# Stabilis Solutions — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 20-0094
- **title:** Stabilis Solutions — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2021-05-28
- **effective on:** Not available
- **summary:** 20-0094 response to Stabilis Solutions concerning 180.407.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-20-0094.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-20-0094.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-20-0094
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/hazmat/interpretations/75081/200094.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
May 28, 2021
Mr. Vignesh Pandurengan
Maintenance Specialist
Stabilis Solutions
10375 Richmond Avenue, Suite 700
Houston, TX 77042
Reference No. 20-0094
Dear Mr. Pandurengan:
This is in response to your December 7, 2020, email and subsequent conversations with a
member of my staff requesting clarification of the Hazardous Materials Regulations (HMR; 49
CFR Parts 171-180) applicable to Department of Transportation (DOT) cargo tanks.
Specifically, you ask whether an insulated MC 338 cargo tank transporting non-corrosive
materials and equipped with manholes must undergo an internal visual inspection within certain
time intervals.
Section 180.407(c) excepts DOT Specification MC 338 cargo tanks from the internal visual
inspection requirement when transporting non-corrosive materials. However, MC 338 cargo
tanks are required to be externally inspected annually. If the insulation of the MC 338 cargo tank
you describe is found to preclude a complete external inspection, an internal inspection of the
cargo tank would be required in order to meet the external inspection requirements specified in
§§ 180.407(c) and 180.407(d). In addition, because the cargo tank you describe is equipped
with manholes, Note 4 of § 180.407(c) would apply, and you may perform either an internal
visual inspection in conjunction with the external visual inspection or a hydrostatic or pneumatic
pressure-test of the cargo tank.
I hope this information is helpful. Please contact us if we can be of further assistance.
Sincerely,
T. Glenn Foster
Chief, Regulatory Review and Reinvention Branch
Standards and Rulemaking Division

<<<PAGE 2>>>

Edmonson
20-0094
From: INFOCNTR (PHMSA)
To: Subject: Date: Dodd, Alice (PHMSA); Hazmat Interps
FW: Request for Letter of Interpretation
Monday, December 7, 2020 11:58:24 AM
Dear Alice,
Please see the request for a letter of interpretation below. Please contact our office with any
questions.
Thank you,
Sarah (HMIC)
From: Vignesh Pandurengan [mailto:vpandurengan@stabilis-solutions.com]
Sent: Monday, December 7, 2020 8:37 AM
To: INFOCNTR (PHMSA) <INFOCNTR.INFOCNTR@dot.gov>
Cc: Miroslaw Skrzypkowski <Mskrzypkowski@stabilis-solutions.com>; Travis Vandervort
<tvandervort@stabilis-solutions.com>; Koby Knight <koby.knight@stabilisenergy.com>; Jessica
Lopez <jessica.lopez@stabilis-solutions.com>; Crystal Alcalar <crystal.alcalar@stabilis-
solutions.com>
Subject: Request for Letter of Interpretation
CAUTION: This email originated from outside of the Department of Transportation (DOT). Do not click on links or
open attachments unless you recognize the sender and know the content is safe.
To Whom It May Concern,
I am writing to request a letter of interpretation of the regulation that defines internal visual
inspection requirements of MC338s tanks that have manholes/manways. I spoke with a regulatory
specialist, Breanna, who was very thorough and escalated the question of whether or not MC338s
tanks that have manholes/manways are required to have internal visual inspections at ANY interval
of time to other specialists and to personnel at the PHMSA Standards department. She got back to
me and reported that MC338 units with manholes/manways are NOT required by the CFR to have
internal inspections but we may do so at our own discretion.
The portions of the regulation that define the inspection requirements are 49 CFR 180.407 in
the sections shown below:

<<<PAGE 3>>>

Please provide a formal interpretation letter for our confirmation and review at your earliest
convenience, the physical mailing address to which the letter can be sent is in my signature below.
Regards,
Vignesh Pandurengan

<<<PAGE 4>>>

Maintenance Specialist
Stabilis Solutions
10375 Richmond Avenue, Suite 700
Houston, Texas 77042
Corporate Office Main: 832.456.6500
Toll Free: 1.866.LNG.FUEL
Direct: 832.456.6506
Mobile: 281.203.4552
https://www.stabilisenergy.com
This message (including any attachments) contains confidential information intended for a specific individual and purpose, and is protected by law. If
you are not the intended recipient, you should delete this message and any disclosure, copying, or distribution of this message, or the taking of any
action based on it by you is strictly prohibited.
- **truncated:** false
- **body characters:** 4384
