# Tytal — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 13-0133
- **title:** Tytal — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2013-10-22
- **effective on:** Not available
- **summary:** 13-0133 response to Tytal concerning 178.345.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-13-0133.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-13-0133.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-13-0133
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2013/130133.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
OCT 2 2 2013
Ing. Fernando Garza
Direccion Tecnica
Tytal
Cadereyta Jimenez, N.L.
Mexico
Ref. No. 13-0133
Dear Mr. Garza:
This is in response to your letter requesting clarification of the Hazardous Materials
Regulations (HMR; 49 CFR 171-180) applicable to DOT 407 cargo tank design criteria.
Specifically, you ask whether your ring stiffener design meets the circumferential
reinforcement regulations prescribed in 49 CFR 178.345-7( d). The pictures you provide of
your design show a 1.5 inch gap in the ring stiffeners at the six o'clock position that will be
used for drainage.
The answer to your question is no. As provided by the introductory text in§ 178.345-7(d),
when a ring stiffener is also used as a circumferential reinforcement member, whether internal
or external, reinforcement must be continuous around the circumference of the cargo tank
shell.
I trust this information is helpful. Please contact us if you require further assistance.
Sincerely,
T. Glenn Foster
Chief Regulatory Review and Reinvention Branch
Standards and Rulemaking Division

<<<PAGE 2>>>

Drakeford, Carolyn (PHMSA)
From:
Sent:
To:
Subject:
Attachments: Supko, Ben (PHMSA)
13-0133
Monday, June 24, 2013 7:01AM
Drakeford, Carolyn (PHMSA)
FW: Ring Stiffener confirmation
ensamblaje para omega S.easm; TYTAL Ring stiffeners presentation for DOT# 2.pptx
Carolyn,
Please log as an interp.
Thank you,
Ben
From: Staniszewski, Stanley (PHMSA)
Sent: Friday, June 21, 2013 1:10PM
To: Supko, Ben (PHMSA)
Cc: Bomgardner, Paul (FMCSA); Hardridge, John (FMCSA); Rach, Suzanne (FMCSA); Leblanc, Carole (PHMSA); Majors,
Leonard (PHMSA); Toughiry, Mark (PHMSA)
Subject: FW: Ring Stiffener confirmation
Ben:
Can you start the formal lnterp Process on this/Thanks
Paul/John/Suzanne- can you do a little digging to see if there are any pending enforcement issues here ?
Miguel stated that he isn't aware of any and that the company most likely has only been issued warnings of possible non-
compliance ..
We may want to meet on this sooner than later.
Another candidate issue for the CT TAG.
Thanks folks.
Stan
PHMSA
Engineering, PHH-22
202-366-0453
From: Martinez, Miguel (FMCSA)
Sent: Friday, June 21, 2013 12:43 PM
To: Staniszewski, Stanley (PHMSA)
Subject: FW: Ring Stiffener confirmation
Border Inspector Supervisor
1

