# Public Service Commission of Wisconsin — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-18-0007
- **title:** Public Service Commission of Wisconsin — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2018-09-27
- **effective on:** Not available
- **summary:** PI-18-0007 response to Public Service Commission of Wisconsin concerning 192.557, 192.619.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-18-0007.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-18-0007.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-18-0007
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/69306/wisconsin-psc-pi-18-0007-09-27-2018-part-192557-and-192619.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
ofTransportation
Pipeline and Hazardous Materials
Safety Administration
1200 New Jersey Avenue SE
Washington DC 20590
S E P 2 7 2018
Mr. Thomas M. Stemrich
Pipeline Safety Program Manager
Public Service Commission of Wisconsin
610 N. Whitney Way
P.O. Box 7854
Madison, WI 53707
Dear Mr. Stemrich:
In a March 7, 2018, letter to the Pipeline and Hazardous Materials Safety Administration
(PHMSA), you requested an interpretation of 49 Code of Federal Regulations (CFR) Part 192.
Specifically, you requested an interpretation to clarify if a pressure test (using natural gas as the
test medium) conducted for purpose of uprating maximum allowable operating pressure (MAOP)
in accordance with 49 CFR Part 192, subpart K could be a flowing gas test, or if the regulations
require a static pressure test. You expressed an opinion that the pressure test required under
§ 192.619(a)(2)(ii) should be a static pressure test that holds the pressure constant so that all
potentially hazardous leaks can be detected.
You stated that you have a case where an operator, Xcel Energy, is planning to uprate a steel
pipeline from an MAOP of 316 psig to 400 pounds per square inch gauge (psig)1 and provided
the following additional information:
• The operator would like to perform a flowing gas pressure test to 1.5 times the desired
MAOP (i.e., the test pressure would be 600 psig).
• The operator would raise the MAOP in four equal increments.
• The pressure would be held constant for one hour at each interval while a leak survey of the entire
system is conducted.
• Once the pressure reached 600 psig, a final leak survey would be conducted, and the pressure
would be allowed to drop to 400 psig through normal system load demand, or by flaring the gas.
• A follow-up leak survey would be conducted a week after the line had been running at 400 psig.
Through supplemental communication, you provided the following additional information:
• The pipeline was constructed in 1992.
• Most of the segment to be uprated is located in class 1 locations, but some portions are in
classes 2 and 3.
1 Xcel Energy requested similar interpretation but withdrew the request.
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations do not create legally-enforceable rights or obligations and are provided to
help the public understand how to comply with the regulations.

<<<PAGE 2>>>

2
o PHMSA comment: The proposed test pressure would need to be in compliance with
§ 192.619(a)(2) for class 3 pipe (1.5 times proposed MAOP).
• The maximum test pressure would be less than 30 percent of the pipe specified minimum
yield strength (SMYS).
o PHMSA comment: This would be in compliance with§ 192.503(c), although
PHMSA notes that any test pressure excursion above 30% of SMYS would not
comply with§ 192.503(c) and would not be allowed].
• You stated that the operator might not have pressure test records or complete material
records available to confirm the current MAOP of portions of the pipeline segment to be
uprated (therefore, there may be specific attributes that were not provided because they
are unknown).
For the circumstance described above, a number of conditions and requirements apply which
might preclude the use of a flowing gas test to uprate MAOP, depending on the circumstance.
The information provided is insufficient to make a definitive conclusion for the situation you
describe. Some of these requirements and potential impediments to the use of a flowing gas test
are discussed below. This is not an exhaustive list of requirements that might preclude use of a
flowing gas test.
For a steel pipeline operated at 100 psig or more and below 30% SMYS, the applicable technical
requirements of subpart Kare contained in§§ 192.553 and 192.557. Operators must follow all
requirements in§§ 192.553 and 192.557. In addition, pressure tests must comply with subpart J
and§ 192.619(a). With respect to the acceptability of a flowing gas pressure test to uprate
MAOP, PHMSA points out the following:
Limitation of §192.553(d)
Section 192.553(d) has a limitation on uprating. The uprated MAOP may not exceed the MAOP
that would be allowed under§§ 192.619 and 192.621 for a new segment of pipeline constructed
of the same materials in the same location. Thus, the operator would have to ensure that an
uprated MAOP does not exceed the lowest of the four pressures determined in accordance with
§192.619(a)(l), (a)(2), (a)(3), and (a)(4). The pressure test itself would satisfy paragraph (a)(2).
Paragraph (a)(3) is not applicable because the pipeline was constructed after 1970. Paragraph
(a)(4) could be satisfied by the review required in §192.557(b). Section 192.619(a)(l) would
require the following:
• However, for steel pipe in pipelines being uprated under subpart K, §192.553(d)
emphasizes that "if any variable necessary to determine the design pressure under the
design formula (§192.105) is unknown, the MAOP may be increased as provided in
§192.619(a)(l)." In accordance with §192.619(a)(l), if any variable necessary to
determine the design pressure of the weakest element in the segment ( determined in
accordance with subparts C and D) is unknown, 192.619(a)(l) requires that one of the
following be used as the design pressure:
(i) Eighty percent of the first test pressure that produces yield under section NS of
Appendix N of ASME B31.8 (incorporated by reference, see § 192. 7), reduced by
the appropriate factor in paragraph (a)(2)(ii) of this section; or
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations
(49 CFR Parts 190-199) in the fonn of interpretation letters. These letters reflect the agency's current application of the regulations to the
specific facts presented by the person requesting the clarification. Interpretations do not create legally-enforceable rights or obligations and
are provided to help the public understand how to comply with the regulations.

