# GULF SOUTH PIPELINE COMPANY, LP — Gas transmission and gathering — incident on 2016-03-14

- **operation:** document
- **citation:** PHMSA Report 20160029
- **title:** GULF SOUTH PIPELINE COMPANY, LP — Gas transmission and gathering — incident on 2016-03-14
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2016-04-07
- **effective on:** 2016-03-14
- **summary:** Gas transmission and gathering incident in OAKDALE, ALLEN County, LA. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 2923 NATURAL GAS released, $68,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: not significant, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-f48d5a3d24ad1059c09a60f6.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-f48d5a3d24ad1059c09a60f6.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-f48d5a3d24ad1059c09a60f6
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident in OAKDALE, ALLEN County, LA. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 2923 NATURAL GAS released, $68,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20160029.

Operator ID: 31728.

Reported incident date: 3/14/2016 9:55.

Location detail: 30

Cause detail: INTERNAL CORROSION

Cause detail: GULF SOUTH PIPELINE WAS NOTIFIED OF A LEAK ON ITS INDEX 202, IOWA-MARKSVILLE 6-4-3" LINE AT MP 30.84. THE SECTION WAS ISOLATED AND BLOWN DOWN AND NEW PIPE WAS INSTALLED.

PHMSA trend classification: not significant, not serious.

PHMSA standardized cause: CORROSION — INTERNAL.

PHMSA indexed costs: $76,104 reported total cost, $40,759.797 in 1984 dollars, $93,668.472 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.
- **truncated:** false
- **body characters:** 1112
