{"operation":"document","citation":"PHMSA Report 20150121","title":"GULF SOUTH PIPELINE COMPANY, LP — Gas transmission and gathering — incident on 2015-09-18","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-10-12","effective_on":"2015-09-18","summary":"Gas transmission and gathering incident in TURKEY CREEK, EVANGELINE County, LA. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 7820 NATURAL GAS released, $40,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-c091743fda3c4822f0418ca3.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-c091743fda3c4822f0418ca3.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-c091743fda3c4822f0418ca3","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip","body":"Gas transmission and gathering incident in TURKEY CREEK, EVANGELINE County, LA. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 7820 NATURAL GAS released, $40,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20150121.\n\nOperator ID: 31728.\n\nReported incident date: 9/18/2015 9:45.\n\nLocation detail: 60\n\nCause detail: EXCAVATION DAMAGE BY THIRD PARTY\n\nCause detail: NOTIFICATION ISSUE\n\nCause detail: NO NOTIFICATION MADE TO THE ONE-CALL CENTER/811\n\nCause detail: GULF SOUTH PIPELINE, LP EXPERIENCED A PIPELINE FAILURE ON ITS INDEX 202 IN EVANGELINE PARISH, LA NEAR TURKEY CREEK AS THE RESULT OF THIRD-PARTY DAMAGE. PIPELINE WAS STRUCK BY A PARISH ROAD CONTRACTOR CLEANING THE ROADWAY DITCH. NO ONE-CALL WAS MADE BY THE ROAD CONTRACTOR. NO INJURIES WERE INCURRED.\n\nPHMSA trend classification: not significant, not serious.\n\nPHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.\n\nPHMSA indexed costs: $65,917 reported total cost, $41,620.916 in 1984 dollars, $79,488.752 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1392}