# Interstate Natural Gas Association of America — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-09-0011
- **title:** Interstate Natural Gas Association of America — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2009-07-17
- **effective on:** Not available
- **summary:** PI-09-0011 response to Interstate Natural Gas Association of America concerning 192.939.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-09-0011.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-09-0011.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-09-0011
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/2009/PI-09-0011.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, D.C. 20590
JUL 1 7 2009
Mr. Terry D. Boss
Senior V.P. of Environmental Safety and Operations
Interstate Natural Gas Association of America
lOG Street, N .E., Suite 700
Washington, DC 20002
Dear Mr. Boss:
In a letter to the Pipeline and Hazardous Materials Safety Administration (PHMSA) dated
March 20, 2009, you requested that PHMSA interpret the statutory seven-year gas pipeline
integrity reassessment interval to allow reassessments to be conducted every seven calendar
years not to exceed 90 months. You expressed your view that the current requirement to conduct
reassessments seven actual years from the anniversary date of a segment's last assessment did
not provide adequate flexibility to pipeline operators in the event of unanticipated developments
and seasonal considerations.
Under 49 U.S.C. 601 09(c)(3)(B), gas pipeline operators are required to periodically
reassess the integrity of pipeline facilities covered by their integrity management
programs "at a minimum of once every 7 years ... ". The implementing regulations at
49 CFR § I 92.939(a) require that reassessments and alternative methods of reassessments
such as confirmatory direct assessments be conducted within the seven-year period after
the previous assessment of a covered segment. This requirement is also reflected in a
Frequently Asked Question available on PHMSA's website reprinted as FAQ 41 below:
FAQ41
Question: Does the requirement that an operator establish inspection intervals not
to exceed a specified number of years mean calendar years (i.e., pipe assessed in
2004 must be re-assessed during 2011) or actual years?
Answer: Re-assessments must be conducted within the specified number of
actual years. For example, a pipe segment assessed on March 23, 2004, must be
re-assessed before March 23, 2011, using at least confirmatory direct assessment.
This segment would need to be re-assessed using one of the methods specified in
the rule before March 23,2014, March 23, 2019, or March 23, 2024, depending
on its operating stress (see § I 92.939). ~

<<<PAGE 2>>>

..
2
Therefore, the current requirement is seven actual years from the anniversary date of the last
assessment of a covered segment.
In your letter, you contend that it would have been permissible under the statute for PHMSA to
adopt a requirement of seven calendar years not to exceed 90 months as you have proposed
rather than the seven actual year requirement given Congress' intent and the legislative context
and history. You also point out that a number of other inspection intervals established by
PHMSA in Part 192 provide for additional flexibility in the interval.
In implementing the statute, PHMSA adopted the seven actual year requirement and did so by
formal rulemaking. Therefore, a change from the current seven actual year requirement to the
seven calendar years not to exceed 90 months approach you are advocating would also have to
be done by rulemaking and cannot be accomplished by "re-interpretation." The other intervals
you point out were all established by rulemaking, not by interpretation.
Accordingly, the seven actual year requirement must remain in place unless and until a
regulatory proceeding to fonnally amend the rule is undertaken. At that time, PHMSA would
invite comment on whether your approach is warranted in tenns of safety and is consistent with
the statute.
I hope that this information is helpful to you. If I can be of further assistance, please contact me
at (202) 366-4046.
~
Jeffrey D. Wiese
Associate Administrator for
Pipeline Safety

