# Gas Pipeline Safety Division — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-01-0114
- **title:** Gas Pipeline Safety Division — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2001-08-17
- **effective on:** Not available
- **summary:** PI-01-0114 response to Gas Pipeline Safety Division concerning 192.3.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-01-0114.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-01-0114.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-01-0114
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2001/g01-08-17_Blanton_192.3_Transmission-n_5.4.11.pdf
**body:**

<<<PAGE 1>>>

PI-01-0114
U.S. Department of Transportation
400 Seventh Street, S,W, Washington, D.C. 20590
Research and Special Programs Administration
Mr. Glynn Blanton
Chief, Gas Pipeline Safety Division
Tennessee Regulatory Authority
460 James Robertson Parkway
Nashville, TN 37243
Dear Mr. Blanton:
This refers to your enclosed letter of January 22, 2001, in which you ask whether the
Stone Mountain Pipeline Company (Stone Mountain) project, as described below, is
jurisdictional to our agency.
According to the information provided, Stone Mountain currently has 63 miles of
pipelines extending from Kentucky to Virginia which the Federal Energy Regulatory
Commission (FERC) regards as a gathering system and does not regulate. However,
Stone Mountain has started a project which will add a ten-inch pipeline from the south
end of the ten-inch Martins Fork to Rose Hill pipeline to a proposed Rogersville
Compressor Station. . This pipeline will be used to deliver gas gathered from many fields,
through as many as 62 wells, into the East Tennessee system at an interconnection
downstream of the Rogersville Compressor Station, East Tennessee will build a lateral to
the proposed site of the interconnection pursuant to its blanket authority from FERC.
According to Stone Mountain, some of the lines feeding into the ten-inch pipeline will be
several miles long and will act as "backbone" pipelines that will collect gas from
numerous feeding lines along their length.
Onshore gathering lines are not subject to 49 CFR Part 192 if they lie outside of the limits
of an incorporated or unincorporated city, town, or village or any designated residential
or commercial area. Assuming that the Stone Mountain project will lie entirely outside of
these areas, the issue is whether the ten-inch pipeline that is being constructed between
Rose Hill, Virginia, and the proposed Rogersville Compressor Station, is classified as a
gathering line or a transmission line.
49 CFR. § 192.3 explains that a gathering line ends at a transmission line, and a
transmission line is a pipeline that transports gas from a gathering line to a distribution
center, storage facility or large volume customer that is not downstream from a
distribution center.
Accordingly, the Office of Pipeline Safety (OPS) historically has selected the appropriate
end point on a case-by-case basis, primarily using four points. These four points include

<<<PAGE 2>>>

(1) the outlet of a processing plant; (2) if there is no upstream processing plant, the outlet
of a main compressor; (3) if there is no processing plant or compressor station, then the
point where two or more well lines converge; and (4) if no other point is appropriate, the
point where there is a change in ownership of the pipeline. In addition, once designated
as a transmission line, no portion of the line may be redesignated as a gathering line even
if further commingling of gas occurs downstream.
Stone Mountain believes that FERC will continue to classify their entire system as a
gathering system. However, OPS is not bound by FERC's classification of gathering lines
under the Natural Gas Act (15 U.S.C. § 717 et seq.), 49 U.S.C. § 60101(b)(1)(B)(ii),
This. means that although FERC may continue to classify the Stone Mountain system as
a gathering system, OPS is not required to do so.
Although the Stone Mountain project clearly does not contain a processing plant, it will
have three compressor stations, located at Martins Fork and Rose Hill, Virginia, and
Rogersville, Tennessee. As used in our four-point test, a main compressor is one that has
the main function of moving gas in transportation even if it also enhances the production
process. Because the Rose Hill Compressor Station is not currently being used to gather
gas from the existing upstream facilities, it appears that it will be used to move gas
through the proposed ten-inch line from Rose Hill to Rogersville. Therefore, this is the
last logical end point far the gathering line and, therefore, the point at which the
transmission line begins. Because this line becomes a transmission line no further
downstream than Rose Hill, Virginia, it cannot be redesignated a gathering line in
Tennessee, even if it receives additional gas from other gathering lines.
The Stone Mountain ten-inch pipeline from Martins Fork to Rose Hill and continuing to
the Rogersville Compressor Station is expected to receive and commingle gas from as
many as 62 wells located in multiple fields. Moreover, this line currently serves four
market delivery points, including a federal prison, and Stone Mountain anticipates an
additional delivery point to the Hawkins County Utility District, The ten-inch pipeline
appears to be transporting gas from the incoming gathering lines to its delivery points
and, finally, to the East Tennessee interconnect. Therefore, OPS characterizes the ten-
inch line from the proposed Rose Hill Compressor Station to the proposed Rogersville
Compressor Station as a transmission line.
Interstate transmission lines are subject to the jurisdiction of OPS. Intrastate transmission
lines are subject to the jurisdiction of the state under its Section 60105 certification.
According to 49 U.S.C. § 60101(a), an interstate pipeline must be subject to the
jurisdiction of FERC under the Natural Gas Act and intrastate pipelines are not subject to
the jurisdiction of FERC. Therefore, the determination of whether this is a interstate or
intrastate pipeline is based on whether FERC has jurisdiction over the pipeline. Because
this segment is not certificated by FERC, it is an intrastate transmission line and,
therefore, it is subject to jurisdiction by the Tennessee Regulatory Authority under its
Section 60105 certification.
If we can be of further assistance in this matter, please contact me at (202) 366-4565.

