# ENBRIDGE PIPELINES (EAST TEXAS) L.P. — Gas transmission and gathering — incident on 2014-01-26

- **operation:** document
- **citation:** PHMSA Report 20140023
- **title:** ENBRIDGE PIPELINES (EAST TEXAS) L.P. — Gas transmission and gathering — incident on 2014-01-26
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2014-02-25
- **effective on:** 2014-01-26
- **summary:** Gas transmission and gathering incident in GOODRICH, POLK County, TX. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 78042 NATURAL GAS released, $0 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-b931830cf324903ce3cc3679.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-b931830cf324903ce3cc3679.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-b931830cf324903ce3cc3679
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident in GOODRICH, POLK County, TX. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 78042 NATURAL GAS released, $0 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20140023.

Operator ID: 31613.

Reported incident date: 1/26/2014 8:45.

Cause detail: MALFUNCTION OF CONTROL/RELIEF EQUIPMENT

Cause detail: AT 8:45 THE CONTROL CENTER NOTIFIED OPERATIONS THAT A PRESSURE DROP WAS INDICATED ON THE DD AND CLARITY SYSTEM. OPERATIONS WAS DISPACHED AND ARRIVED AT THE GOODRICH COMPRESSOR STATION AT 09:15. OPERATIONS FOUND THE COMPRESSOR STATION HAD EXPERIENCED A POWER FAILURE CAUSING AN ESD OF THE STATION. A 20" SUCTION VALVE FAILED TO CLOSE DURING THE ESD ALLOWING ADDITIONAL GAS TO BE BLOWN DOWN. THE VALVE WAS MANUALLY SHUT AT 09:35 AND PRESSURE BEGAN TO INCREASE TO NORMAL OPERATING PRESSURE. REPORTED DUE TO UNINTENIONAL GAS LOSS EXCEEDING THE 3 MMCF LIMIT AND THE COST OF GAS LOSS EXCEEDING $50,000.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: EQUIPMENT FAILURE — MALFUNCTION OF CONTROL/RELIEF EQUIPMENT.

PHMSA indexed costs: $390,210 reported total cost, $269,935.114 in 1984 dollars, $331,439.317 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false