# SEA ROBIN PIPELINE CO — Gas transmission and gathering — incident on 2017-11-05

- **operation:** document
- **citation:** PHMSA Report 20170113
- **title:** SEA ROBIN PIPELINE CO — Gas transmission and gathering — incident on 2017-11-05
- **source type:** incident
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2017-11-29
- **effective on:** 2017-11-05
- **summary:** Gas transmission and gathering incident. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 300 NATURAL GAS released, $210,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings. PHMSA trend classification: significant incident, not serious.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-incident-fa5d628f7d5fb7436040cefb.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-incident-fa5d628f7d5fb7436040cefb.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-incident-fa5d628f7d5fb7436040cefb
- **source url:** https://data.transportation.gov/api/views/27nc-rsge/files/2b05c2d8-d14a-4c56-ac1c-7d23a4bc31c8?download=true&filename=Gas%20Transmission%20%26%20Gathering%20Incident%20Data%20-%20January%202010%20to%20present.zip
**body:**

Gas transmission and gathering incident. Reported cause: CORROSION FAILURE. Reported consequences: 0 fatalities, 0 injuries, 300 NATURAL GAS released, $210,000 reported property damage. Operator-reported incident data submitted to PHMSA, generally within 30 days. Records may be supplemented or corrected and do not represent final agency causal findings.

Report number: 20170113.

Operator ID: 18152.

Reported incident date: 11/5/2017 16:50.

Cause detail: INTERNAL CORROSION

Cause detail: ON 11/5/17, A PRODUCER (FIELDWOOD) REPORTED BUBBLES FROM AN UNKNOWN SOURCE IN THE AREA. ON 11/6/17, SEA ROBIN PERSONNEL ARRIVED AND CLAIMED RESPONSIBILITY DUE TO THE PROXIMITY OF FACILITIES (NRC# 1195323). ON 11/8/17, THE 48 HOUR UPDATE WAS MADE TO THE NRC,(#1195759). DAILY UPDATES WERE PROVIDED TO THE PHMSA AID, FROM 11/6/17 THROUGH THE RESTART OF THE LINE. SUPPLEMENTAL REPORT SUBMITTED 11/30/17, CORRECTED PART A QUESTIONS - (4) AND (19A).

PHMSA trend classification: significant incident, not serious.

PHMSA standardized cause: CORROSION — INTERNAL.

PHMSA indexed costs: $276,004 reported total cost, $137,681.424 in 1984 dollars, $332,027.234 in current-year dollars.

PHMSA trend flags, standardized causes, and indexed costs are analytical fields added to operator-reported incident data. They do not represent final agency causal findings.