# On behalf of Philadelphia Gas Works Regulatory — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-22-0004
- **title:** On behalf of Philadelphia Gas Works Regulatory — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2022-05-12
- **effective on:** Not available
- **summary:** PI-22-0004 response to On behalf of Philadelphia Gas Works Regulatory concerning 199.1.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-22-0004.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-22-0004.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-22-0004
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/standards-rulemaking/pipeline/interpretations/76471/philadelphia-gas-works-pi-22-0004-5-12-2022-part1991.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
May 12, 2022
Joel L. Greene
Andrea I. Sarmentero Garzón
Jennings, Strouss & Salmon, PLC
1300 I Street, Suite 1120
Washington, D.C. 20005-3314
Dear Mr. Greene & Ms. Sarmentero Garzón:
In your February 1, 2022, letter to the Pipeline and Hazardous Materials Safety Administration
(PHMSA) you requested on behalf of Philadelphia Gas Works (PGW) an interpretation of the
Federal pipeline safety regulations in 49 CFR Part 199 with respect to whether employees in the
Planning Utility Drafter I (PUD I) position at PGW are subject to PHMSA/DOT drug and
alcohol (D&A) testing.
PHMSA promulgated the first drug testing regulations in 1988 wherein PHMSA required
pipeline operators to have an “anti-drug program for employees who perform certain sensitive
safety-related functions covered by the pipeline safety regulations.”1 While the original drug
testing rule did not define covered employee or covered function, it was explained in the
preamble that the drug testing regulations were limited to “those who perform regulated
operation, maintenance, or emergency-response functions…on existing pipelines.” 2
In other words, from the onset of the drug testing regulations in 1988, PHMSA has specified that
the functions performed by employees subject to the regulations are operations, maintenance,
and emergency-response functions subject to Parts 192, 193, and 195 that are performed on a
pipeline. Moreover, from the onset PHMSA specifically excluded the design function from
DOT drug testing 3 and drafters are generally involved in design.
We reviewed the PUD I position description you submitted and did not identify any functions
subjecting a PGW PUD I to PHMSA/DOT D&A testing. While the position does perform some
maintenance functions, the functions described are not performed on the pipeline, which is the
discriminator between maintenance functions that are D&A covered and maintenance functions
1 53 FR 47084.
2 53 FR 47089.
3 53 FR 47088
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations are not generally applicable, do not create legally-enforceable rights or
obligations, and are provided to help the specific requestor understand how to comply with the regulations.

<<<PAGE 2>>>

that are not D&A covered. Additionally, while the PUD I position description mentions
“potential emergency situations,” it does not list any specific emergency-response functions
regulated by Part 192 that are performed on a pipeline. As with operations and maintenance,
only those emergency-response functions performed on the pipeline are D&A covered functions,
regardless of whether the functions are listed in § 192.615.
We noted, however, that you added comments regarding PGW’s Winter Emergency Plan in your
letter explaining that the PUD I position is a source of personnel for the plan, but the duties
stated in that plan are not included in the PUD I position description PGW provided.
Nonetheless, you explain that with regards to the Winter Emergency Plan,
“PHMSA has clarified that persons who do a covered function even if infrequently or
who have a potential to do a covered function are subject to Part 199 drug testing.”
To support that statement, you referenced a guidance document published by PHMSA’s
predecessor agency the Research and Special Programs Administration (RSPA) in March 1994.
We must point out that the definition of “covered function” did not appear in the drug testing
subpart of Part 199 until March 1998, four years after the guidance document you referenced.
4
Furthermore, the current definition of “covered function” and the only definition of “performs a
covered function” did not appear in Part 199 until Amendment 199-19 (effective September 11,
2001)5, which was seven years after the RSPA guidance document. That RSPA guidance is no
longer available on PHMSA’s D&A website or through any other PHMSA source.
To clarify, Part 199 defines “performs a covered function” to include actually performing, ready
to perform, or immediately available to perform a covered function. While PHMSA has not
published guidance on the meaning of “ready to perform, or immediately available to perform”
these terms are included in the definition to dispel the notion that an employee has to be actually
performing a covered function to be a covered employee. For example, some operators believed
that a welder on a coffee break or off-duty was not a covered employee because he/she was not
actually welding at those times. The definitions of “performs a covered function” in § 199.3
clarifies that the welder need not necessarily be welding at all times to be a covered employee.
In summation, our review of the PUD I position description provided by PGW did not identify
the specific responsibilities necessary for this position to be subject to D&A testing under the
PHMSA regulations in Part 199.
4 63 FR 12998-13001
5 66 FR 47114 - 47119
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations are not generally applicable, do not create legally-enforceable rights or
obligations, and are provided to help the specific requestor understand how to comply with the regulations.

