# Fort Vale Engineering Limited — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 07-0147R
- **title:** Fort Vale Engineering Limited — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2008-07-23
- **effective on:** Not available
- **summary:** 07-0147R response to Fort Vale Engineering Limited concerning 178.274.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-07-0147r.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-07-0147r.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-07-0147r
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2007/070147R.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
Mr. Dave Bailey, Chief Engineer
Fort Vale Engineering Ltd
Parkfield Works
Brunswick St
Nelson
Lancs
UK BB9 OSG
Ref. No. 07-0147R
Dear Mr. Bailey:
This serves as a retraction of our March 5,2008 (Ref. No. 07-0147) letter responding to your
request for clarification of the Hazardous Materials Regulations (HMR; 49 CFR Parts 17 1-1 80)
applicable to shear sections on IMlO1 and UN portable tanks. Upon further review, it is
necessary to clarify our response to Q3. Your questions are paraphrased and answered below:
We apologize for any inconvenience this may have caused.
Q1. You understand that the shear section or sacrificial device on UN portable tanks must break
at no more than 70% of the load that would cause failure to the internal self closing stop valve in
accordance with 8 178.274(e)(l) . You ask if the removal of 30% of the wall section would
result in a 70% stress reduction? If so, would this also satisfy the portable tank shear section
requirement in 5 178.270-1 2(d)?
A1 . Reduction of the wall section by 30% may satisfy the 70% stress requirement specified in
5 178.274(e)(l) provided an analysis of the shear section strength and expected performance
shows that the shear section would break at no more than 70% of the load that would cause
failure to the internal self closing stop valve. Section 178.270-1 2(d) requires a shear section to
be located outboard of each internal discharge valve seat and within 10.2cm (4 inches) of the
vessel. The shear section must break under strain without affecting the product retention
capabilities of the tank and any attachments. It is the manufacturer's responsibility to perform an
analysis of the shear section design, dimensions, and expected performance to determine the
orientation of the shear section installation required to meet the minimum requirements of
$3 178.274(e)(l) and 178.270-12(d).
42. As far as you can determine the only shear section calculation available is TTMA RP 86-98,
"Emergency Valve Shear Section Strength Calculation". Is the use of the TTMA RP 86-98
calculation considered the best practice for calculating the valve shear section strength for
portable tanks?
A2. The HMR requirement applicable to portable tank shear sections is a performance standard.

<<<PAGE 2>>>

Under the HMR, various methods of analysis or test may be used to evaluate the expected
strength and performance of the shear section relative to the strength of internal self closing stop
valve, and their configuration on the tank. The HMR do not specifically reference the TTMA RP
86-98 shear section strength calculation. However, it is the opinion of this office that the TTMA
RP 86-98 shear section strength calculation is an acceptable method for calculating the expected
performance of a shear section for compliance with the HMR.
43. In a Safety Advisory Notice (62 FR 37638), PHMSA clarified that internal discharge valves
and shear sections are safety devices required on the bottom-outlets of IM portable tanks in
hazardous material service to prevent significant release of lading when damage is sustained at
the fillingldischarge connection. Does the performance standard allow for some leakage of the
tanks lading?
A3(a). For UN portable tanks, the shear section or sacrificial device must break at no more than
70% of the load that would cause failure of the internal self closing stop valve. Provided the
shear section satisfies this performance requirement, some leakage may occur.
A3(b). For IMlOl portable tanks, the performance requirement applicable to shear sections was
previously specified in 8 178.270-12(d) [Removed: 72 FR 55678 (HM-244); October 1,20071 of
the Hazardous Materials Regulations (HMR; 49 CFR Parts 17 1 - 180). The requirement specifies
that the shear section must break under strain without affecting the product retention capabilities
of the tank and any attachments. Therefore, there may be no leakage of lading from an IM 101
portable tank related to the performance of the shear section.
I hope this satisfies your inquiry. If we can be of further assistance, please contact us.
Sincerely, -
Director, Office of Hazardous
Materials Standards