<<<PAGE 3>>>

n
March 20, 2009
Jeffrey D. Wiese, Associate Administrator
Pipeline and Hazardous Materials Safety Administration
U.S. Department of Transportation
1200 New Jersey Avenue, S.E.
Washington, DC 20590-0001
VIA FIRST CLASS AND ELECTRONIC MAIL
Re: Request for Reinterpretation: Required Reassessment Interval per 49 C.F.R. § 192.939
Dear Mr. Wiese:
Section 14(a) of the Pipeline Safety Improvement Act of 2002 ("Section 14(a)") established that
integrity management reassessments must occur "at a minimum of once every 7 years."l Ambiguity in
this provision prompted a question: Does the requirement mean calendar years, i.e., that pipe segments
receiving baseline assessments in 2004 would have to be re-assessed sometime in 20 11; or, does the
requirement mean actual years, i.e., each facility would have to be re-assessed no later than seven years
from the day of its baseline assessment. In Frequently Asked Question ("F AQ") 41, the Pipeline and
Hazardous Materials Safety Administration ("PHMSA") interpreted the requirement to mean actual years:
Reassessments must be conducted within the specified number of actual years. For
example, a pipe segment assessed on March 23, 2004 must be re-assessed before
March 23,2011, using at least confirmatory direct assessment. This segment would need
to be re-assessed using one of the methods specified in the rule before March 23, 2014,
March 23, 2019 or March 23, 2024, depending on its operating stress.2
The "anniversary approach" reflected in FAQ 41 is one possible interpretation of Section 14(a).
The better (more flexible) interpretation, the interpretation which harmonizes Section 14(a), recognized
industry standards, operational requirements and PHMSA's own long-standing precedents, is a modified
calendar approach.
For the reasons detailed below, the Interstate Natural Gas Association of America urges
PHMSA to reinterpret Section 14(a) to mean that reassessments must be conducted every seven
calendar years with intervals not exceeding seven and one-half years (90 months).
INGAA 's suggested interpretation is statutorily permissible.
INGAA's suggested interpretation is not precluded by Section 14(a). In fact, INGAA's suggested
interpretation is fully consistent with the statute's broader purposes and Congress's specific reservations
about the proper length for the reassessment interval. Section 14(a) reflects a broader congressional
mandate: establishing pipeline integrity management as a risk-based approach to improving pipeline
safety. The legislative history does not shed light on why Congress chose seven years as the reassessment
2
Pub. L. No. 107-355, 116 Stat. 2985, 3003 (2002) (codified at 49 U.S.C. § 60109(c)(3)(B)).
Available online at http://primis.phmsa.dot.gov/gasimp/FagHome.gim?c=l. The response cites to 49
C.F.R. § 192.939.
INTERSTATE NATURAL GAS ASSOCIATION OF AMERICA
10 G STREET, N.E., SUITE 700' WASHINGTON, D.C. 20002

<<<PAGE 4>>>

Jeffrey D. Wiese
Request for Reinterpretation: Reassessment Interval
March 20, 2009
Page 2 of7
interval, but elements of Section 14 suggest Congress was not wedded to defining the interval as seven
years to the day.
A provision of Section 14(a) granted the Secretary of Transportation broad authority to waive the
reassessment interval as long as pipeline safety was not compromised.3 The statute specifically mentions
waivers based on potential supply disruption or tool availabiIity,4 and these specific grounds appear in
PHMSA's regulations;5 however, the authorization granted in Section 14(a) is not limited to these cases,
and the legislative history indicates waivers should be granted liberally:
The Secretary is authorized to grant waivers and modifications pursuant to [49
U.S.c. § 60118(c)] for any requirement for reassessment of a facility for reasons that
may include the need to maintain local product supply or the lack of internal inspection
devices. The waivers or modifications shall not be inconsistent with pipeline safety. The
Secretary is encouraged to make use of waivers and modifications where necessary and
not inconsistent with purposes of pipeline safety, especially if local product supply
maybe interrupted if a waiver or modification is not granted.6
If Congress intended a strictly enforced, seven-years-to-the-day reading of the reassessment requirement,
it would not have granted the flexibility implicit in Section 14's relatively liberal waiver provision.
One can reasonably interpret the waiver provision as betraying congressional unease about the
propriety of selecting seven years instead of some other reassessment interval. Such unease is further
evidenced by Section 14(d) of the 2002 Pipeline Safety Act, which directed the Comptroller General to
evaluate the seven year interval and issue a report.7 The report concluded that the seven year interval was
needlessly conservative, and the preferred course would be to adopt industry consensus standards that
establish a range of reassessment periods (generally longer than seven years) based on a set of risk
factors, technical data and engineering analyses.8 INGAA is not mentioning this report to re-argue the
merits of risk-based reassessment intervals. It is sufficient to note that Congress would not have
requested this evaluation if it was certain that a seven year reassessment level was precisely right.9
Pub. L. No. 107-355, 116 Stat. 2985, 3005 (2002) (codified at 49 U.S.c. § 60109(c)(5».
4
6
7
9
Id.
49 C.F.R. § 192.943(a)(l), (2).
H.R. Rep. No. 107-605, pt. 2, at 27-28 (2002) (emphasis supplied).
Pub. L. No. 107-355, 116 Stat. 2985, 3005 (2002).
Government Accountability Office, Pub. GAO-06-945, Natural Gas Pipeline Safety: Risk-Based Standards
Should Allow Operators to Better Tailor Reassessments to Pipeline Threats 5-6 (Sep. 2006) ("GAO
Reassessment Report"). The report notes that the Department of Transportation generally agreed with
these findings. Id. at 6.
It could also be argued that when Congress adopted Section 14 it was not writing on a clean slate. As
detailed later in this letter, by 2002 PHMSA's predecessors had adopted over 20 different natural gas
regulations using flexible scheduling instead of rigid, recurring intervals. Viewed from this perspective,
Congress could well have assumed PHMSA would apply similar flexibility to the seven year reassessment
interval.