<<<PAGE 3>>>

Sincerely yours,
Richard D. Huriaux, P.E. Manager, Regulations Office of Pipeline Safety
Enclosure
BILLING CODE 4910-60-P

<<<PAGE 4>>>

TENNESSEE REGULATORY AUTHORITY
460 James Robertson Parkway Nashville
Tennessee 37243-0505
January 22, 2001
Mr. Bennie Andrews, State Liaison
U.S. DOT/RPSA/OPS
Atlanta Federal Center, Suite 16T15
61 Forsyth St. SW
Atlanta, GA 30303
Dear Bennie,
Enclosed please find the information that I discussed with you last week pertaining to a natural
gas gathering system (Evan Energy) that will be constructing a ten-inch pipeline from Virginia
into Tennessee to an interconnection with Duke Energy Gas Transmission in Rogersville,
Tennessee. Evan Energy stated, "We are not an interstate pipeline company and not
jurisdictional to federal authority." They have filed the enclosed information with our agency to
make us aware of the pipeline construction activities that started on January 8, 2001. During our
meeting with them on December 19, 2000 they mentioned that they would provide us additional
information on a meeting they had with FERC on federal jurisdiction. We have not received the
information but anticipate the document being filed with our office in the coming week.
Your assistance in reviewing this information and determining if this operator is jurisdictional to
your agency would be appreciated. I would like to request your decision be provided to our
office as soon as possible since this project is on a fast track to be installed.
Sincerely,
Glynn Blanton, Chief
Gas Pipeline Safety Division

<<<PAGE 5>>>

Excellence with Energy
EVAN ENERGY
January 9, 2001
Glynn Blanton
Tennessee Regulatory Authority
460 James Robertson Parkway
Nashville, TN 37243-0505
RE: Stone Mountain Pipeline Company, LC Pipeline Technical Information
Dear Glynn:
On Tuesday, December 19, 2000, Stacey Vamey, Evan Energy Company's Vice President of
Marketing and Finance met with you to discuss Stone Mountain Pipeline Company's upcoming
pipeline gathering project located in Hancock and Hawkins Counties, Tennessee (Stone
Montanan Pipeline Company is an wholly-owned subsidiary of Evan energy Company, LC).
Stacey requested that I further provide you with our preliminary construction schedule and to
further elaborate as to the technical details of the project.
Stone Mountain Pipeline plans on beginning Initial construction late this week, the week of
January 8, 2001. A clearing crew will be mobilizing into the Mulberry Gap area northwest of
Sneedville. The pipeline spread should move in approximately one week later to begin laying the
10" steel gathering pipeline.
As of today, our land acquisition crews have acquired 46,020 feet of rights- of-way in Hancock
County, leaving a balance of 10,390 feet to be acquired. In Hawkins County we have procured
16,000 feet of rights-of-way, leaving an approximate balance of 24,000 feet to be acquired. We
expect to move a second crew to the construction schedule in early March and anticipate the
project completion, to the Rogersville compressor site, by September 1, 2001.
The gathering facilities will be constructed in accordance with The Department of
Transportation codes and standards. Cathodic protection will be installed at 300-foot intervals.
A minimum of 15% of the welds will be x-rayed. Nesbitt Engineering will provide project
inspection. The project will require a General Stream Crossing Permit and a permit to bore the
Clinch River. Nesbitt Engineering, with Bud Baldridge as the lead engineer, will prepare the
necessary permits.
Topo maps of the line route are included in this package. The topo maps consist of Back Valley,
Sneedville, Lee Valley and Camelot. Valve locations and the final location of the Rogersville
Compressor Site have not been finalized. Upon determination of these locations, I will forward a
design schematic for your records. If you have any questions you can contact me or Bill
Hubbard. Bill Hubbard is Stone Mountain Pipeline Company's Vice President of Pipeline
Construction and Operations. We can be reached at the following phone numbers:
Brant Camp Office: 423-245-4900
Mobile: 423-534-9251