<<<PAGE 3>>>

U.S. Department
of Transportation
Pipdlne and Hazardous
Material8 Safety
Admlnistratlon
1200 New Jersey Avenue, SE
Washington, D.C. 20590
Mr. Dave Bailey
Chief Engineer
Fort Vale Engineering Ltd
Parkfield Works
Brunswick St
Nelson
Lancs
UK BB9 OSG
Ref No. 07-0 147
Dear Mr. Bailey:
This is in response to your email on July 20,2007 regarding the Hazardous Materials
Regulations (HMR; 49 CFR 171-180) applicable to shear sections on IMlOl and UN portable
tanks. Your questions are summarized and answered as follows
Q1. You understand that the shear section or sacrificial device on UN portable tanks must break
at no more than 70% of the load that would cause failure to the internal self closing stop valve in
accordance with § 178.274(e)(l) . You ask if the removal of 30% of the wall section would
result in a 70% stress reduction? If so, would this also satism the portable tank shear section
requirement in $ 178.270- 12(d)?
Al . Reduction of the wall section by 30% may satisfy the 70% stress requirement specified in
6 178.274(e)(l) provided an analysis of the shear section strength and expected performance
shows that the shear section would break at no more than 70% of the load that would cause
failure to the intemal self closing stop valve. Section 178.270-1 2(d) requires a shear section to
be located outboard of each internal discharge valve seat and within 10.2cm (4 inches) of the
vessel. The shear section must break under strain without affecting the product retention
capabilities of the tank and any attachments. It is the manufacturer's responsibility to perform an
analysis of the shear section design, dimensions, and expected performance to determine the
orientation of the shear section installation required to meet the minimum requirements of
$8 178.274(e)(l) and 178.270- 12(d).
42. As far as you can determine the only shear section calculation available is TTMA RP 86-98,
"Emergency Valve Shear Section Strength Calculation". Is the use of the 'TTMA RP 86-98
calculation considered the best practice for calculating the valve shear section strength for
portable tanks?
A2. The HMR requirement applicable to portable tank shear sections is a performance standard.
Under the HMR, various methods of analysis or test may be used to evaluate the expected

<<<PAGE 4>>>

strength and performance of the shear section relative to the strength of internal self closing stop
valve, and their configuration on the tank. The HMR do not specifically reference the l-X'MA RP
86-98 shear section strength calculation. However, it is the opinion of this office that the TTMA
RP 86-98 shear section strength calculation is an acceptable method for calculating the expected
pedbrmance of a shear section for compliance with the HMR
43. In a Safety Advisory Notice (62 37638), PHMSA clarified that internal discharge valves
and shear sections are safety devices required on the bottom-outlets of IM portable taubin
hazardous material to prevent significant release of lading when damage is sustained at
the fillingldischarge connection. You ask for confirmation that the perEormance standard does in
k t allow for some leakage of the tanks lading, and that the groove is intended to protect the
tank.
A3. Provided the shear section or sacrificial device breaks at no more than 70% of the load that
would cause failure sf the internal self closing stop valve, some leakage of lading may occur.
The shear section is intended to protect the tank h m catastrophic failure when damage to the
fillingldischarge connection is sustained.
1 hope this satisfies your inquiry. If we can be of M e r assistance, please contact us.
/ &I&& stan& Development
Office of Hazardous Materials Standards

