{"operation":"document","citation":"98-0564","title":"Manchester Tank — Hazardous Materials Safety Interpretation","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"1997-12-31","effective_on":null,"summary":"98-0564 response to Manchester Tank concerning 178.35.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-interpretation-98-0564.json","markdown":"https://regulus.evalyn.ai/document/phmsa-interpretation-98-0564.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-interpretation-98-0564","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/1998/980564.pdf","body":"<<<PAGE 1>>>\n\n•\nof Transportation\nU.S. Department\nWashington, D.C.\n400 Seventh Street, S.W.\n20590\nResearch and\nSpecial Programs\nAdministration\nDEC 3 | 1997\nMr. Randy Wahl\nDirector of Technical Development\nManchester Tank\n1749 Mallory Lane #400\nBrentwood, TN 37027\nDear Mr. Wahl:\nThis is in response to your letter requesting clarification of inspection report requirements in\n49 CFR 178.35. Specifically, you ask whether your current Inspector's Report is acceptable after\nOctober 1, 1997, since the report currently contains at least the minimum information required in._\nthe Compresses Gas Association (CGA) Pamphlet C-11.\nThe answer is yes. Section 178.35(g) specifies that each report must contain, at a minimum, the\napplicable information listed in CGA Pamphlet C-11.\nI hope this information is helpful. Should you have further questions, do not hesitate to contact\nus.\nSincerely,\nHate 2 mitchell\nHattie L. Mitchell, Chief\nExemption and Regulations Termination\nOffice of Hazardous Materials Standards\n..-\n\n<<<PAGE 2>>>\n\nBette\nFile: 178.35\nSC: 33%,\nAugust 18, 1997\nMr. Edward T. Mazullo\nDirector of Office of Hazardous Materials Standards\nU.S. Department of Transportation\n4007* Street S.W.\nWashington, D.C. 20590\nDear Mr. Mazullo:\nManchester Tank & Equipment Company would like to request a clarification for\n49CFR - Section 178.35 (g).\nIt is our interpretation that our current Inspector's Report format will be acceptable\natter Uctober 1, 1997, since the report currently contains at least the minimum\ninformation required in CGA Pamphlet C-11. Manchester has put forth considerable\ncost and effort towards having custom software written to the current report format\nand would like to avoid having the programs being re-written if at all possible.\nManchester Tank would greatly appreciate a written confirmation of our\ninterpretation for our files.\nThank you.\nSincerely,\nRandy Wall fee\nRandy Wahl\nDirector of Technical Development\nRW:ms\nCC:\nJerry Stockinger\nTom Freeland\nMANCHESTER\n1749 Mallory Lane, #400, Brentwood, TN 37027 • (615) 370-3833 • Fax (615) 370-6150\n\n<<<PAGE 3>>>\n\nMANCHESTER\n(..\n1749 Mallory Lane, #400, Brentwood, TN 37027\n8 M\nDHM-1O\nMr. Edward T. Mazulio\nDirector of Office of Hazardous Materials\nStandards\nU.S. Department of Transportation\n400 7th Street S.W.\nWashington, D.C. 20590","truncated":false,"body_characters":2308}