# TRANSWESTERN PIPELINE COMPANY LLC — Gas transmission and gathering — incident on 2018-04-24

- **operation:** document
- **citation:** PHMSA Report 20180055
- **title:** TRANSWESTERN PIPELINE COMPANY LLC — Gas transmission and gathering — incident on 2018-04-24
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-05-21
- **effective on:** 2018-04-24
- **summary:** Gas transmission and gathering incident in JAL, LEA County, NM. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 13090 NATURAL GAS released, $300,028 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-4ec63b8ce7876852b51e5b5a.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-4ec63b8ce7876852b51e5b5a.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-4ec63b8ce7876852b51e5b5a
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident in JAL, LEA County, NM. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 13090 NATURAL GAS released, $300,028 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20180055.

Operator ID: 19610.

Reported incident date: 4/24/2018 13:47.

Location detail: 554+78

Cause detail: EXCAVATION DAMAGE BY THIRD PARTY

Cause detail: NOTIFICATION ISSUE

Cause detail: NO NOTIFICATION MADE TO THE ONE-CALL CENTER/811

Cause detail: ON 4/24/18, A CALL WAS RECEIVED FROM A THIRD PARTY CONTRACTOR THAT HAD STRUCK AND DAMAGED THE TRANSWESTERN 30" WEST TEXAS LATERAL LOOP PIPELINE. THE LINE SEGMENT WAS ISOLATED AND BLOWN DOWN. ON 4/25, THE CONTRACTOR WAS MOBILIZED FOR REPAIRS. ON 4/26, THE PERMANENT PIPE REPLACEMENT REPAIRS WERE COMPLETED AND THE PIPELINE WAS RETURNED TO SERVICE. THE INITIAL NRC TELEPHONIC NOTIFICATION WAS MADE ON 4/24 - NRC#1210226, AND THE PHMSA AID WAS NOTIFIED. THE 48 HOUR NRC NOTIFICATION WAS MADE ON 4/26 - NRC #1210409, AND THE PHMSA AID WAS NOTIFIED THAT THE LINE WAS RETURNED TO SERVICE.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.

PHMSA indexed costs: $376,048 reported total cost, $214,308.048 in 1984 dollars, $440,115.721 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 1674