<<<PAGE 6>>>

E-mail: bcamp@evanenergylc.com
Bill Hubbard Office: 540-445-5950
Mobile: 423-956-1236
Stacey also suggested that we plan an initial site visit and review with you. At your convenience,
I would like to plan a meeting in Hancock County to review the particulars of the project.
Once again, if you should need additional information or have questions, please feel free to give
me a call.
Sincerely,
Brint Camp
Chief Operating Officer
Enclosure — As Noted
cc: Stacey Varney, Evan Energy Company, LC
Mark Pate, Evan Energy Company, LC
Tim Kingsmill, Duke Energy Gas Services Corporation

<<<PAGE 7>>>

Glynn Blanton – MEMORANDUM
From: <tpkingsmill@duke-energy.com>
To: <gblanton@mail.state.tn.us>
Date: 2/5/01 2:08PM
Subject: MEMORANDUM
Glynn, Attached is the information you requested regarding the Stone Mountain gathering
project. We will be forwarding originals and certain FERC rulings in this regard as well. I hope
this answers the questions you may have about the project and please call me with any other
questions.
Thanks You, Tim
-----Forwarded by Tim P. Kingsmiil/Mktg/TETCO/PEC on 02/05/01 02:03 PM
-----
"Patten,
Neil" To: "Gerik, Rodney (Duke)" <regerik@duke-energy.com>,
<npatten@vela "'tpkingsmill@duke-energy.com"' <tpkingsmill@duke-
energy.com>
w.com> cc: "Johnson, Judy (Partner)" <jjohnson@velaw.com>
Subject: MEMORANDUM
02/05/01
01:49 PM
«443833_2.DOC» ++++++CONFIDENTIALITY NOTICE+++++
The information in this email may be confidential and/or privileged. This email is intended to be
reviewed by only the individual or organization named above. If you are not the intended
recipient or an authorized representative of the intended recipient, you are hereby notified that
any review, dissemination or copying of this email and its attachments, if any, or the information
contained herein is prohibited. If you have received this email in error, please immediately
notify the sender by return email and delete this email from your system. Thank You
(See attached file: 443833_2.DOC)
CC: <regerik@duke-energy.com>, <svarney@evanenergylc.com>

<<<PAGE 8>>>

Page 1
February 5, 2001
Vinson & Elkins
Attorneys At Law
Vinson & Elkins L.L.P
2300 First City Tower
1001 Fannin Street
HOUSTON, TEXAS 77002-6760
February 5, 2001
Rodney E. Gerik
Duke Energy Corporation
5600 Westheimer Court
Houston, Texas 77
Re: Stone Mountain Project
Re: Stone Mountain Project
Dear Rod:
Pursuant to your request, attached hereto is an analysis of whether the Stone Mountain
project (as defined in the attached memo) will be exempt from the jurisdiction of the Federal
Energy Regulatory Commission under the Natural Gas Act. As set forth in the attachment, and
based on information provided to us by your, it appears likely that the Commission would
determine that Stone Mountain performs primarily a gathering function under current
Commission and case law precedent. The details of this analysis are set fort in this attachment.
Please call if you have any questions.
Very truly yours,
Judy M. Johnson

