{"operation":"document","citation":"PHMSA Report 20150113","title":"SEA ROBIN PIPELINE CO — Gas transmission and gathering — incident on 2015-08-18","source_type":"incident","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2015-09-17","effective_on":"2015-08-18","summary":"Gas transmission and gathering incident. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 6881 NATURAL GAS released, $200,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-incident-eff611f1a73f0ffe6ff4805b.json","markdown":"https://regulus.evalyn.ai/document/phmsa-incident-eff611f1a73f0ffe6ff4805b.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-incident-eff611f1a73f0ffe6ff4805b","source_url":"https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip","body":"Gas transmission and gathering incident. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 6881 NATURAL GAS released, $200,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.\n\nReport number: 20150113.\n\nOperator ID: 18152.\n\nReported incident date: 8/18/2015 9:30.\n\nCause detail: INTERNAL CORROSION\n\nCause detail: AT APPROXIMATELY 9:30 AM ON 8/18/2015, GAS CONTROL RECEIVED A CALL FROM THE UNITED STATES COAST GUARD REPORTING SEEING BUBBLES IN THE AREA NEAR A SEA ROBIN PIPELINE IN THE SOUTH TIMBALIER 189 AREA. THE NRC WAS NOTIFIED (NRC # 1125967), AT 9:30 AM ON 8/18/15 OF A POSSIBLE LEAK. WE WERE ABLE TO MAKE A FLIGHT ON 8/18/15 AND BASED ON THE COORDINATES FOR THE LEAK, WE SHUT DOWN THE PIPELINE AT 10:30 AM ON 8/21/15. IT TOOK 2 DAYS TO GET THE DSV ON SITE DUE TO WEATHER. THE PIPELINE WAS REPAIRED AND RESTARTED AT 2:30 AM ON 9/1/2015.\n\nPHMSA trend classification: significant incident, not serious.\n\nPHMSA standardized cause: CORROSION — INTERNAL.\n\nPHMSA indexed costs: $224,434 reported total cost, $122,989.304 in 1984 dollars, $274,908.251 in current-year dollars.\n\nPHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.","truncated":false,"body_characters":1431}