<<<PAGE 5>>>

kiche~l laub 3 1 7 3 . 3 2
Page 1 of 3
Drakeford, Carolyn <PHMSA>
. . ..~- .--. .....-.-.v.---... ..---.... - ...v-..,.. From: Mauullo, Ed <PHMSA> . , ,...... - *.r*.ble ??9ulrk .. . . . .. . - -,-.. . - .. .
07- 0 1.17
Sent: Monday, July 23,2007 8:37 AM
To: Drakeford, Carolyn cPHMSA>
Cc: Hochman, Charles <PHMSA>; Betts, Charles <PHMSA>; Gale, John <PHMSA>; Gorsky, Susan
<PHMSA>; Mazzullo, Ed <PHMSA>; Mitchell, Hattie <PHMSA>
Subject: FW: shear grooves
From: Dave Bailey [mailto:dbailey@fortvale.corn]
Sent: Friday, July 20, 2007 2:51 PM
To: Manullo, Ed <PHMSA>
Subject: shear grooves
Dear Ed
I have was given your contact details by Charles Hochman with. regards to the expectations of the DOT with
respect to the design and function of shear sections for IMlO1 and UN portable tanks chapters CFR 49 chapters
178.270- 12 (d) and 178.274 (e) (1) respectively.
My first questions relates to the design of the shear sections.
From discussions with Charles Hochman I understand that the 70 stress requirement for failure notated in
178.274 (e) (1) originates fiom the DOT 407 road tanks sections 178.345-1 (a) 178.345-8 (a) (4) a
extract from these paragraphs regarding the shear section is below
" Shear section means a s a c r i f i c i a l device fabricated i n such a
manner as t o abruptly reduce the w a l l thickness of the adjacent piping
or valve material by at least 30 percent."
Charles intimated that the removal of 30% of the valve body wall section would be sufficient. Can you
confirm then in simple terms that the removal the 30% wall section would result in the 70% stress
reduction and therefore the groove would conforms to the 178.270-12 (d) and 178.274 (e) (1)
As far as we can determine the only shear section calculation available is.
TTMA RP 86-98 "Emergency Valve Shear Section Strength Calculation".
In lieu of any alternative methods other than the wall reduction above we have used the TTMA RP 86-
98 calculation to determine the 70% shear stress reduction. Would you regard the use of this calculation
as the best practice to calculate the valve shear section?
My second area is regarding the shear groove performance
1 would like to understand the DOT'S expected and accepted performance of the shear grooves. Below is
a extract fiom the DOT in which a realistic view of some leakage may occur and that the groove is to
protect the tank.
1 would like to have conformation that this is the acceptance criteria used by DOT
[Federal Register: August 1, 1997 (Volume 62, Number 148)]

<<<PAGE 6>>>

Page 2 of 3
I [Notices]
[Page 41 481 -41 4821
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:frOlau97-1641
DEPARTMENT OF TRANSPORTATION
Research and Special Programs Administration
[Notice 97-61
Safety Advisory: Certified IM 101 and IM 102 Steel Portable Tanks
With Bottom Outlets Without Internal Discharge Valves or Shear Sections
AGENCY: Research and Special Programs Administration (RSPA), DOT.
ACTION: Safety advisory notlce; correction.
SUMMARY: RSPA published a w fety advisory notice in the Federal
Register (62 FR 37638) under notice 97-6 on July 14, 1997. The words
' 'capable of being closed from a location" were inadvertently omitted
in the advisory notice for material quoted from 49 CFR 173.32c(g)(Z).
This document corrects this error and, for the convenience of readers,
reprints the text of the July 14, 1997 notice in its entirety, as
follows:
This is to notify owners and users of DOT specification IM 101 and
IM 102 portable tanks with filling or discharge connections below the
normal liquid level that these tanks may be used for shipping hazardous
materials only if they have internal discharge valves and shear
sections. Internal discharge valves and shear sections are safety
devices required on the bottom-outlek of IM portable tanks in
hazardous material service to prevent significant release of lading
when damage is sustained at the filling/discharge connection. Without
those safety features, damage to a bottom outlet is far more likely to
result in loss of a tank's entire lading.
[[Page 41 48211
David Bailey
Chief Engineer
Fort Vale Engineering Ltd
+44 (0) 1282 440026
Fax +44 (0) 1282 440046
- DISCLAIMER FOR AND ON BEHALF OF FORT VALE ENGINEERING LTD. - This e-mail and the communication
contained herein is private and confidential and intended for the specified recipient only. If an addressing or transmission

<<<PAGE 7>>>

Page 3 of 3
error has misdirected this e-mail, it should not be read by anyone but the intended recipient. Please notify the author by
replying to this e-mail. If you are not the specified intended recipient you must not use, disclose, distribute, copy, print, or
rely on this e-mail.
This message has been scanned for viruses by Mailcontrol, a service from Blackspider Technolorries.
Fort Vale Engineering Limited is a company registered i n England and Wales. Registered number
Registered o f f i c e : Parkfield Works, Brunswick Street, Nelson, Lancashire, BBgOSG, England
- **truncated:** false
- **body characters:** 13033