<<<PAGE 9>>>

MEMORANDUM
February 5, 2001
TO: Judy Johnson
FROM: Neil Patten
RE: Application of the Commission's Modified Primary Function
Factors to the Stone Mountain Project
I. QUESTION PRESENTED
Does the Stone Mountain Project ("Stone Mountain") meet the tests applied by the
Federal Energy Regulatory Commission (the "Commission") in determining that particular
facilities perform a gathering function, exempt from the Commission's Natural Gas Act ("NGA")
jurisdiction?
II. BRIEF ANSWER
Based on Stone Mountain's physical, geographic, and other features, and based on
current Commission precedent, it seems likely that the Commission would determine that Stone
Mountain performs primarily a gathering function.
III. DISCUSSION
A. Description of the Facilities
In its present state, the Stone Mountain Gathering System (a natural gas system not
subject to FERC jurisdiction) consists of 63 miles of two, four, six, eight, and ten inch pipe,
extending from Kentucky south to Virginia.1 Proposed construction would add an additional 81
miles of two to ten inch gathering lines to the Stone Mountain System to gather gas from wells
in and around the system (some of which are not currently producing due to the lack of
infrastructure and connection to markets) for delivery into the East Tennessee system at an
interconnection downstream of the Rogersville compression station.2 East Tennessee will build a
lateral (twelve inches in diameter) to the proposed site of interconnection pursuant to East
Tennessee's blanket authority.
B. Interstate Commerce
It is well established that merely crossing state lines does not affect a gathering system's
non-jurisdictional status.
3 Accordingly, the next analytical step is to determine whether the
facilities are gathering in nature under the applicable Commission test as applied to on-shore
facilities.
C. The Modified Primary Function Test
Under NGA Section 1(b), the Commission has jurisdiction over the transportation and
sale for resale of natural gas in interstate commerce and any natural gas company engaged in
such transportation or sale. By the specific terms of the NGA, the Commission's jurisdictional
power, however, does not extend to facilities used for the production or gathering of natural
gas.4

<<<PAGE 10>>>

1We have been informed that the existing Stone Mountain Gathering System is regarded as a gathering system and is
not currently regulated by the Commission.
2 An extension of the existing Stone Mountain facilities, similar to the one now proposed, albeit with a different,
longer route, was developed by the previous owners of Stone Mountain and discussed with three members of the
Commission staff on June 4, 1998; staff, at that time, informally advised that the proposal was consistent with a
gathering function.
3 See Columbia Gas Transmission Corporation and Norse Pipeline, L.L.C., 85 FERC ¶ 61,191 (1998), reh'g denied, 86
FERC 1161,137 (1999).
4 See 15 USC § 717(b) (1994) (noting that "The provisions of this chapter shall apply to the transportation of natural
gas in interstate commerce, to the sale in interstate commerce of natural gas for resale for ultimate public
consumption for domestic, commercial, industrial, or any other use, and to natural-gas companies engaged in such
transportation or sale, but shall not apply to any other transportation or sale of natural gas or to the local distribution
of natural gas or to the facilities used for such distribution or to the production or gathering of natural gas."). 15
U.S.C. § 717(b) (1994).

<<<PAGE 11>>>

The NGA does not further define gathering, but the Commission has, on a case by case basis,
described a set of factors it considers in determining the primary function of a facility, currently
know as the "modified primary function test."5 For an on-shore facility, these factors include: (1)
the length and diameter of the line; (2) the extension of the facility beyond the central point of
the field; (3) the facility's geographic configuration; (4) the location of compressors and
processing plants; (5) the location of wells along all or part of the facility; and (6) the operating
pressure of the line.6 Additionally, the Commission also considers the purpose, location, and
operation of the owner of the facility and whether the jurisdictional determination is consistent
with the objectives of the NGA.7 Moreover, the Commission does not consider any one factor of
the modified primary function test to be determinative and recognizes that all factors do not
necessarily apply in all situations.8 The goal is to determine whether the primary function of the
facility is to gather gas from production areas for delivery into a major transmission facility.
D. Application of the Modified Primary Function Test to the Instant Facts
Applying the factors outlined above to Stone Mountain's physical, geographic and other
features suggests that Stone Mountain's facilities are most likely gathering in nature.
1. Length and Diameter of the Lines
The portion of Stone Mountain yet to be built will consist of 81 miles of two to ten inch
line. The Commission generally considers lines with such a small diameter to be gathering lines,
and has found lines with diameters up to 20 inches gathering9 when reviewed in the context of
the other factors.10 And although several line sections in the system are fairly long by gathering
standards—one of the lines currently on the system, and another proposed line, are in excess of
35 miles—these long lines are, or will be "backbone" pipelines that will collect gas from
numerous feeding lines along their length. The Commission has held that such backbone lines
are consistent with a gathering function.11 Moreover, the small diameter of these lines,
combined with their low pressure and the fact that no one factor is paramount in determining
function status, suggests that length alone will probably not engender a transmission label.
2. Central Point in the Field
The central point in the field test is based on the idea that gathering involves the
collection and movement of gas through various lines to a central point where the gas is
delivered into a single line for transmission. Any facilities located upstream of the central point
are considered non-jurisdictional gathering lines. The Commission has recognized that
identifying the central point in the field is not always possible or easy and may be unnecessary
to a gathering determination.12 Here, however, Stone Mountain plans to gather gas from many
fields and deliver the gas into an East Tennessee lateral and main line. Given, as noted infra, that
there are producing properties throughout the Stone Mountain System and future production is
expected, a logical conclusion would be that the central point, for these many fields would be
that interconnection.13
5ONEOK Midstream Pipeline, Inc., 93 FERC 1161,042 (2000).

