# National Transportation Safety Board — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-07-0101
- **title:** National Transportation Safety Board — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2007-02-16
- **effective on:** Not available
- **summary:** PI-07-0101 response to National Transportation Safety Board concerning 192.612.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-07-0101.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-07-0101.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-07-0101
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2007/g07-02-16_Dyck_192.612-n_5.4.11.pdf
**body:**

<<<PAGE 1>>>

PI-07-0101
February 16, 2007
Mr. Rod Dyck
Pipeline Operations Group Chair
National Transportation Safety Board
490 L ‘Enfant Plaza, SW
Washington, DC 50594-0001
Re; Gas pipeline incident I West Cote Blanche bay, Louisiana
Dear Mr. Dyck:
This letter responds to your request for a determination by the Pipeline and Hazardous
Materials safety Administration (PHMSA) of the regulatory status of an 8-inch gas pipeline involved in an
incident in west Cote Blanche Bay, Louisiana on October 12, 2006. PHMSA has determine that the
pipeline segment involved in the incident is subject to the pipeline safety requirements in 49 C.F.R.
§192.612 based on the depth of water and because the pipeline’s location places it within an “inlet” of
the Gulf of Mexico for purposes of 49 C.F.R. §192.3.
The pipeline is an 8-inch gas gathering line operated by Chevron USA, which transports
processed gas to gathering systems. The pipeline was apparently damages when a barge traveling
above the pipeline released a spud or stabilizing stake, which penetrated the ground bed and punctured
the pipeline, causing an explosion. The line had approximately 24 to 48 inches of cover when the
incident occurred. The water depth at the location is approximately 8 feet.
Section 60102(a)(2) of title 49, United states Code, authorizes PHMSA to prescribe standards for
gas pipeline transportation. Gas pipeline transportation includes gathering, transmission and
distribution of gas by pipeline, but only includes gathering through “regulated gathering lines.” The
minimum safety requirements for gas pipeline facilities and the transportation of gas are set forth in 49
C.F.R. Part 192. Under §192.1, these regulations do not apply to the onshore gathering of gas “through
a pipeline that is not a regulated onshore gathering line (as determined in §192.8)” or “within inlets of
the Gulf of Mexico, except for the requirements in §192.612”
PHMSA defines “regulated onshore gathering line” as a gathering line with particular
characteristics located in a Class 2, 3, or 4 area. While regulated onshore gathering lines must comply
with the gas pipeline safety regulations under §192.9, onshore gathering lines in a Class 1 area, such a
West Cote Blanche Bay, are not subject to Part 192, except that all onshore gathering line within the
Gulf of Mexico and its inlets are subject to the requirements in §192.612 for reducing the risks
associated with vessels hitting underwater pipelines.
Section 192.612 requires each operator to “identify its pipelines in the Gulf of Mexico and its
inlets in waters less than 15 feet (4.6 meters) deep as measured from mean low water that are at risk of
being an exposed underwater pipeline or a hazard to navigation.” An operator must also “conduct
appropriate periodic underwater inspections of its pipelines in the Gulf of Mexico and its inlets in waters
less than 15 (4.6 meters) deep as measured from mean low water based on the identified risk.” If an
operator discovers that a line has become exposed or poses a hazard to navigation, the operator must

<<<PAGE 2>>>

promptly notify the National Response Center, mark the location of the pipeline, and within 6 months
bury the pipeline so that the top of the pie is 36 inches below the natural bottom (18 inches for rock
excavation).
PHMSA defines “the Gulf of Mexico and its inlets” to mean “waters from the mean high water
mark of the coast of the Gulf of Mexico and its inlets open to the sea (excluding rivers, tidal marshes,
lakes, and canals) seaward to include the territorial sea and Outer Continental Shelf to a depth of 15 feet
(4.6 meters), as measured from the mean low water.” (§192.3) Based on its geography, and in
accordance with this agency’s prior interpretations, we consider West Cote Blanche Bay an “inlet” of the
Gulf of Mexico within the meaning of §192.612. Accordingly, to the extent that the pipeline is located in
waters less than 15 feet deep (including at the point of impact), the pipeline involved in the October 12,
2006 incident is subject to the inspection and reburial requirements in §192.612. However, because the
pipeline does not meet the definition of a regulated onshore gathering line, the pipeline is not subject to
the other Part 192 requirements.
PHMSA intends to review these regulations, in particular the definition of “Gulf of Mexico and
its inlets” in §192.3, to determine if any changes to the text are necessary to improve clarity and
promote more consistent application of the regulations for pipelines located in the Gulf area. In the
meantime, PHMSA plan to work with the State of Louisiana and our other State partners in the Gulf area
to ensure the pipelines subject to these regulations meet the specifications for burial depth. PHMSA is
also developing additional guidance material for pipeline operators to aid them in complying with these
important safety regulations.
If you have any further questions pertaining to this matter, please contact Mr. Joy Kadnar of my
staff at (202) 366-4595.
Sincerely,
Jeffrey D. Wiese
Acting Associate Administrator
For Pipeline Safety
- **truncated:** false
- **body characters:** 5106
