# LOGSA Packaging , Storage and Containerization Center — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 16-0017
- **title:** LOGSA Packaging , Storage and Containerization Center — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2016-06-02
- **effective on:** Not available
- **summary:** 16-0017 response to LOGSA Packaging , Storage and Containerization Center concerning 178.815, 178.819.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-16-0017.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-16-0017.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-16-0017
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/2016/160017.pdf
**body:**

<<<PAGE 1>>>

of Transportation
U.S. Department
1200 New Jersey Avenue, SE
Washington, D.C. 20590
Materials Safety
Pipeline and Hazardous
Administration
JUN 0 2 2016
Andrew Gesford
Chief
LOGSA Packaging, Storage and Containerization Center
11 Hap Arnold Boulevard
Tobyhanna, PA 18466
Reference No. 16-0017
Dear Mr. Gesford:
This letter is in response to your January 13, 2016, letter requesting clarification of the
Hazardous Materials Regulations (HMR; 49 CFR Parts 171-180) applicable to test
requirements for Intermediate Bulk Containers (IBC). Specifically, you ask for further
clarification of the term "rupture" as used in § 178.819(c) as criteria for an IBC to pass the
vibration test. You describe two scenarios and provide accompanying photographs of
fiberboard IBCs with damage resulting from the vibration test. The IBC in "Figure 1" shows
the inner bag protruding from damage that extends along the full height of the fiberboard
outer container. The IBC in "Figure 2" shows a tear—-described as approximately 3 inches in
height—to the fiberboard in the bottom corner, and while the damage penetrates the outer
fiberboard wall, the inner bag is not visible. You further describe that leakage was not
observed in either scenario. We have paraphrased and answered your questions as follows:
Q1.
Does a rupture to a fiberboard IBC include any damage that results in separation or
tearing of the outer fiberboard container which creates an opening?
Al.
The answer is yes. Section 178.819(c) states that an IBC passes the vibration test if
there is no rupture or leakage. The word "rupture" is defined by Webster's dictionary
as a "state of being broken, the act of bursting." It is the opinion of this Office that
any damage that creates an opening in an IBC would be considered a rupture and
result in the failure of the vibration test. The entire side of the IBC in "Figure 1" has
burst open, and although the damage to the IBC in "Figure 2" is less severe, the
damage has still penetrated the outer fiberboard container, creating an opening.
Therefore, the IBCs in both scenarios have failed the vibration test due to rupture.
Q2.
Does a rupture to a fiberboard IBC include instances where the inner bag is exposed or
protrudes from the box due to damage to the outer fiberboard container, but the inner
bag remains intact and does not leak?

<<<PAGE 2>>>

A2. The answer is yes. See Al.
Q3.
Does a rupture to an IBC include instances of breakage. of the IBC closure
components, such as tape?
A3.
Generally, the answer is yes. Typically, breakage of an IBC closure component is
expected to result in failure of the vibration test due to leakage or due to a full or
partial opening of the package (1.e. rupture). However, if the IBC remains fully closed
and does not leak, then the breakage of an IBC closure component does not result in a
failure of the vibration test.
Q4.
Can an IBC fail the vibration test based on evaluation for criteria contained in other
IBC test requirements, such as "deformation" or "unsafe for transportation," without
the presence of the actual wording in the vibration test criteria in § 178.819? For
example, the criteria for a fiberboard IBC to pass the stack test in § 178.815(e)(2),
requires "no loss of contents and no permanent deformation, which renders the whole
IBC, including the base pallet, unsafe for transportation."
A4.
The answer is no. The vibration test is a pass or fail test determined only by whether
the IBC withstands testing without leakage or rupture. The criteria for passing the
vibration test in § 178.819(c) was incorporated into the HMR by a final rule entitled,
"Intermediate Bulk Containers for Hazardous Materials (HM-181E)," published July
26, 1994. This requirement is generally harmonized with the United Nations Manual
of Tests and Criteria, which specifies in 6.5.6.13.4, "No leakage or rupture shall be
observed. In addition, no breakage or failure of structural components, such as broken
welds or failed fastenings, shall be observed." It should be noted that the safety of a
packaging for transportation depends on the cumulative effects of all packaging
design, testing, and use requirements in the HMR. In addition to the vibration test, the
IBC must meet all applicable design requirements in Part 178 Subpart N and all
applicable test requirements in Part 178 Subpart O to be certified for transportation.
I hope this information is helpful. Please contact us if we can be of further assistance.
Sincerely,
lenn Foste
T. Glenn Foster
Chief, Regulatory Review and Reinvention Branch
Standards and Rulemaking Division

