# Lawrence W. Bierlein — Hazardous Materials Safety Interpretation

- **operation:** document
- **citation:** CHI-13-001
- **title:** Lawrence W. Bierlein — Hazardous Materials Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2013-08-16
- **effective on:** Not available
- **summary:** CHI-13-001 concerning 178.813, 180.352.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-chi-13-001.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-chi-13-001.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-chi-13-001
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Hazmat/ChiefCounsel/CHI-13-001.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
1200 New Jersey Avenue, S.E.,
Pipeline and Hazardous
PHC-10, Room E26-33l
Materials Safety Administration
Office of
Washington, D.C. 20590-0001
Chief Counsel
Phone: (202)366-4400
Fax: (202) 366-7041
Email: joe.solomey@dot.gov
Hazardous Materials Safety Law
Division
LETTER OF INTERPRETATION
August 16, 2013
Lawrence W. Bierlein, Esq.
1101 30t Street NW
Suite 500
Washington DC 20007
Reference No.: CHI-13-001
Dear Mr. Bierlein:
On May 16, 2012, PHMSA issued PHMSA Interpretation No. 12-0056 (Interpretation) of the
Hazardous Materials Regulations (HMR; 49 CFR Parts 171-180) related to the repair of
thought it necessary to clarify PHMSA's interpretation of the HMR as it relates to the repair of
IBCs. More specifically, this letter will cover the requirement to test, inspect, and durably mark
damaged IBCs that have been repaired.
As stated in § 180.352(d)(1), damaged IBCs may be repaired and the inner receptacles of
composite packagings may be replaced and returned to service provided: (i) The repaired IBC
conforms to the original design type, is capable of withstanding the applicable design
qualification tests, and is retested and inspected in accordance with the applicable requirements
of this section; (i) an IBC intended to contain liquids or solids that are loaded or discharged
under pressure is subjected to a leakproofness test as specified in § 178.813 of this subchapter
and is marked with the date of the test; and (iii) the IBC is subjected to the internal and external
inspection requirements as specified in § 180.352(b).
In the interpretation 12-0056, PHMSA clarified that the HMR allow a company that repairs IBCs
to rely on the leakproofness test and internal visual inspection of a replacement inner receptacle
conducted by a third party. PHMSA also affirmed that the company relying on the third party

<<<PAGE 2>>>

2
testing and inspection would need evidence to establish that the leakproofness test and internal
visual inspection was performed in accordance with § 178.813 and the internal visual inspection
was performed before the IBC is filled and offered for transportation (§ 180.352(g)).
Furthermore, the letter stated that this evidence should be from the third party that performed the
tests and inspections and identify the company as able to rely on that testing for the purposes of
the repair.
It is the responsibility of the person that repairs the IBC to make sure these requirements are met
before the IBC is filled and placed into transportation in commerce. If an inspector shows up at
a company's facility and sees that it conducts repairs of composite IBCs by replacing the rigid
inner receptacle, the company must provide evidence of leakproofness tests and internal visual
inspections. If the testing and inspections are done on-site, this is generally done at the
discretion of the inspector through a demonstration of the company's testing or inspection
procedures. If the company relies on a third party to conduct the required testing and
inspections, then the company must provide evidence of its reasonable and mutually
acknowledged reliance.
In your correspondence dated August 24, 2012, you cited an email between William Schoonover,
manufacturer. Furthermore, you proposed that this contradicts and therefore invalidates (at least
in part) the Interpretation issued just three months earlier.
We would like to clarify that Mr. Schoonover correctly expressed the Agency position that a
letter individually addressed to a company is not needed. However, this does not contradict the
visual inspection in the circumstances described in the Interpretation is obligated to provide
Mr. Schoonover in the exchange you cited contradicts the Agency guidance set forth in PHMSA
Interpretation No. 12-0056.
Once a company replaces the rigid inner receptacle of a composite IBC, according to the HMR,
it has conducted a repair. This triggers the requirement for a leakproofness test and an internal
visual inspection as specified in §180.352(d)(1) on the rigid inner receptacle of a composite
IBC. Additionally, in accordance with §180.352(d)(1)(iv), the person performing the tests must
durably mark the month and year of the testing and inspections after the repair. If the inner
bottle has been tested, inspected, and marked by a third party, the date durably marked must also
reflect the date of repair. If the inner bottle is marked with the month and year prior to the date
of repair, it would need to be re-tested in accordance with §180.352(d)(1).
Therefore, in response to your correspondence dated August 24, 2012, I am issuing this letter as
a clarification and affirmation of PHMSA Interpretation No. 12-0056.
2

<<<PAGE 3>>>

3
I hope this information is helpful. Please contact this office if you have any additional
questions.
Sincerely,
Josh Solemy,
Joseph Solomey,
Senior Assistant Chief Counsel for
Hazardous Materials Safety