{"operation":"document","citation":"PHMSA Report 20190047","title":"FLORIDA GAS TRANSMISSION CO — Gas transmission and gathering — incident on 2019-03-21","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2019-04-17","effective_on":"2019-03-21","summary":"Gas transmission and gathering incident in PINECREST, MIAMI DADE County, FL. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 5017 NATURAL GAS released, $226,912 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-ea467d084f30bed3c76190ea.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-ea467d084f30bed3c76190ea.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-ea467d084f30bed3c76190ea","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip","body":"Gas transmission and gathering incident in PINECREST, MIAMI DADE County, FL. Reported cause: EXCAVATION DAMAGE. Reported consequences: 0 fatalities, 0 injuries, 5017 NATURAL GAS released, $226,912 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20190047.\n\nOperator ID: 5304.\n\nReported incident date: 3/21/2019 16:38.\n\nLocation detail: 7235+24\n\nCause detail: EXCAVATION DAMAGE BY THIRD PARTY\n\nCause detail: NOTIFICATION ISSUE\n\nCause detail: NO NOTIFICATION MADE TO THE ONE-CALL CENTER/811\n\nCause detail: 3/21/19 17:41 EST OPERATIONS ARRIVED ON SITE AND CONFIRMED LINE HIT. 3/21/19 17:48 EST LINE SHUT IN AND ISOLATED. 3/21/19 19:55 EST NRC TELEPHONIC NOTIFICATION MADE NRC#1240712. 3/21/19 20:20 EST PHMSA AID NOTIFIED. 3/21/19 21:00 EST FPL POWER RESTORED TO CUSTOMERS AND EVACUEE RETURNED HOME. 3/23/19 16:09 EST REPLACEMENT COMPLETED AND LINE PUT BACK IN SERVICE. 3/23/19 17:54 EST 48-HOUR NRC NOTIFICATION MADE NRC#1240870. 3/23/19 18:23 EST PHMSA AID UPDATED. THE SUPPLEMENTAL REPORT SUBMITTED 8/13/19, CORRECTED PART A: 5 - LATITUDE/LONGITUDE.\n\nPHMSA trend classification: significant incident, not serious.\n\nPHMSA standardized cause: EXCAVATION DAMAGE — THIRD PARTY EXCAVATION DAMAGE.\n\nPHMSA indexed costs: $262,526 reported total cost, $134,435.875 in 1984 dollars, $305,323.86 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1648}