# Quality Control Department — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 00-0148
- **title:** Quality Control Department — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2000-06-28
- **effective on:** Not available
- **summary:** 00-0148 response to Quality Control Department concerning 178.603.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-00-0148.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-00-0148.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-00-0148
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2000/000148.pdf
**body:**

<<<PAGE 1>>>

of Transportation
U.S. Department
Washington, D.C
Special Programs
Research and
Administration
JUN 28 2000
Mr. Colum O'Hara
Ref. No. 00-0148
Phoenix Container, Inc.
Quality Control Department
1202 Airport Road
N. Brunswick, New Jersey 08902
Dear Mr. O'Hara:
This is in response to your letter dated May 9, 2000, requesting clarification of the drop test
procedures for performance oriented packagings, such as 1A1 and 1A2 steel drums, under
§ 178.603 (f)(1) of the Hazardous Materials Regulations (HMR; 49 CFR Parts 171-180). You
state that you were advised on May 8, 2000, by the Hazardous Materials Information Center that
equilibrium could be reached by letting the contents of the package settle. Specifically, you ask if
this is an acceptable method to reach equilibrium inside a container once it has been drop tested.
There are several acceptable methods for achieving equilibrium between the internal and external
pressures of the container. These methods include: letting the package sit for a time to allow the
contents of the package to settle; or by drilling a hole into the vapor or air space to achieve
equilibrium in the package after the drop test.
I hope this answers your inquiry.
Sincerely,
Arn Hillis,
Delmer F. Billings
Chief, Standards Development
Office of Hazardous Materials Standards
178.603
000148

<<<PAGE 2>>>

Boothe
May 9, 2000
$178.603
Mr. Edward Mazzullo
Director of the Office of Hazardous Materials Standards
00 - 0148
U.S. DOT / RSPA - DHM - 10
400 7* Street
SW Washington, DC 20590
Phoenix Container, Inc., is a metal container manufacturer, which produces metal
Dear Mr. Mazzullo,
Phoenix Container, Inc.
containers ranging in capacities from two gallon through six and a half gallons. A large
percentage of containers produced by Phoenix Container, Inc., are performance
orientated packagings including both 1A1 and 1A2 packages. This facility has obtained
the Manufacturing Number-M5380 and has begun to test and certify its containers in
conjunction to the Code of Federal Regulations Number 49.
Phoenix Container, Inc., formally requests clarification in regards to the drop test, Statute
178.603 (f) (I), prescribed in the 49 CFR. Specifically, this department petitions
clarification in regards to how equilibrium is reached inside the container once it has been
dropped.
This department had contacted the U.S. Department of Transportation, Hazardous
Materials Regulations Information Center, (800) 467-4922, on May 8, 2000, at 10:40
clarification in regards to how equilibrium is reached inside the container once it has been
A.M., to clarify Statute 178.603 (f) (1). Phoenix Container, Inc., specifically requested
dropped. The information Phoenix Container, Inc., received from Ms. Lorena Alvarez,
an Information Specialist for the U.S. DOT, suggested that equilibrium would be reached
by letting the contents of the package settle. Ms. Alvarez further stated that the test is
designed to see if a package is able to stand a spike in the internal pressure after it has
been dropped.
Please indicate if the dropped container reaches equilibrium between the internal and
external pressures if the container is left untouched and its liquid contents are allowed to
settle. Your guidance and decision will be greatly appreciated. Thank you in advance for
your time and cooperation in this matter.
Sincerely,
O Har
Phoenix Container, Inc.
Quality Control Department
cc: KS
TB
1202 Airport Rpite
N. Brunswick, NJ 08902
Phone
732.247.6700
Fax
732.247.0502
- **truncated:** false