ABANDONED IN PLACE. NEW PIPELINE CROSSING WAS BORED UNDER HIGHWAY AND RAILROAD CROSSING.\n\nPHMSA trend classification: significant incident, not serious.\n\nPHMSA standardized cause: ALL OTHER CAUSES — MISCELLANEOUS.\n\nPHMSA indexed costs: $110,000 reported total cost, $72,049.341 in 1984 dollars, $134,687.266 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1251}