<<<PAGE 5>>>

Jeffrey D. Wiese
Request for Reinterpretation: Reassessment Interval
March 20, 2009
Page 3 of7
INGAA 's suggested interpretation is operationally necessary.
The GAO Reassessment Report correctly noted that integrity assessments and reassessments are
not spread evenly throughout the year:
In early 2006, INGAA and [the American Gas Association ("AGA")] polled their
members about their experiences with and plans for conducting assessments and
reassessments during off-peak and peak months. Overall, INGAA and AGA found that,
from 2003 to 2012, members plan to conduct 76 percent of their baseline assessments and
reassessments on their gas transmission pipelines (measured in miles) during the off-peak
spring and summer months, 18 percent in the fall, and 6 percent in the winter. lo
FAQ 41 's anniversary approach will force operators to schedule reassessments a month or two before a
pipeline segment's anniversary date, simply to create a cushion that will ensure compliance in the event
of unanticipated developments. For segments with anniversary dates early in the reassessment season
there are only two ways to maintain this cushion: schedule the reassessment during the peak season or,
more likely, schedule the reassessment close to a year early. Even segments with anniversary dates late in
the off-peak season are only a few reassessment cycles away from this dilemma, as cushioning will tend
to cause scheduled inspections to drift closer and closer to the beginning of the off-peak season.
Moreover, a strict anniversary approach gives operators no flexibility to schedule reassessment
activities within a given off-peak season. Segments must be re-assessed in the order of their baseline
assessments, even if developments during the intervening seven years would make a different order more
efficient or preferable based on risk factors.
INGAA's suggested interpretation addresses these problems by giving operators the flexibility to
schedule reassessments efficiently within a peak season. This approach enhances pipeline operations and
avoids waiver requests that would otherwise impose regulatory costs on operators and PHMSA. These
benefits would be achieved without compromising pipeline safety, as all pipeline segments would have to
be reassessed within seven calendar years.
INGAA 's suggested interpretation not only accords with industry standards, it exceeds them.
As noted in the GAO report, the industry consensus standard for integrity reassessment is
Standard ASME B31.8S-2004,1l approved and issued by the American Society of Mechanical
Engineers.12 Under B31.8S, the generally applicable reassessment interval for pipelines operating above
50% of specified minimum yield strength is 10 years. 13
10
II
12
13
Id. at 34.
Id. at 14.
American Society of Mechanical Engineers, Pub. ASME 831.8S-2004, Managing System Integrity of Gas
Pipelines (Jan. 2005) ("8312.8S").
Id at 23, Figure 4 - Timing for Scheduled Responses: Time-Dependent Threats, Prescriptive Integrity
Management Plan (Jan. 2005). This request for reinterpretation is not intended to apply to cases where a
shorter reassessment period is warranted by the 22-point threat assessment detailed in 831.8S section 2,
which is incorporated into PHMSA's regulations. 49 C.F .R. § 192. 7( c )(2)(D)(5) (incorporating 8312.8S by
reference); 49 C.F.R. § 192.917(a) (imposing 831.8S section 2 as substantive regulation).

