# Package Research Laboratories — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** 99-0005
- **title:** Package Research Laboratories — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1999-03-22
- **effective on:** Not available
- **summary:** 99-0005 response to Package Research Laboratories concerning 178.601.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-99-0005.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-99-0005.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-99-0005
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/1999/990005.pdf
**body:**

<<<PAGE 1>>>

• a
of Transportation
U.S. Department
MAR 2Z 1999
passengion. D.C. 2590
Research and
Washington, D.C.
Special Programs
Administration
Ms. Sue E. Pelletier-Bruno
41 Pine Street
Package Research Laboratories
Ref. No: 99-0005
Rockaway, NJ 07866
Dear Ms. Pelletier-Bruno:
This responds to your letter of February 17, 1999, and your
conversation with Ms. Diane LaValle of this office concerning
requirements for țesting specification packagings under the
Hazardous Materials Regulations (HMR; 49 CER Parts 171-180).
Specifically, you ask for confirmation that testing is not
considered complete until a test report has been prepared,
dated, and signed.
Your understanding, is correct.
, completed for each packaging design qualification test and
A test report must be .
forth
each periodic retest.
Section 178.601 (1) of the HMR sets
the information that must be included in each test
report. The test report may not be signed and dated until all
the required information is compiled and finalized.
Completion of a test report is the final step in the packaging
design qualification testing or periodic retesting process;
thus, no specification packaging may be manufactured for sale
or use until a report documenting successful completion of all
required tests has been completed.
I hope this information is helpful. If you have further
questions, please do not hesitate to contact this office.
Sincerely,
Thomas G. Allan
Senior Transportation Regulations Specialist
Office of Hazardous Materials Standards
178,601

<<<PAGE 2>>>

99-0005
<
85178-601 Gorsky
orig)
PRL
PACKAGE RESEARCH LABORATORY Division of Stapling Machines Co., LLC
4
41 Pine Street, Rockaway, New Jersey 07866
February 17, 1999
Ms. Diane LaValle
400 7th Street South West
US Dept. of Transportation
Room 8102
RSTA-DHM-10
Washington DC, 20590
Dear Diane:
Thank you for taking the time to review our question today. The head of our lab has requested that
we get the answer in writing. I appreciate your time and have repeated the situation below:
We tested combination packages of Corrugated Fibreboard containers and plastic or glass bottles
tests were completed in December, however the suppliers of their plastic and glass were not able to get
under the provisions of Title 49, Code of Federal Regulations, Section 107.404 (49CFR). The physical
the gathering of specifications and approval certificate.
the specifications to us until February. Therefore, the cartons were held up awaiting the completion of
As per our conversation on February 17, 1999 you indicated that the tests were not complete until the
specifications were compiled and we should put that date on the test date area of the report. I want to
clarify that the customer has not been able to manufacture cartons while awaiting the completed reports.
Thank you for your prompt attention and we look forward to receiving your responce.
Sincerely,
Jue E. Bruno
Sue E. Pelletier-Bruno
Package Research Laboratories
(973) 627-4400
FAX (973) 627-5355
:

<<<PAGE 3>>>

SEARCH
Y
PRL
PACKAGE RESEARCH LABORATORY Dvision of Stapling Machinee Co., LLC
41 Pine Street, Rockaway, New Jersey 07866
Gorsky
February 17, 1888
8178.601
US Dept. of Transportation
Ms. Diane LaValle
99-0005
400 7th Street South West
Room 8102
RSTA-DHM-10
Washington DC, 20580
Dear Diane:
•
Thank you for taking the time to review our question today. The head of our lab has requested that
we get the answer in writing. I appreciate your time and have repeated the situation below:
We lested combination packages of Corrugated Fibreboard containers and plastic or glass bottles
under the provisions of Title 48, Code of Federal Regulations, Section 107.404 (49CFR). The physical
ests were completed In December, however the suppliers of their plastic and glass were not able to ge
the gathering of specifications and approval certificate.
ne speciations to us until February. Therefore, the cartons were held up awaiting the completion of
specifications were compiled and we should put that date on the test date area of the report. I want to
As per our conversation on February 17, 1989 you indicated that the tests were not complete untll the
clarify that the customer has not been able to manufacture cartons while awaiting the completed reports.
Thank you for your prompt attention and we look forward to receiving your responce.
Sincerely,
Susan-
Nue E. BranD
Per EC 4 the tet
Sue E. Pelletier-Bruno
Package Research Laboratories
_ VEceived
(973) 627-4400
FAX (973) 827-5355
zid
120:1 66 11 831

<<<PAGE 4>>>

%
Date:
Wednesday, February 17, 1999
To:
US Dept of Transportation
Ms. Diane La Valle
Phone: 202-366-6344
Fax:
202-366-3012
From:
Package Research Laboratory
Sue E. Pelletier-Bruno
Phone: 973-627-4400
Fax: 913-627-4400
Pages:
2.
Subject:
This is the letter dealing with the late
specifications..
THANK YOU
)
I'd
14 1090 6 2 832

<<<PAGE 5>>>

.i..
Interpretation Letters
Requester
Sue E. Pelletier-Bruno
Date Received: 1/5/99
Company
Package Research Laboratory
Tracking Number: 99-0005
Phone
973-627-4400
Revision Date: 2/24/99
Date Assigned 2/24/99
Date of Letter 2/17/99
Staff
Gorsky
First Draft Due: 3/17/99
Section
178.601
First Draft Date:
Subject
Packaging Specs
Concurrence
Status
Status Date
Sign Date
Signor
HBP
Copy to Docket D
Copy to DHM-60 D
Comment
:

<<<PAGE 6>>>

iPRE
Division of Stapling Machines Co.
·15
112.63
PACKAGE RESEARCH LABORATORY
TAINE CETHINGE C
41 Pine Street, Rockaway, NJ 07866
US DepT. OK TRANS pOrTATION
400 7th Street South West
RSTA-DAM-10
ROOm 8102
WASHiNGtON, DE 20590