<<<PAGE 3>>>

Lehman
$178.819 (c
DEPARTMENT OF THE ARMY
Packageny Specs.
PACKAGING, STORAGE, AND CONTAINERIZATION CENTER
USAMC LOGISTICS SUPPORT ACTIVITY
TOBYHANNA, PA 18466-5097
11 HAP ARNOLD BOULEVARD
ATTENTION OF
REPLY TO
January 13, 2016
Logistics Testing and Applications Division
Mr. Charles E. Betts
Director, Office of Hazardous Materials Standards
U.S. DOT/PHMSA (PHH-10)
1200 New Jersey Avenue
SE East Building, 2nd Floor
Washington, DC 20590
Dear Mr. Betts:
This letter of inquiry for interpretation is written on behalf of the US Army Materiel Command
(USAMC) Logistics Support Activity Packaging, Storage, and Containerization Center (LOGSA
PSCC), Tobyhanna, PA. It is being written for clarification/interpretation of the Title 49 Code of
Federal Regulations (CFR), Part 178, Subpart O - Testing of intermediate bulk containers (IBCs),
pertaining to the criteria for passing the vibration test, when testing a IBC.
Title 49 CFR §178.819(c) describes the criteria for passing the IBC vibration test as "An IBC
passes the vibration test if there is no rupture or leakage." Without a definitive explanation for
determining a rupture, it is LOGSA PSCC's opinion that a fiberboard IBC may be determined to
be a failure based on damage that might be considered typical degradation of the packaging as it
moves through the transportation cycle. Please review the following photographs for further
discussion.
Figure 1. Test damage - full height of IBC
Figure 2. Test damage - approximately 3" high

<<<PAGE 4>>>

Figure 1 shows significant damage of the fiberboard that runs the entire height of the IBC. The
inner bag is exposed and is observed protruding from the box; no leakage is observed. Figure 2
shows less severe damage of the IBC. The damage is all the way through the fiberboard wall.
The inner bag is not visible and no leakage is observed. The damage noted in Figure 2 is
approximately 3" in height, and is similar to damage that we've seen in previous fiberboard IBC
vibration tests.
Discussion. Both photographs show damage of some extent. Figure 1 shows significant
damage and appears to no longer be safe for transportation. Figure 2 shows minor damage after
the test. LOGSA PSCC's opinion is that at this point the IBC (Figure 2) could still be considered
reasonably safe for transportation. However, based on current wording specified in 178.819 (c),
Criteria for passing the test, we feel that both of these pictures show the same type of damage of
the packagings (albeit to different extents) and, therefore, could potentially be considered failures
to pass the vibration test. Without clarification of a rupture, damage that might be considered
expected or normal degradation and, therefore, still reasonably safe for transportation (Figure 2.),
would have to be declared a failure. In addition, there is no mention of evaluating a packaging for
permanent deformation or transportation safety as described in other IBC tests (i.e., drop, stack,
top lift, and bottom lift).
It is LOGSA PSCC's opinion that if the regulations contained a definition of a rupture, and
included wording that allowed for evaluating an IBC with regards to safety, permanent deformation,
vibration test.
packaging strength, etc., that fiberboard IBCs could be better evaluated for compliance with the
Questions:
1. With regards to a fiberboard IBC, what determines, or defines, a rupture?
a. Any damage that results in separation, or tearing, of the fiberboard container which
creates an opening? If not, how do we differentiate between typical damage and
damage that results in a failure of the test?
b. If the inner bag is exposed due to damage to the fiberboard container, but the inner
bag remains intact and does not leak, is that a failure?
c. If the damage is such that the inner bag protrudes from the box, but does not leak,
is that a failure?
d. Is breakage of the closure components, such as tape, considered a rupture?
2. Can the IBC be evaluated for safety, permanent deformation, and/or packaging strength
without the presence of the actual wording in the vibration test criteria?
Point of contact for this matter is Mr. Andrew Gesford, DSN 795-5967, (570) 615-5967,
fax (570) 615-7823, or e-mail andrew.gesford.civ@mail.mil. Mailing address is: Chief, LOGSA
Packaging, Storage, and Containerization Center (AMXLS-PT/Andrew Gesford), 11 Hap Arnold
Boulevard, Tobyhanna, PA 18466-5097.
Sincerely,
Chief, Logistics Testing and
Applications Division