# Specialized Transport Repair — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 00-0189
- **title:** Specialized Transport Repair — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2001-01-09
- **effective on:** Not available
- **summary:** 00-0189 response to Specialized Transport Repair concerning 180.403.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-00-0189.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-00-0189.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-00-0189
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2000/000189.pdf
**body:**

<<<PAGE 1>>>

of Transportation
U.S. Department
JAN - 9 2001
Washington, D.C.
Special Programs
Research and
Administration
Mr. John P. McGavis
Ref. No. 00-0189
100 Commerce Drive
Specialized Transport Repair
Buffalo, NY 14218
Dear Mr. McGavis:
This responds to your letter requesting clarification of the
modification, repair, and certification requirements of MC 307
and DOT 407 cargo tank motor vehicles under the Hazardous
Materials Regulations (HMR; 49 CFR Parts 171-180).
Specifically,
manway covers would be considered a repair, rather than a
you inquire whether the installation of larger nozzles into
modification and, therefore, would not require certification by a
Design Certifying Engineer.
You state that the 1998 National
of a repair as "the installation of new nozzles or openings of
Board Inspection Code, in Appendix 6 (b) (9), describes one example
such
a size that reinforcement is not a consideration."
The installation of new nozzles in a manhole cover that differ in
size or design from the originally installed nozzles would be
considered a design change and categorized as a modification, not
a repair under the HMR.
A design type change requires approval
and certification by a Design Certifying Engineer as specified in
$ 180.413 of the HMR.
HI. Re deraned any
As defined in § 180.403, a "modification"
means
cargo tank or cargo tank motor vehicle that affects its
any change to the original design and construction of a
structural integrity or lading retention capability. Excluded
are the replacement of components of similar design
and of the
same size.
I trust this satisfies your inquiry. Please contact us if we can
be of further assistance.
• Sincerely,
Hotte z michele
Hattie I. Mitchell
Chief, Regulatory Review and Reinvention
Office of Hazardous Materials Standards
180.403
000189

<<<PAGE 2>>>

•
GOT
100 Commerce Drive
Buffalo, NY 14218
SPECIALIZED TRANSPORT
Phone (716) 827-8265
REPAIR Inc.
Fax (716) 827-7231
Stevens
June 27, 2000
Federal Motor Carrier Safety Administration
Ref. No. 00-0157
5180.403
Research and Special Programs Administration
Hazardous Materials Division
00-0189
4007° St. SW
Washington, DC 20590
Mr. Daniel Shelton,
This letter is a continuation of our dialogue regarding the addition of nozzles into the
mace yater 620-0, 5307 athl this would ge considered am recenton an a such would
nanufacturer's certificate. t
construction, repair, and alteration of these tanks would follow ASME and National Board
standards. The National Board Code clearly states in Appendix 6[B]|?] as an example of a
repair (as opposed to alterations):
"installation of new nozzles or openings of such a size that reinforcement is not a
consideration (for example, the installation of a 3 NPS nozzle to a shell or head of 3/8 inch
or less in thickness or the addition of a 2 NPS nozzle to a shell or head of any thickness)."
(Per ASME UG-36[c][3] [a] this nozzle does not require reinforcement.)
The example National Board chose is exactly the same as the installation we have been
be called for. Also the associated documents would not be required
liscussing. If in fact this is a "repair", the role of the Design Certifying Engineer would not
1. Can installation of 3" nozzles be treated as a "repair", considering that this is a specifc
Our questions are:
2. I so, cola Design raging Beiner services and related documentation become
Thank you,
Tohn P. McGavis
Enc: National Board Appendix 6 [B][9]
- **truncated:** false
- **body characters:** 3439