<<<PAGE 3>>>

Notwithstanding the above, nothing in Part 199 prohibits an employer from D&A testing any of
its employees using non-DOT procedures, including those employees already subject to D&A
testing under PHMSA regulations.
If we can be of further assistance, please contact Tewabe Asebe at 202-366-5523.
Sincerely,
John A. Gale
Director, Office of Standards
and Rulemaking
The Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety provides written clarifications of the Regulations (49 CFR
Parts 190-199) in the form of interpretation letters. These letters reflect the agency's current application of the regulations to the specific facts
presented by the person requesting the clarification. Interpretations are not generally applicable, do not create legally-enforceable rights or
obligations, and are provided to help the specific requestor understand how to comply with the regulations.

<<<PAGE 4>>>

Joel L. Greene
Andrea I. Sarmentero Garzón
Members, Energy
P 202.371.9889 | F 202.292.4740
jgreene@jsslaw.com
asarmentero@jsslaw.com
Jennings, Strouss & Salmon, P.L.C.
1300 I Street, NW - Suite 1120
Washington, D.C. 20005-3314
jsslaw.com
February 1, 2022
John A. Gale
Director, Office of Standards and Rulemaking
Office of Pipeline Safety (PHP-30)
Pipeline and Hazardous Materials Safety Administration (PHMSA)
US Department of Transportation
1200 New Jersey Avenue, SE
Washington, DC 20590-0001
Attn: Interpretations
Re: Request for Official Interpretation
Dear Mr. Gale:
We are writing on behalf of Philadelphia Gas Works (“PGW”) to request an official interpretation,
pursuant to 49 C.F.R. § 190.11, of the federal pipeline safety regulations in 49 CFR Part 199 with
respect to whether employees in the Planning Utility Drafter I position at PGW are subject to drug
and alcohol (“D&A”) testing.
I.
Background
PGW is a natural gas local distribution company (“LDC”) in the city of Philadelphia serving over
500,000 customers. It is also the operator of two (2) LNG facilities within Philadelphia. As an
operator of pipeline facilities subject to parts 192, 193 and 195 of Title 49, it tests covered
employees pursuant to the requirements of 49 C.F.R §199.1.
PHMSA’s D&A testing regulations, as codified in 49 C.F.R §199.1, provide in part:
§ 199.1 Scope.
This part requires operators of pipeline facilities subject to part 192, 193, or 195 of this chapter to
test covered employees for the presence of prohibited drugs and alcohol.
Further, § 199.3 specifies the meaning of “covered employee” and “covered function.”
§ 199.3 Definitions.
As used in this part –
Progressive culture. Innovative vision.

<<<PAGE 5>>>

February 1, 2022
Page 2
***
Covered employee, employee, or individual to be tested means a person who performs a covered
function, including persons employed by operators, contractors engaged by operators, and persons
employed by such contractors.
Covered function means any operations, maintenance, or emergency-response function regulated
by part 192, 193, or 195 of this chapter that is performed on a pipeline or on an LNG facility.
***
Performs a covered function includes actually performing, ready to perform, or immediately
available to perform a covered function.
This request for interpretation asks whether the employee position of Planning Utility Drafter I
(“PUD I”) at PGW is subject to coverage under Part 199. As demonstrated below, PGW believes
that the requirements of the PUD I position satisfy the operations, maintenance, or emergency-
response criteria for a “covered function” under §199.
II.
Job Title and Description of Duties – Planning Utility Drafter I
The PUD I is a senior level position in the Distribution Planning section of PGW that requires
skills to cover field drafting, estimating projects and senior drafting.1 The PUD I is responsible for
planning main extensions into new areas and new home developments, and the position may
involve daily site visits to various locations in all weather and potential emergency situations on a
24 hour, 7 day a week time frame depending upon the schedules of the field crews being covered.
This position involves field coverage where mains are being installed by construction crews, and
the PUD I makes pencil/future technology based field sketches showing make-up of mains in detail
for the purpose of updating all of the PGW detailed and general main pipeline maps. The PUD I’s
field sketch is the sole-source document, and the PUD I creates many of PGW’s operational
records (e.g., drip cards, valve cards, test station cards) and is responsible for maintaining these
files. The PUD I is responsible for creating PA One Call records of PGW’s pipelines associated
with construction projects. The PUD I can also act as backup to the Sr. Estimator and is required
to perform the duties of a PUD II and PUD III as needed.
Additionally, the PUD I performs other related duties as assigned. Most importantly, this includes
the PUD I’s performance of emergency response functions on PGW’s pipelines pursuant to PGW’s
Winter Emergency Plan, discussed herein below.
1 A complete copy of this job description (updated 10/2016 and including all essential functions), is attached hereto
as Appendix A.