<<<PAGE 6>>>

Jeffrey D. Wiese
Request for Reinterpretation: Reassessment Interval
March 20, 2009
Page 4 of7
Under INGAA's suggested interpretation, the maximum reassessment interval would be seven
and one half years, 14 still far more conservative than B31.8S.
INGAA 's suggested interpretation is in line with long-standing P HMSA precedent.
Over 30 years ago, PHMSA's predecessor recognized that rigid compliance schedules do not
sufficiently allow operators sufficient operational flexibility .15 The agency responded by amending a
series of Part 192 regulations to redefine rigid compliance schedules more flexibly:
Regulation (49 C.F.R.) Subject Original Compliance Schedule Amended Compliance
Schedule
192.465(b) Inspection of cathodic protection rectifiers Inspect at intervals not exceeding two months. Inspect six times annually at
intervals not exceeding two
and one-half months.
192.465(c) Inspection of reverse current switches, diodes and interference bonds Inspect at intervals not exceeding two months. Inspect six times annually at
intervals not exceeding two
and one-half months.
192.477 Inspection of coupons or other means of monitoring internal corrosion Inspect at intervals not exceeding six months. Inspect twice annually at
intervals not exceeding seven
and one-half months.
192.481 Evaluation of offshore pipelines exposed to the atmosphere Evaluate at intervals not exceeding one year. Evaluate once each calendar
year but with intervals not
exceeding 15 months.
The agency expanded flexible compliance scheduling in 1982, noting the operational justification for this
approach and confirming the absence of any reduction in pipeline safety:
Petitioners . . . have argued that such recurring time intervals do not permit
sufficient flexibility in scheduling personnel. They stated that the extremes of weather
and unexpected delays in scheduled work unavoidably conflict with the specified
intervals, but that restating the periodic requirements on a calendar year basis, with
longer intervals, would provide the flexibility needed to schedule personnel to meet the
requirements without reducing public safety.
Experience shows that requirements for periodic action on a fixed recurring
interval do not allow sufficient flexibility in scheduling personnel. However, minor
modifications which extend the intervals without reducing the number of inspections,
tests, or other activities that must be performed each year will allow operators more
discretion in scheduling. 16
As shown below, the 1982 amendments affected 18 substantive provisions within Part 192:
14
15
16
Even this is an overstatement. Requiring reassessment every seven calendar years ensures that seven and
one half year reassessments could not be stacked one on top of another.
Corrosion Control Requirements, 43 Fed. Reg. 39839 (1978).
Transportation of Natural and Other Gas and Hazardous Liquids by Pipeline; Inspection and Test
Intervals, 47 Fed. Reg. 46850 (1982) (emphasis supplied).