<<<PAGE 3>>>

(956) 466-1835
From: Ing. Fernando Garza [mailto:fernando.garza@tytal.com.mxl
Sent: Thursday, June 20, 2013 6:37 PM
To: Prado, Arturo (FMCSA); luis.arrasco@tytal.com.mx; Martinez, Miguel (FMCSA); Altamirano, Jimmy (FMCSA); Rach,
Suzanne (FMCSA); Williams, Tod (FMCSA)
Cc: paris delangel@yahoo.com.mx; pablosea@hotmail.com; cothernstankerinspec@yahoo.com; llealtx@yahoo.com;
luislauro@lmtransportaciones.com; rag@gruporalanis.com; 'Sergio martinez'; 'Enrique Proa'; Gerino Ramirez
Subject: RE: Ring Stiffener confirmation
Gentleman's:
First of all allow me an apologize for delayed answer, but I've been out of my office most of the time.
In order to give you an explanation again over our point of view in the paragraph 178.345-7d where he mention on it "
when a ring stiffener are used as a circumferential reinforcement member, whether internal or external, reinforcement
must be continuous around the circumference of the cargo tank shell and must be in accordance with the following:"
As we can see our ring stiffener is completely around to the shell and welded on it.
If you can see in the presentation the drawing 3D & pictures that I sent before, and now I am including another pictures as
well as another view of the section of ring stiffener where we can appreciate that the ring, the support (horn) and the
transversal reinforcement all together made a complete ring stiffener and welded to the shell (see ASME code section UG-
29 and 30 for a vacuums service). Additional! am sending a presentation in eDrawing (you can toad from internet the
software to see this presentation) where you can move and see with more clarity all the parts with their welds. Since the
rule does not specify what should be in one piece, just "must be continuous around the circumference" we believe that
we meet with all requirements of the rules.
In the other hand you mentioned that we must request "if a formal interpretation is required" please let me know to
whom I should ask for it or call by phone.
and Mr. Prado please could you pass a copy of this email to Mr.Staniszewski I will appreciate a lot.
Truly yours.
De: arturo.prado@dot.gov [mailto:arturo.prado@dot.gov]
Enviado el: miercoles, 19 de junio de 2013 10:39 a.m.
Para: luis.arrasco@tytal.com.mx; fernando.garza@tytal.com.mx; miguel.martinez@dot.gov; jimmy.altamirano@dot.gov;
Suzanne.Rach@dot.gov; tod.williams@dot.gov
CC: paris delangel@yahoo.com.mx; pablosea@hotmail.com; cothernstankerinspec@yahoo.com; llealtx@yahoo.com;
luislauro@lmtransportaciones.com; rag@gruporalanis.com
Asunto: Ring Stiffener confirmation
Caballeros,
Aclaraci6n del lngeniero de PHMSA Staniszewski, Stanley, en referencia de los anillos de refuerzos y
piden que si el fabricante necesita una interpretacion de Ia anomalia existente.
Si estan usando el los anillos de refuerzo como un elemento de refuerzo circunferencial (178.345 (7)
(d) los efectos estructurales del tanque que tiene que cumplir Ia parte general del parrafo, que dice
que los anillos deben ser continuos. Si el anillo tiene una brecha o una abertura de 1.5 pulgadas
entonces el refuerzo no cumple con los criterios iniciales.
2

<<<PAGE 4>>>

From: Rach, Suzanne (FMCSA)
Sent: Tuesday, June 18, 2013 1:43 PM
To: Staniszewski, Stanley (PHMSA); Supko, Ben (PHMSA)
Cc: Bomgardner, Paul (FMCSA); Majors, Leonard (PHMSA); Williams, Tod (FMCSA); Roberts, Michael (PHMSA); Williams,
Tod (FMCSA); Prado, Arturo (FMCSA); Martinez, Miguel (FMCSA); Altamirano, Jimmy (FMCSA)
Subject: RE: Ring Stiffener confirmation
Thanks, I will forward that to the field and let them inform the manufacturer. I'll let everyone know if a formal interp is
required. Again, thanks everyone.
From: Staniszewski, Stanley (PHMSA)
Sent: Tuesday, June 18, 2013 2:12 PM
To: Rach, Suzanne (FMCSA); Supko, Ben (PHMSA)
Cc: Bomgardner, Paul (FMCSA); Majors, Leonard (PHMSA)
Subject: RE: Ring Stiffener confirmation
That's the way I read what the regs say.
From: Rach, Suzanne (FMCSA)
Sent: Tuesday, June 18, 2013 2:04 PM
To: Staniszewski, Stanley (PHMSA); Supko, Ben (PHMSA)
Cc: Bomgardner, Paul (FMCSA); Majors, Leonard (PHMSA)
Subject: RE: Ring Stiffener confirmation
Then the ring stiffeners used as circumferential reinforcement needs to be continuous, but not continuously welded.
From: Staniszewski, Stanley (PHMSA)
Sent: Tuesday, June 18, 2013 1:59 PM
To: Supko, Ben (PHMSA); Rach, Suzanne (FMCSA)
Cc: Bomgardner, Paul (FMCSA); Staniszewski, Stanley (PHMSA); Majors, Leonard (PHMSA)
Subject: RE: Ring Stiffener confirmation
Importance: High
Sorry for the delayed response but a lot of other issues are taking precedence.
I'm not sure I've got the whole picture here on what is being asked
Bens response appears OK for addressing "venting & drainage" (for the welds & stiffener); however, If you are using the
ring stiffener as a circumferential reinforcement member (178.345-7(d) for structural purposes for the tank you have to
meet the general part of the paragraph, which says it must be continuous. If you have a 1.5 inch gap of the stiffener you
don't meet the initial criteria.
The subparagraphs are saying that the welds don't have to be continuous as long as you meet the criteria so stated for the
welds.
Stan
Stanley (Stan) Staniszewski Jr.
U.S. Department of Transportation
Pipelines and Hazardous Materials Safety Administration
East Bldg, PHH-22 Engineering
1200 New Jersey Ave., SE
Washington, DC 20590
3