<<<PAGE 6>>>

February 1, 2022
Page 3
III.
Request for Interpretation
Since the inception of mandatory drug testing in 1990, PGW, guided directly by the Office of
Pipeline Safety at the time, has determined that its PUD I position2 should be considered a safety
sensitive position and covered under PGW’s drug testing program in accordance with the
requirements of 49 C.F.R. Part 199.
This designation is based, in part, on PGW’s determination, reinforced by a discussion with Mr.
Cesar DeLeon, then Assistant Director for Regulation, Office of Pipeline Safety in March, 1990,
that because employees in this position develop the original field drawing which is used to
perpetuate the gas distribution mapping system, such draftsmen perform a covered operational
function and are subject to PHMSA drug testing. The PUD I creates many of PGW’s operational
records, including the field sketch, which is the sole-source document used for PGW’s general and
main maps. The PUD I also performs a maintenance function because he/she is responsible for
maintaining and updating, among other things, the critical infrastructure and pipeline maps in
PGW databases, including but not limited to pipeline running through PGW’s LNG facilities.
Accurate design and pipeline map maintenance is crucial in order to avoid issues such as over-
pressurization, which can lead to fatalities (e.g., the incident in Merrimack Valley).3 Furthermore,
the PUD I performs a covered maintenance function through the creation of PA One Call4 records
of PGW’s pipelines, the accuracy of which is important in order to avoid damage to PGW’s active
pipelines during construction.
Perhaps more critically, the PUD I position is a source of personnel in PGW’s Winter Emergency
Plan, which is an emergency plan prepared in accordance with 49 C.F.R. § 192.615. The
employees holding the position of PUD I have risen through the craft and service ranks and are
utilized to perform emergency-response functions on PGW’s pipelines and LNG facilities. During
various phases of PGW’s Winter Emergency Plan, a PUD I may be assigned to a crew in the
Distribution Department where the PUD I would be called upon to perform pipeline maintenance
functions such as, inter alia, addressing gas/fire emergencies, winter leak survey patrol, performing
new leak investigations, addressing underground street issues, performing service restorations, and
responding to repair orders. Additionally, a PUD I may be assigned to the Field Services
2 The PUD I position at PGW was formally known as the Senior Draftsman position at PGW.
3 It is PGW’s understanding that on September 13, 2018, excessive pressure in natural gas lines owned by Columbia
Gas of Massachusetts caused a series of explosions and fires to occur in as many as 40 homes, with over 80 individual
fires, in the towns of Lawrence, Andover, and North Andover, all within the Merrimack Valley, in Massachusetts.
One person was killed and 30,000 were forced to evacuate their homes immediately. It is PGW’s understanding that
the National Transportation Safety Board ultimately determined that the probable cause of the incident was weak
engineering management that did not adequately plan, review, sequence, and oversee the construction project that led
to the abandonment of a cast iron main without first relocating regulator sensing lines to the new polyethylene main.
4 Pennsylvania One Call System is a non-profit corporation created to protect underground facilities before anyone
begins to disturb the earth. PA One Call receives requests from excavators, contractors, plumbers, builders, designers,
and the general public to find out where underground lines are located. Pennsylvania One Call notifies member
underground facility owners of the intent to excavate. The facility owner then marks where their lines are located. Act
50 of 2017 authorizes the Pennsylvania Public Utility Commission to enforce provisions of the state’s Underground
Utility Line Protection Law, Act 287, also known as the “One Call Law.”

