# SEA ROBIN PIPELINE CO — Gas transmission and gathering — incident on 2017-10-19

- **operation:** document
- **citation:** PHMSA Report 20170104
- **title:** SEA ROBIN PIPELINE CO — Gas transmission and gathering — incident on 2017-10-19
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-11-15
- **effective on:** 2017-10-19
- **summary:** Gas transmission and gathering incident. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 1820 NATURAL GAS released, $2,600 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-de58c82e004c068f8ad09c43.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-de58c82e004c068f8ad09c43.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-de58c82e004c068f8ad09c43
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident. Reported cause: EQUIPMENT FAILURE. Reported consequences: 0 fatalities, 0 injuries, 1820 NATURAL GAS released, $2,600 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20170104.

Operator ID: 18152.

Reported incident date: 10/19/2017 15:02.

Cause detail: NON-THREADED CONNECTION FAILURE

Cause detail: AN NRC NOTIFICATION (NRC# 1193740) WAS MADE BASED ON AN OFFSHORE LEAK NEAR OUR FACILITIES LOCATED IN SHIP SHOAL 241 ON 10/19/17. LINE WAS ISOLATED AND DEPRESSURIZED UNTIL REPAIRS COULD BE MADE. THE 48 HR NRC# 1193922 REPORT WAS MADE ON 10/21. OFFSHORE WEATHER CONDITIONS CAUSED A DELAY IN DETERMINING THE SOURCE OF THE LEAK AND THE REPAIRS. A NEW NRC# 1194755 NOTIFICATION WAS MADE IDENTIFYING SEA ROBIN AS THE RESPONSIBLE PARTY ON 10/31, THE 48 HR NRC# 1194979 WAS MADE ON 11/02/17. THE CENTRALIZED PHMSA ACCIDENT INVESTIGATION DIVISION WAS PROVIDED DAILY UPDATES FROM 10/19/17 THROUGH THE RESTART OF THE LINE ON 11/09/17.

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: EQUIPMENT FAILURE — NON-THREADED CONNECTION FAILURE.

PHMSA indexed costs: $168,567 reported total cost, $124,307.092 in 1984 dollars, $199,470.553 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 1569