<<<PAGE 3>>>

3
(ii) If the pipe is 12¼ inches (324 mm) or less in outside diameter and is not tested
to yield under this paragraph, 200 p.s.i. (1379 kPa).
In order to uprate to a higher MAOP, the operator must know the pipeline material attributes
required in§§ 192.619(a)(l) and 192.105, including diameter, wall thickness, yield strength
(grade), seam type, and other component pressure ratings (valves, flanges and fittings). For the
circumstance described above in which some attributes are not known, a flowing gas test (which
is limited to 30% of SMYS in accordance with 192.503(c)) would not produce yield and would
be insufficient to establish the design pressure for pipe segments with unknown design
properties. A hydrostatic test to yield would be required (if the pipe is 12¼ inches or less in
outside diameter and is not tested to yield, the MAOP would be limited to no more than 200
psig).
In this circumstance (i.e., if any pressure containing material variables necessary to determine the
design pressure under the design formula (§ 192.105) are unknown), a flowing gas pressure test
could not be performed because§§ 192.105 and 192.503 requirements would not be verified to
uprate the MAOP of the segment with natural gas. If material records needed for MAOP
verification are not available, an operator would need to work with the appropriate 49 CFR Part
192 Regulating Agency to determine the required material verification activities and any
required special permit (waiver) actions needed to be performed prior to uprating this pipeline
segment.
Isolation of adjacent segments
Adjacent pipeline segments that are not being updated and/or have an MAOP less than the
maximum test pressure must be isolated from the segment being upgraded(§ 192.557(b)(5)).
Therefore, the operator may not continue to flow gas during the uprating process to a pipeline
segment operated at a lower pressure and with an MAOP lower than the maximum test pressure.
This requirement might preclude the use of a flowing gas test, depending on the circumstances
and the effect of isolating adjacent segments.
• In order to perform a flowing gas pressure test, the adjacent pipeline segment with the
lower pressure (MAOP) would either need to be isolated or protected by pressure-control
regulators and with overpressure control and mainline valves for shut-off to prevent over-
pressurization.
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations
(49 CFR Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the
specific facts presented by the person requesting the clarification. Interpretations do not create legally-enforceable rights or obligations and
are provided to help the public understand how to comply with the regulations.

<<<PAGE 4>>>

4
In addition, the operator must take appropriate safety measures to prevent any potential
hazardous situations should the line leak or fail during the test, including conducting all Code
required leak surveys and repairs. This is especially a concern for uprating segments where the
operator does not have the pressure test records available to confirm the current MAOP or the
pipeline material properties and component (fittings, flanges or valve) records to confirm the
design pressure of the pipelines' weakest link in accordance with§ 192.619(a)(l).
Ifwe can be of further assistance, please contact Tewabe Asebe at 202-366-5523.
Director, Office of Standards
and Rulemaking
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations
(49 CFR Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the
specific facts presented by the person requesting the clarification. Interpretations do not create legally-enforceable rights or obligations and
are provided to help the public understand how to comply with the regulations.

<<<PAGE 5>>>

Request for interpretation- Uprating pressure test.
Gentlemen,
We would like your interpretation regarding 192.619(a)(2)(ii) and 192.557. We have a case where an
operator is planning to uprate a steel pipeline from 316 to 400 psi. The majority of the line was
constructed in 1992. In order to meet class 3 design standards, the operator would like to raise the
MAOP of the pipeline from 316 to 400 PSIG in 4 equal increments to 600 psig (1.5 times the new MAOP).
Gas would be flowing to all the customers along the line in question, during this process. The pressure
would be held constant for one hour at each interval while a leak survey of the entire system is
conducted. Once the pressure has reached 600 psig a final leak survey would be conducted and the
pressure would be allowed to drop to 400 psig through normal system load demand, or by flaring the
gas. A follow-up leak survey would be conducted a week after the line had been running at 400 psig.
It is the contention of PSCW staff that the pressure test required under 192.619(a)(2)(ii) should be a
static pressure test that holds the pressure constant so that all potentially hazardous leaks can be
detected. Having gas flowing during the test, in our opinion, would not ensure the discovery of all
potentially hazardous leaks. We are also concerned that should the line fail during this test it could
create a hazardous situation, depending on where the failure would occur. It should also be noted that
the operator does not have the pressure test records available to confirm the current MAOP of portions
of the pipeline to be uprated.
We would appreciate your interpretation on this matter.
Thomas M Stemrich
Pipeline Safety Program Manager
Public Service Commission of Wisconsin