<<<PAGE 5>>>

202-366-0453
Have a complaint or question? Check our Web site at: http:ljwww.phmsa.dot.gov/phmsa-
ext/feedback/hazmatComplaintsRegsViolationsForm.jsp or call the Hazardous Materials Information Center at: 1-800-
467-4922
The information contained in this message, and any attachments thereto, is for information purposes only and may contain the personal views and opinions of the
author, which are not necessarily the views and opinions of the U. S. Department of Transportation, Pipelines and Hazardous Materials Safety Administration.
From: Williams, Tod (FMCSA)
Sent: Tuesday, June 11, 2013 2:35 PM
To: Supko, Ben (PHMSA); Rach, Suzanne (FMCSA); Staniszewski, Stanley (PHMSA)
Cc: Bomgardner, Paul (FMCSA)
Subject: RE: Ring Stiffener confirmation
This is great news; I'm sure the manufacturer will be happy.
Thanks everyone!
Tod Williams, HMPS
USDOT/FMCSA
903 San Jacinto Blvd., Suite 101
Austin, TX 78701
(512)653-4357
Fax: (915) 757-6379
From: Supko, Ben (PHMSA)
Sent: Tuesday, June 11, 2013 11:50 AM
To: Rach, Suzanne (FMCSA); Staniszewski, Stanley (PHMSA)
Cc: Bomgardner, Paul (FMCSA); Williams, Tod (FMCSA)
Subject: RE: Ring Stiffener confirmation
Susanne,
I agree with you, the manufacturer appears to be correct. The regulations allow for venting and drainage facilities in the
enclosed air space of a ring stiffener (see 178.347-7(d)(4)). The HMR do not explicitly dictate the location of vented drains
in a ring stiffener.
If the company would like a more letter of clarification (interp) they should send their request to:
Charles Betts
U.S. DOT
Office of Hazardous Materials Safety
1200 New Jersey Ave, SE
East Building, 2nd Floor
Washington, DC 20590
Ben
4

<<<PAGE 6>>>

From: Rach, Suzanne (FMCSA)
Sent: Monday, June 10, 2013 8:59 AM
To: Supko, Ben (PHMSA); Staniszewski, Stanley (PHMSA)
Cc: Bomgardner, Paul (FMCSA)
Subject: Ring Stiffener confirmation
Hi, quick question, I believe the manufacturer is correct on this one (email from the field agent, Arturo Prado, at the
bottom and DCE, Fernando Garza, response follows): CT12407, manufacture DOT 407 cargo tanks with ring stiffeners
that are not continuously around the circumference (178.345-7)(d). The ring stiffeners have a 1.5 space between both
ends at the six o'clock position. Company is seeking special permit/wavier process for existing cargo tanks that are already
being utilize by carriers and or until manufacture gets an official interpretation whether existing cargo tanks built are
acceptable as is.
But, according to 178.34S-7(d)(2), its ok:
178.345-7 (d)(2) If a ring stiffener is welded to the cargo tank shell, a portion of the shell may be considered as part of the
ring section for purposes of computing the ring section modulus. This portion of the shell may be used provided at least
SO percent of the total circumference of the cargo tank is welded and the length of any unwelded space on the joint does
not exceed 40 times the shell thickness.
The field agent is looking for guidance, can you confirm the manufacturer is correct manufacturing DOT 407 cargo tanks
with ring stiffeners needn't be continuous as long as they are at least SO percent of the total circumference and welded to
the tank wall or set me straight that they need to be?
Thank you.
from: Williams, Tod (FMCSA)
Sent: Friday, June 07, 2013 4:56PM
To: Rach, Suzanne (FMCSA)
Subject: FW: Ring Stiffeners
Hi Suzanne:
understand.
This language is a little too engineer-ese for an old country boy to
Can you help me?
For some background, one of our Inspectors told this CT mfr. that these tanks were
not compliant with the regs cited, but then the CT rep (probably their DCE)
claimed that paragraph (d) (2) of 178.345-7 says his tanks are ok. Is he
correct? Did our Inspector not read far enough?
Thanks Suzanne!
Tod Williams, HMPS
USDOT/FMCSA
903 San Jacinto Blvd., Suite 101
Austin, TX 78701
(512)653-4357
Fax: (915) 757-6379
From: Ing. Fernando Garza [mailto:fernando.garza@tytal.com.mx]
Sent: Thursday, June 06, 2013 5:20 PM
To: Roberts, Michael (PHMSA); Williams, Tod (FMCSA); Prado, Arturo (FMCSA); Martinez, Miguel (FMCSA); Altamirano,
Jimmy (FMCSA)
5