<<<PAGE 7>>>

February 1, 2022
Page 4
Department where the PUD I may be called upon to conduct street leak relief, which includes
using a combustible gas instrument to constantly monitor gas readings on active pipelines and
report any change to the leak readings to Field Operations for disposition and/or reclassification.
PHMSA has clarified that persons who do a covered function even if infrequently or who have a
potential to do a covered function are subject to Part 199 drug testing.5 Similarly, it is PGW’s
understanding that persons whose positions require them to potentially perform a covered function,
are subject to drug testing, even if the individual employee has not yet done a covered function.
Indeed, PHMSA has clarified that:
If an operator determines that an employee, who performs design or construction
functions, has other responsibilities which clearly relate to covered functions under
Part 192, 193, or 195, then that employee may be subject to drug testing. The
covered functions (operation, maintenance, or emergency-response) must take
place on the pipeline or at any LNG facility and the functions must be performed
by that individual in order to subject them to testing under Part 199.6
The example given by PHMSA is of a person an operator employs in a position responsible for an
emergency-response function who may not have to do the function until sometime in the future;
that person is nevertheless subject to each type of drug testing to assure that prohibited drugs do
not impair the person’s capacity to do the function should an emergency occur.7 Because of their
critical role that may affect the safety of the public or pipeline personnel, PGW determined, after
a careful review of 49 C.F.R Part 192, that the PUD I position is covered. See, 49 C.F.R. §192.615
(b).
Based on these facts, PGW respectfully requests that PHMSA provide an official interpretation of
its D&A testing regulations codified in 49 C.F.R Part 199, finding that PUD I employees working
at PGW are a “covered employee” subject to D&A testing because they perform functions that
are: (1) performed on a pipeline or LNG facility, (2) concerned with operations, maintenance or
emergency-response activities, and (3) regulated by Part 192, 193, or 195.
5 Guidelines for Implementing an Anti-Drug Program for Pipeline Personnel, Department of Transportation
Research and Special Programs Administration, at pp. 23-24 of Most Frequently Asked Drug Questions, issued
March 4, 1994.
6 Id. at pp. 17-18.
7 Id. at pp. 23-24.

<<<PAGE 8>>>

February 1, 2022
Page 5
Should you have any questions, or require any clarification, please contact the undersigned.
Very truly yours,
By: /s/
Joel L. Greene
Andrea I. Sarmentero Garzón
Jennings, Strouss & Salmon, PLC
1300 I Street, Suite 1120
Washington, D.C. 20005-3314
202-371-9889
202-370-4128
jgreene@jsslaw.com
asarmentero@jsslaw.com
Counsel to Philadelphia Gas Works
Enclosure
Cc: John Gale (John.Gale@dot.gov) and Tewabe Asebe (Tewabe.Asebe@dot.gov)

