# Mallinckrodt Pharmaceuticals, formally Ikaria, Inc. — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 15-0102
- **title:** Mallinckrodt Pharmaceuticals, formally Ikaria, Inc. — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2015-12-08
- **effective on:** Not available
- **summary:** 15-0102 response to Mallinckrodt Pharmaceuticals, formally Ikaria, Inc. concerning 173.301, 173.302.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-15-0102.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-15-0102.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-15-0102
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2015/150102.pdf
**body:**

<<<PAGE 1>>>

of Transportation
U.S. Department
1200 New Jersey Avenue, SE
Washington, D.C. 20590
Materials Safety
Pipeline and Hazardous
Administration
DEC 0 8 2015
Mr. Juan Miró
Project Manager, Engineering Department
Mallinckrodt Pharmaceuticals, formally Ikaria, Inc.
1060 Allendale Dr.
Port Allen, LA 70767
Reference No. 15-0102
Dear Mr. Miró:
This is response to your May 22, 2015 e-mail requesting clarification of the Hazardous
Materials Regulations (HMR; 49 CFR Parts 171-180) applicable to filling Department of
Transportation (DOT) specification cylinders. In your e-mail, you ask whether it is
permissible to overfill a cylinder by 350 psia during the filling process to compensate for
losing 350 psia when detaching the cylinder from the gas transfer system. The final pressure
after the cylinder is ejected from the filling nozzle is below the marked service pressure.
The filling of the cylinder must comply with the applicable requirements in Part 173 Subpart
G of the HMR. This subpart does not address the variation in pressure during the filling
process. Section 173.301a(c) states that when offered for transportation, the pressure in a
cylinder at 21 °C (70 °F) must not exceed the service pressure for which the cylinder is
marked or designated, except as provided in § 173.302a(b) of the HMR. Except as otherwise
provided in § 173.30la(d), the pressure in a cylinder may not exceed 5/4 times the service
pressure at 55 °C (131 °F) when the cylinder is offered for transportation. Therefore, your
operating procedures must ensure that these requirements are met when the cylinder is offered
for transportation.
I hope this satisfies your request.
Sincerely,
T. Glenn Foster
Chief, Regulatory Review and Reinvention Branch
Standards and Rulemaking Division

<<<PAGE 2>>>

dekman
$173.304
Cylinders
Dodd, Alice (PHMSA)
15-0102
From:
Geller, Shelby CTR (PHMSA).
Sent:
Friday, May 22, 2015 11:52 AM
To:
Hazmat Interps
Subject:
FW: Interpretation Solicitation - Gas Transfill Process of DOT 3AL 3000 cylinder
Dear Shante and Alice,
Attached is a request for a formal letter of interpretation. I spoke with Mr. Miro about his request.
Thanks,
Shelby
From: Juan Miro [mailto:Juan.Miro@ikaria.com]
To: PHMSA HM InfoCenter
Sent: Friday, May 22, 2015 11:47 AM
Subject: RE: Interpretation Solicitation - Gas Transfill Process of DOT 3AL 3000 cylinder
Greetings,
To clarify my questions:
1. Does the DOT regulation allows overfilling of a cylinder @ 70F during the filling process to compensate for
pressure loss during detachment of the cylinder from the filling manifold?
a. Filling Setpoint 3350 psia @ 70F.
b. Final Pressure of the cylinder after detachment from the filling manifold - 3000 psia @ 70F or below.
c. Cylinder type DOT 3AL 3000.
Hope this clarifies my request.
Thanks
Regards,
Juan Miró | Project Manager | Engineering Department
Mallinckrodt Pharmaceuticals, formerly Ikaria, Inc.
1060 Allendale Dr Port Allen, LA 70767
T 225-376-4373 | M 225-335-0817 | F 225-376-4493
http://www2.mallinckrodt.com/ikaria/
From: Juan Miro
Sent: Thursday, May 21, 2015 6:32 PM
To: 'phmsa.hm-infocenter@dot.gov'
Subject: RE: Interpretation Solicitation - Gas Transfill Process of DOT 3AL 3000 cylinder
Greetings,
1

<<<PAGE 3>>>

Following up on the request below. Can you please inform what are the next steps discuss and obtain the
interpretation?
Thank You
Regards,
Juan Miró | Project Manager | Engineering Department
Mallinckrodt Pharmaceuticals, formerly Ikaria, Inc.
1060 Allendale Dr Port Allen, LA 70767
T 225-376-4373 | M 225-335-0817 | F 225-376-4493
http://www2.mallinckrodt.com/ikaria/
From: Juan Miro
Sent: Wednesday, May 06, 2015 2:48 PM
To: 'phmsa.hm-infocenter@dot.gov'
Subject: Interpretation Solicitation - Gas Transfill Process of DOT 3AL 3000 cylinder
Greetings,
My name is Juan Miró and I am the lead engineer of a medical gas manufacturing facility. I am soliciting an
interpretation of DOT regulation regarding the process I am about to describe:
1. Container Closure:
a. DOT 3AL 3000 cylinder with water volume of 0.074L
b. Aluminum Schrader type spring loaded valve.
2. Gas
a.
1.14% (11400 ppm) Nitric Oxide balance Nitrogen
3. Process Steps:
a. Attach the container to gas transfer system
b.
Evacuate the container to 30mTorr
c. Pressurize the container to 3350 psia @ 70F (cylinder spends less than 1 minute pressurized to this
setpoint before losing pressure during the detachment process).
d. Detach the container from gas transfer system (pressure loss of 350 psia)
e. Final container pressure before 3000 psia @ 70F
The process described pressurizes the cylinder to 3350 psia @ 70F (3750 psia @ 70F is 5/4 of service pressure). Upon
reaching 3350 psia the cylinder is ejected from the filling nozzle losing 350 psia in the ejection process. The final
pressure of the cylinder is at 3000 psia or below. After these cylinder are filled the contents are analyzed providing a
final pressure before transport of 2750 psia.
Does the process as described complies with DOT regulation? I have assessed the regulation and there is mention of
heated compression but nothing is mentioned about compensating for sudden pressure loss at the end of the filling
process.
Regards,
Juan Miró | Project Manager | Engineering Department
Mallinckrodt Pharmaceuticals, formerly Ikaria, Inc.
1060 Allendale Dr Port Allen, LA 70767
2

<<<PAGE 4>>>

T 225-376-4373 | M 225-335-0817 | F 225-376-4493
http://www2.mallinckrodt.com/ikaria/
please inform the sender and remove any racord of this message.
This information may be confidential and/or privileged. Use of this information by anyone other than the intended recipient is prohibited. if you receive this in emer,
- **truncated:** false
- **body characters:** 5685