<<<PAGE 12>>>

6 See Farmland Industries, Inc., 23 FERC 1161,063 (1983).
7See Amerada Hess Corporation, 52 FERC 1161,268 (1990) and Amerada Hess Corporation, ("Amerada Hess II 67 FERC
1161,254 (1994).
8 Moreover, the Commission's policy for offshore facilities is somewhat different given the unique considerations in
the offshore area. See Amerada Hess II, 67 FERC 1161,254 (1994) (noting that for off-shore facilities the Commission
would consider, in addition to the Farmland factors, the changing and technical nature of offshore exploration and
production).
9 ONEOK Midstream Pipeline, Inc., 93 FERC ¶ 61,042 at (2000).
10 See Noram Gas Transmission Company, 82 FERC ¶ 61,330 (1998) (holding that small diameter line segments—
between 2 and 12 inches are "consistent with a gathering determination."). Id. at p. 62,308. See also, KN Gas
Gathering, Inc., 69 FERC 61,378 at p. 62,435 (1994).
11 See Arkla Gathering Services Company, 67 FERC ¶ 61,257 at p. 61,867 (1994), and Northwest Pipeline Corporation,
et al., 59 FERC ¶ 61,115 at p. 61,434 (1992).
12See Arkla Gathering Services Company, 67 FERC 61,257 at p. 61,867 (1994).
13 See Id.

<<<PAGE 13>>>

3. Geographic Configuration
Commission precedent holds that systems set up in web, spoke or backbone type
designs are suggestive of a gathering function.14 Here, nine wells are currently producing and
delivering gas into the system via laterals. Moreover, Stone Mountain plans to gather gas from
existing wells not now able to produce due to the lack of a gathering system and delivery
system, and what is projected to be numerous producing wells in the area via small diameter,
low-pressure laterals. As projected, these laterals will give the system a backbone-type
configuration, which, as noted above, the Commission generally finds to be indicative of a
gathering function.
4. Location of Processing Facilities and Compressors
Commission precedent holds that for on-shore gathering facilities located upstream of a
processing plant indicate a gathering function.15 Given the nature of the gas that feeds into the
system, Stone Mountain currently sees no need for a processing plant.
The system has many small field compressors, which the Commission tends to view as
supporting a gathering function. 16
Further, the Rogersville compression station itself most likely performs a non-
jurisdictional gathering function. Ranging from 150 to 5,000 horsepower, the size of the
Rogersville compression station is similar to other compression facilities found to be gathering in
nature.17 Moreover, at Rogersville, new gas supplies that come from exclusively non-
jurisdictional lines are compressed above the pressure threshold needed for delivery into East
Tennessee's lateral and main lines. As the Commission has stated, "we view the act of
compressing gas volumes from a production area in order to enable lower pressure supplies to
enter a higher pressure mainline as the last act in the gathering process."18
Additionally, the compressor at Rogersville acts to lower the line pressure upstream,
allowing gas to come in from the producing areas and giving this low-pressure production a
boost. Commission precedent holds that "a significant boost in pressure is often necessary to
enable gas to move from the lower pressure gathering system into transmission lines" and "this
type of compression is ... integral to the gathering function."19 Thus, because pressure change at
Rogersville can increase the rate of production upstream of the wellhead, the compression at
Rogersville serves to pull produced volumes through gathering lines; this clearly indicates a
gathering function.2° Finally, the Commission, in the El Paso21 cases—which analyzed the
jurisdictional status of various compression facilities—recently held that only those facilities
upstream of a processing system provided non-jurisdictional gathering services. The Rogersville
compression station, while not upstream of any processing facilities, provides a boost in
pressure both for the gas to enter the East Tennessee mainline and to increase production
upstream, much like the compressors at issue in the El Paso cases, where the Commission noted
that such activities, "would be non-jurisdictional gathering regardless of whether the cryogenic
plant or any other non-jurisdictional processing facilities were located immediately
downstream."22