<<<PAGE 9>>>

APPENDIX A

<<<PAGE 10>>>

A senior level position in the Distribution Planning section that requires skills to cover field drafting, estimating
projects and senior drafting. It could involve daily site visits to various locations in all weather and potential
emergency situations on a 24 hour, 7 day a week timeframe depending upon the schedules of the field crews
being covered. This position involves coverage where mains are being installed by construction crews and the
Planning Utility Drafter I makes pencil/future technology based field sketches showing make-up of mains in
detail for presentation to higher level employees for the purpose of entering and updating all of the PGW
detailed and general main maps.
Requires the preparation of estimates and design for the installation of mains and services, including meters,
regulators and related equipment for customers requesting gas service up to 20,000 CH through single
service. Can also act as backup to the Sr. Estimator if needed and if the work load permits. Develops a
previously selected main route; chooses the locations for proposed large mains, valves and pressure
regulating stations within this route; and prepares the construction drawings for such installations. These
customers may be in any classification including commercial, industrial major and residential. Estimates and
designs these installations in an economical manner taking into consideration safety, efficient delivery of the
product and the present and potential use of the installation. Estimates and Designs installation considering
the minimizing of future maintenance problems. These installations may be required to supply new
customers, provide for the increased demands of existing customers, relocation of facilities of existing
customers.
Set up construction drawings for drafters, send and receive PA 1 Call tickets, handle file exchange from
ftp and other internet web sites, maintain various databases, maintain drawing archives, ensure updated
maps are current in Dispatch Area, provide printing and scanning, maintain printer/scanning equipment
and software at multiple locations, and handle printing and scanning requests from various internal
departments and outside agencies.
Responsible to enter construction drawing information into GPIS, apply for Highway Openings, Lane Closures
and ADA Ramp permits in GPIS, as well as apply for PennDOT permits. Responsible for the creation of AIMS
orders and preparing AIMS orders to be dispatched to Construction. Assists in requesting police and
documenting the applications. Assist in documenting and processing invoices.
This position requires senior drafting skills and the ability to complete all drawings assigned as well as
Planner Utility Drafter I and Ill requirements, if and when needed.
Works in all inclement weather and construction hazard conditions.
ESSENTIAL FUNCTIONS
• Must have a thorough knowledge of PGW policies in regard to main, service, regulator, meter, metering
related equipment and other system installations as these matters must be discussed with the customer
so that designs and subsequent installation are compliant with PGW, City, State and Federal
regulations.
• Must have the ability to complete all required PGW drafting needs.
• Locates the main and its various fittings to reference points
• Ability to make clear, free-hand sketches using approved symbols and lettering, and also ability to use
ingenuity and good judgment in the selection of reference points.
Planning Drafter I (Updated: 10/2016)

<<<PAGE 11>>>

substantiates and vermes as lald quantities or piping laid on tinal contract reports against the Field
Draftsman, Planning Utility Drafters report and reviews the same with the Area Supervisor.
• Interprets contour and survey maps in order to plan for main extensions into new areas. Must have an
understanding of building plans in order to discuss details of service installation with architects,
engineers or builders. Observes and considers surface conditions, such as, manholes, vent boxes,
utility markings or pavement disturbance that could influence choice of locations for the proposed main
or service.
• Develops drawings for special supports for gas mains, brackets for mains crossing bridges, and
retaining clamps for joints and drips.
• Selection of route and location of mains, valves, pressure regulating stations and manholes.
• Must have a working knowledge of street main instructions, contract instructions, work order
authorizations, job numbers, service and special job instructions and departmental account numbers.
• Makes preliminary sketch and bills of material with specifications.
Estimates and designs mains for new home developments as may be required from trunk mains
developed by Network Analysis group. Prepares sketches electronically so that it may be presented on
existing plans created by others or generated on detail main maps or general main maps. Creates
Main and Service Estimates of cost of installations using PGW provided PC software.
Designs special shapes and structures for supporting or carrying gas mains.
• Designs and draws
more complicated section of large main jobs, regulating and metering stations,
valves and manholes.
• Checks the following Planning Utility Drafters reports and records for accuracy and completeness: final
sketch records, daily progress report, daily progress report check sheet, valve records, drip records,
corrosion control records, bridge inspection records and miscellaneous records and submits to the
Supervisor of Drafting to maintain monthly report.
• Locates the main and its various fittings to reference points
• Ability to make clear, free-hand sketches using approved symbols and lettering, and also ability to use
ingenuity and good judgment in the selection of reference points.
• Draws permanent main records electronically from field sketches using various drawing programs.
• Originates various reports covering assigned territories such as the main work daily progress report,
and other record cards used in operation and maintenance of drips, valves, corrosion control
installations, bridge mains and large (3" and over) services.
• Assembles and verifies field sketches made out of hours by Distribution street personnel.
• Responsible to lay out special construction work in the field, as well as the normal duties of a
draftsman.
• Directs, advises and trains Planning Utility Drafter I and III on construction drawings, maps, main
records and estimates up to 8" and smaller mains and services, including meters, regulators and
related equipment for customers requesting gas service up to 20,000 CFH through single service
• Checks final drawings and makes final bill of materials.
• Directs the transfer work involved from field sketch to finished map
• Revises and draws new maps as needed in the distribution system and keeps the records of their
distribution.
• Meets contractors to settle construction problems, such as gas mains on bridges, highways and sewer
Planning Drafter I (Updated: 10/2016)