<<<PAGE 7>>>

Jeffrey D. Wiese
Request for Reinterpretation: Reassessment Interval
March 20, 2009
Page 5 of7
Regulation (49 C.F.R.) Subject Original Compliance
Schedule
I 92.227( d)(l)' Welder requalification Requalify every twelve
months.
I 92.227(d)(2)b Welder qualification by destructive testing Destructive test every six
months.
I 92.705(b) Patrolling: Class I and Class 2 - highway and railroad crossings
Patrol every six months.
I 92.705(b) Patrolling: Class 3 and Class 4 - highway and railroad crossings
Patrol every three months.
192.705(b) Patrolling: Class 1 and Class 2 - general
Patrol every twelve months.
I 92.705(b) Patrolling: Class 3 - general Patrol every six months.
192.705(b) Patrolling: Class 4 - general Patrol every three months.
192.706 Leakage survey - general Survey every twelve months.
192.706(a) Leakage survey - no odorant in Class 3
Survey every six months.
192.706(b) Leakage survey - no odorant in Class 4
Survey every three months.
192.721(b)(I Y Patrolling: distribution mains Patrol every three months.
1 92.723(b)(l) Leakage survey - distribution systems
Survey every twelve months.
192.731(c) Inspection and testing: remote control shutdown devices Inspect and test every twelve
months.
192.739 Inspection and testing: pressure limiting and regulating stations Inspect and test every twelve
months.
Amended Compliance
Schedule
RequaJify within the
preceding 15 months, but at
least once each calendar year.
Destructive test within the
last seven and one-half
months, but at least twice
each calendar year.
Patrol within the last seven
and one-half months, but at
least twice each calendar
year.
Patrol within the last four and
one-half months, but at least
four times each calendar
year.
Patrol within the last 15
months, but at least once each
calendar year.
Patrol within the last seven
and one-half months, but at
least twice each calendar
year.
Patrol within the last four and
one-half months, but at least
four times each calendar
year.
Survey within the preceding
15 months, but at least once
each calendar year.
Survey within the last seven
and one-half months, but at
least twice each calendar
year.
Survey within the last four
and one-half months, but at
least four times each calendar
year.
Patrol within the last four and
one-half months, but at least
four times each calendar
year.
Survey within the preceding
15 months, but at least once
each calendar year.
Inspect and test within the
preceding 15 months, but at
least once each calendar year.
Inspect and test within the
preceding 15 months, but at
least once each calendar year.

<<<PAGE 8>>>

Jeffrey D. Wiese
Request for Reinterpretation: Reassessment Interval
March 20, 2009
Page 6 of7
Regulation (49 C.F.R.) Subject Original Compliance Schedule Amended Compliance
Schedule
192.743 Testing: relief devices Test every twelve months. Test within the preceding 15
months, but at least once each
calendar year.
192.745 Inspection and operation: transmission line valves Inspect and operate every twelve months. Inspect and operate within
the preceding IS months, but
at least once each calendar
year.
192.747 Inspection and servicing: distribution line valves Inspect and service every twelve months. Inspect and service within the
preceding IS months, but at
least once each calendar year.
192.749(a) Inspection: vaults housing pressure regulating or limiting
equipment
Inspect and service every twelve months. Inspect and service within the
preceding 15 months, but at
least once each calendar year.
Originally 192.227(c)(I).
Originally 192.227(c)(2).
Originally 192. 721 (b).
Finally, in the closely analogous area of external corrosion control, PHMSA regulations call for
re-evaluations "not less than every 3 years at intervals not exceeding 39 months.,,]7
INGAA asks only that PHMSA take the regulatory philosophy it adopted in all of these other
contexts and apply it to integrity assessment. 18
Please contact me, tboss@ingaa.org or (202) 216-5930, if you have any questions.
Respectfully submitted,
~~~
Terry D. Boss
Senior Vice President of
Environment, Safety and Operations
Dan Regan
Regulatory Attorney
Interstate Natural Gas Association of America
10 G Street, N.W., Suite 700
Washington, DC 20002
(202) 216-5900
17
18
49 C.F.R. § 192.465(e).
By some measures, the flexibility INGAA is requesting today is far more modest than that granted in these
other regulations. Consider the change associated with amending a regulation so a task that used to be
performed every three months can now be performed at intervals not exceeding four and one half months,
but at least four times per year. The maximum departure from the original schedule is 50% (three months
vs. four and one-half months). This letter is requesting a change from seven years to at most seven and
one-half years, a maximum departure of less than 8%.

<<<PAGE 9>>>

Jeffrey D. Wiese
Request for Reinterpretation: Reassessment Interval
March 20, 2009
Page 70f7
cc: James M. Pates
Assistant Chief Counsel
Pipeline Safety Law Division
Bill Gute
Deputy Associate Administrator
- **truncated:** false
- **body characters:** 21497