{"operation":"document","citation":"PHMSA Report 20150135","title":"ATMOS ENERGY CORPORATION - KY/MID-STATES (KENTUCKY) — Gas transmission and gathering — incident on 2015-10-16","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-11-13","effective_on":"2015-10-16","summary":"Gas transmission and gathering incident in SHELBYVILLE, SHELBY County, KY. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 16500 NATURAL GAS released, $93,766 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-9b983d633d0288f8789e0b1f.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-9b983d633d0288f8789e0b1f.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-9b983d633d0288f8789e0b1f","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip","body":"Gas transmission and gathering incident in SHELBYVILLE, SHELBY County, KY. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 16500 NATURAL GAS released, $93,766 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20150135.\n\nOperator ID: 22476.\n\nReported incident date: 10/16/2015 11:30.\n\nLocation detail: LKSURV968\n\nCause detail: EXCAVATION DAMAGE BY THIRD PARTY\n\nCause detail: NOTIFICATION ISSUE\n\nCause detail: NO NOTIFICATION MADE TO THE ONE-CALL CENTER/811\n\nCause detail: FARMER DAMAGED 8\" LINE WILE CLEANING AND EXTENDING POND NEAR HIS PROPERTY. THE FARMER (PROPERTY OWNER) DID NOT CALL 811 TO HAVE FACILITIES LOCATED PRIOR TO EXCAVATION. MUELLER STOP FITTINGS WERE INSTALLED AND TEMPORARY BYPASS INSTALLED TO MAINTAIN GAS SERVICE. FIRST RESPONDERS AND ATMOS ENERGY EMERGENCY RESPONDERS WORKED CLOSELY TOGETHER TO PROTECT LIFE AND PROPERTY DURING THE ENTIRE REPAIR PROCESS. ATMOS ENERGY WAS ALSO ASSISTED BY 25-30 LARGE INDUSTRIAL CUSTOMERS TO HELP MAINTAIN GAS SERVICE TO 12,500 RESIDENTIAL AND SMALL COMMERCIAL CUSTOMERS.\n\nPHMSA trend classification: significant incident, not serious.\n\nPHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.\n\nPHMSA indexed costs: $188,009 reported total cost, $117,322.975 in 1984 dollars, $227,034.802 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1658}