<<<PAGE 7>>>

Cc: luis.arrasco@tytal.com.mx; cothernstankerinspec@yahoo.com; 'Sergio martinez'
Subject: RE: Ring Stiffeners
Dear Messrs.':
part
may
the
gap
proceed to submit
First of all, thank you for your prompt response.
Our visit to DOT office in Brownsville was to see if Mr. Prado or somebody else
can clarify us our interpretation of this particular section on the 49 CFR 178.345-7
because as he says; over there mention that " Must be continuous around the circumference"
but also says " it Must be in accordance with the following: "
and if we understand in the paragraph (2) where mentioning
" If a ring stiffener is welded to the cargo tank shell, a portion of the shell may be considered as
of the ring section for purposes of computing the ring section modulus. This portion of the shell
be used provided at least SO percent of the total circumference of the cargo tank is welded and
length of any un welded space on the joint does not exceed 40 times the shell thickness."
According with this, and looking to full fill all structural considerations and operation, we let a little
for drainage since no specifies any special shape, however we still considered that meet with the
requirements
After all this comments if you considered that we must to look for another opinion from PHMSA or
the request of the Permit/wavier please let me know.
Regards.
De: michael.l. roberts@dot.gov [mailto: michael.l.roberts@dot.gov]
Enviado el: miercoles, OS de junio de 2013 04:19 p.m.
Para: tod.williams@dot.gov; arturo.prado@dot.gov; miguel.martinez@dot.gov; iimmy.altamirano@dot.gov
CC: luis.arrasco@tytal.com.mx; fernando.garza@tytal.com.mx; cothernstankerinspec@yahoo.com
Asunto: Re: Ring Stiffeners
He needs to apply for a party status to the SP already in effect
From: Williams, Tod (FMCSA)
Sent: Wednesday, June 05, 2013 05:17PM Eastern Standard Time
To: Prado, Arturo (FMCSA); Martinez, Miguel (FMCSA); Altamirano, Jimmy (FMCSA); Roberts, Michael (PHMSA)
Cc: luis.arrasco@tytal.com.mx <luis.arrasco@tytal.com.mx>; fernando.garza@tytal.com.mx
<fernando.garza@tytal.com.mx>; cothernstankerinspec@yahoo.com <cothernstankerinspec@yahoo.com>
Subject: RE: Ring Stiffeners
The process for applying to PHMSA for a Special Permit is set forth in 49 CFR
107.101-127. Instructions on obtaining guidance and interpretations from PHMSA is
set forth in 49 CFR 105.20
6

<<<PAGE 8>>>

Tod Williams, HMPS
USDOT/FMCSA
903 San Jacinto Blvd., Suite 101
Austin, TX 78701
(512)653-4357
Fax: (915) 757-6379
From: Prado, Arturo (FMCSA)
Sent: Wednesday, June OS, 2013 2:16PM
To: Williams, Tod (FMCSA); Martinez, Miguel (FMCSA); Altamirano, Jimmy (FMCSA); Roberts, Michael (PHMSA)
Cc: luis.arrasco@tytal.com.mx; fernando.garza@tytal.com.mx; cothernstankerinspec@yahoo.com
Subject: Ring Stiffeners
Tod,
Cargo tank manufacture Tytal reference CT12407, manufactured DOT 407 cargo
tanks with ring stiffeners that are not continuously around the
circumference (178.345-7) (d). The ring stiffeners have a 1.5 space between
both ends at the six o'clock position. Company is seeking special
permit/wavier process for existing cargo tanks that are already being
utilize by carriers and or until manufacture gets an official
interpretation whether existing cargo tanks builted are acceptable as is. I
need your assistance in finding a POC to place this manufacture in contact
with. I have attached PHMSA website for carrier to submit their anomaly,
except I am not sure if this the correct step or site.
§178.345-7 Circumferential reinforcements.
(d) When a ring stiffener is used as a circumferential reinforcement
member, whether internal or external, reinforcement must be continuous
around the circumference of the cargo tank shell and must be in accordance
with the following:
Arturo A. Prado
Motor Carrier Safety Specialist
RGV Operations Center, Texas Division
(956) 504-2652 ext 231