<<<PAGE 14>>>

14 See e.g., id.
15 See Amerada Hess Corporation, 67 FERC ¶ 61,254 at p. 61,846 (1994).
16 See GPM Gas Corporation v. EL Paso Natural Gas Co., 81 FERC 1161,208 (1997) (holding that "minimal compression
in the field that facilitates production from low pressure wells is consistent with a gathering function."). Id. at p.
61,888.
17 See id. (finding a compressor with 7,660 horsepower to be gathering).
18 Williams Field Services Group, Inc. v. El Paso Natural Gas Company, 89 FERC 1161,161 at p. 61,149 (1999)
19 See GPM Gas Corporation v. EL Paso Natural Gas Co., 81 FERC 1161,208 (1997)
20 See Williams Field Services Group, Inc. v. El Paso Natural Gas Company, 89 FERC 1161,161 at
p. 61,149 (1999).
21 See id, and GPM Gas Corporation v. El Paso Natural Gas Co., 81 FERC 1161,208 (1997); El Paso
Natural Gas Company, 81 FERC 1161,209 (1997).
22 Williams Field Services Group, Inc. v. El Paso Natural Gas Company, 89 FERC 1161,161 at p. 61,149 (1999) (quoting
El Paso Natural Gas Company, 84 FERC ¶ 61,048 at p. 61,205 (1998)).

<<<PAGE 15>>>

5. Location of Wells Along All or Part of the Facility
Commission precedent holds that wells along all or part of the facility suggest a
gathering function.23 As noted above, nine wells along Stone Mountain are already operational
and producing. Moreover, there are approximately 30 existing wells in close proximity to the
system that are to be connected. Also, there is another producing field adjacent to the
backbone that offers a potential tie-in and acreage in the area is currently being acquired to
begin drilling operations. In total 62 wells are projected to be operational and connected to the
system by September 1, 2001. The Commission currently allows consideration of anticipated
production in determining gathering status.24
6. Operating Pressure
The Commission has held that low operating pressure indicates a gathering function.25
Most of the lines in the Stone Mountain system operate, or will operate, at pressures between
300 psig and 700 psig, which fall within, or very close to, the range the Commission normally
accepts for gathering facilities.26
7. Purpose of Stone Mountain
The central purpose of the Stone Mountain system is to gather gas from producing wells
for ultimate delivery onto the proposed East Tennessee interconnect. Stone Mountain currently
has only a few small market deliveries—a local municipality, a local restaurant, an asphalt plant,
and a federal prison. Additionally, Stone Mountain projects that, in addition to the
interconnection at East Tennessee, it will have only one delivery point in Tennessee, the
Hawkins County Utility District. Furthermore, Stone Mountain has a very limited market for
potential deliveries, which is clearly indicative of a primary purpose of gathering.
IV. CONCLUSION
The Stone Mountain system is comprised of small diameter, low-pressure lines, arrayed
in a backbone configuration around the area's existing and projected producing wells.
Moreover, the principal stated purpose of the system is to gather gas from producing wells for
delivery to East Tennessee. Therefore, under the modified primary function test, as the
Commission currently applies it, Stone Mountain most likely performs, and will continue to
perform, a gathering function. Of course, any opinion as to the status of a gathering facility may
be affected by new Commission or court decisions, or legislation. These contingencies, however,
are factors that will always affect a determination of gathering status.
23 See Williams Natural Gas Company, et al., 67 FERC 1161,252 (1994).
24 See Dauphin Island Gathering System, 79 FERC 61,391 (1997) (noting that "Dauphin Island anticipates attaching
new production" from both shallow and deep water reserves.). Id. at p. 62,658.
25 See id. at p. 61,829.
26 See El Paso Natural Gas Company, 72 FERC 1161,220 at p. 62,012 (1995) (finding that pressures between 500 and
750 psig were "not inconsistent with a gathering function."). Id.