# TENNESSEE GAS PIPELINE CO — Gas transmission and gathering — incident on 2003-06-19

- **operation:** document
- **citation:** PHMSA Report 20030064
- **title:** TENNESSEE GAS PIPELINE CO — Gas transmission and gathering — incident on 2003-06-19
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2003-07-09
- **effective on:** 2003-06-19
- **summary:** Gas transmission and gathering incident. Reported cause: 3. Reported consequences: 0 fatalities, 0 injuries, $505,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-8f3537f2cb2666984ea55dca.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-8f3537f2cb2666984ea55dca.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-8f3537f2cb2666984ea55dca
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/3f48859a-5658-4f64-acf0-e33e632af625?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%202002%20to%20December%202009.zip
**body:**

Gas transmission and gathering incident. Reported cause: 3. Reported consequences: 0 fatalities, 0 injuries, $505,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20030064.

Operator ID: 19160.

Reported incident date: 6/19/2003.

Cause detail: EARTH MOVEMENT

Cause detail: STONE ENERGY CONTACTED TENNESSEE GAS PIPELINE TO REPORT BUBBLES IN THE AREA OF SOUTH PASS BLOCK 38, NEAR THEIR TIE-IN. THE PIPELINES ARE LOCATED IN A KNOWN MUDSLIDE AREA. THE TWO PIPELINES APPARENTLY CAME INTO CONTACT WITH ONE ANOTHER AFTER A MUDSLIDE OCCURRED. THE TENNESSEE LINE WAS FOUND WITH APPROXIMATELY 11 FEET OF SOIL OVERBURDEN, FOLLOWING DAMAGE INSPECTION. APPARENTLY, THE 8" STONE ENERGY LINE CAME INTO CONTACT WITH THE 12" TENNESSEE 526A-2400 LINE, WHERE THE LINES CROSSED, CAUSING SOME DAMAGE TO THE TOP OF THE 12" LINE.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: NATURAL FORCE DAMAGE — EARTH MOVEMENT.

PHMSA indexed costs: $505,000 reported total cost, $322,047.414 in 1984 dollars, $788,934.747 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 1400