{"operation":"document","citation":"PHMSA Report 20150052","title":"ATMOS PIPELINE - TEXAS — Gas transmission and gathering — incident on 2015-03-19","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-04-16","effective_on":"2015-03-19","summary":"Gas transmission and gathering incident in LAKE DALLAS, DENTON County, TX. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 5793 NATURAL GAS released, $25,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-4f094b5fd811a6084f13f872.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-4f094b5fd811a6084f13f872.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-4f094b5fd811a6084f13f872","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip","body":"Gas transmission and gathering incident in LAKE DALLAS, DENTON County, TX. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 5793 NATURAL GAS released, $25,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20150052.\n\nOperator ID: 31978.\n\nReported incident date: 3/19/2015 15:47.\n\nLocation detail: 1781+30\n\nCause detail: EXCAVATION DAMAGE BY THIRD PARTY\n\nCause detail: EXCAVATION ISSUE\n\nCause detail: IMPROPER EXCAVATION PRACTICE NOT LISTED ABOVE\n\nCause detail: THIRD PARTY EXCAVATOR HAD CALLED IN, AND ACCURATE LOCATES WERE PERFORMED. THE THIRD PARTY EXCAVATOR DID NOT CONTACT THE OPERATOR PRIOR TO EXPOSING THE ACTIVE PIPELINE. THE EXCAVATOR EXPOSED AN ABANDONED SECTION OF 16\" PIPE, THEY ASSUMED IT TO BE ACTIVE. THE EXCAVATOR DID NOT CONTACT THE OPERATOR TO CONFIRM IF THE LINE WAS ACTIVE OR NOT. DURING THE BORING PROCESS, THE ACTIVE 12\" LINE WAS STRUCK. THE 12\" LINE WAS 8.5 FEET BELOW THE ABANDONED 16\" LINE.\n\nPHMSA trend classification: not significant, not serious.\n\nPHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.\n\nPHMSA indexed costs: $76,200 reported total cost, $47,248.952 in 1984 dollars, $92,085.955 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1543}