<<<PAGE 12>>>

Dras and her Planning uny Drate paine real.
and removals of mains and services, and updating the corrosion C.P. systems.
• Responsible for researching and correcting all discrepancies found on all of the above maps, all
changes done out of hours or unreported through Field Drafting
• Researches field sketches for previously installed main and service of any age, and abandoned
structures for Planning section, Distribution Department and outside contractors when conflicts occur.
• Creates a pdf of all updated Detail Main maps twice a month; which are then forwarded to appropriate
personnel.
• Must have thorough knowledge of the supporting records such as Service Records, Main Repair
Records, Broken Main Records, and Drip Records.
• Must be completely familiar with the interpretation of survey and contour maps, and develop maps
used in the operation of the distribution system, also known as 6X drawings.
• Directs the operation of reproduction machines; has a working knowledge of the pipe locator and is
proficient in the use if the transit and level.
• Makes sketches and prepares cost estimates for such work, working from standard costs but allowing
for variations in underground structures, soil conditions, traffic, etc. Prepares these documents using
CAD and other company supplied computer software programs. Designs services using PGW
approved gas flow equations software, which may reside on various media including PC's to determine
what size service pipe is needed. Required to input all job related data into an Excel based or AIMS
program to electronically generate an estimate.
• Plans mains for new home developments as may be required from trunk mains developed by Network
Analysis group. Prepares sketches electronically so that it may be presented on existing plans created
by others or generated on detail
Estimates of cost of installations using PGW provided PC software.
ators using PoW provided PC Sofivar maps. Creales Main and Service
• Estimates and designs 8" or smaller "ahead of paving" mains and assists in planning other 'ahead of
paving" mains. This at times requires contacts with PGW Sales personnel, engineers,
developers, builders and their agents, survey office personnel and others to develop information. Write
statement supporting need for the work. Attends pre-design, design and/or site meetings with
developers, builders, Marketing, FSD, Collections and other utility representatives to determine main
and service locations, outdoor meter set locations and to solve issues associated with supplying gas to
one or several facilities up to 20,000 CFH through a single service.
• Develops and prepares detailed, to scale sketches of mains and services using any and all PGW
supplied computer aided drafting (CAD) programs for new and existing facilities as required to complete
for the creation of construction work orders.
Results of the flow computations must be included as
required by PGW policy to enable decisions to be made on proposed designs.
• Requires having sufficient knowledge and aptitude to associate conditions with possible corrosion
problems to enable corrosion protection precautions to be devised if necessary.
• Assists Senior Estimators and other Planning Utility Drafters in the processing of estimates.
• Studies and makes recommendations on mains proposed for abandonment.
• Plans and carries out special assignments, some of which are non-repetitive in character.
• If previously titled, or after being trained, performs Field Drafting duties as assigned. Demonstrate
Planning Drafter I (Updated: 10/2016)

<<<PAGE 13>>>

1 Call to other utilities and outside vendors as well as to update various title blocks in construction
drawings
• Perform printing and scanning using the Oce 300, 600 and 2236: ScanPro 1000 and other various
printing equipment. This task includes maintaining and troubleshooting the equipment, ordering
supplies, (paper and ink) using Oracle, verifying printer usage monthly by checking meter reads,
ensuring backup paper copies of DMM and GMM are updated monthly with the latest changes
(dispatch/planning areas) and Utilizing ScanPro 1000 for microfilm and aperture cards to scan and save
as PDFs in associated job folders
• Maintain FTP site and exchange files with vendors for various departments
• Assist other departments with printing and archive retrieval of old drawings, work orders, job numbers,
bill of materials, sketches and account numbers.
• Archives drawings and sketches and researches previous archives (as needed)
• Blue maps updates at Dispatching map table {bi-monthly)
• GMM Books (as needed)
• Inspector Area Maps (as needed)
• Creates CD's for various bid contracts (as needed)
• Train Personnel on setting up electronic folders and ERV (PWD Website)
• Use ERV for Sewer Water Plans and Highway Plans
• Maintain Engineering Key Library
• Enter construction drawing information into GPIS - including application of Highway Opening, Lane
Closures and ADA Ramp permits which includes creating new applications if there is no existing project
application in GPIS, entering GPIS application names, project information and estimated phase dates,
adding and deleting street location/intersections, updating start and end dates for each phase, adding
PA One Call Design number into each street location, referencing drawing details
to add
footway/roadway locations, segments and offsets, requesting permit approval from other utilities and
the city of Philadelphia Streets Department and receiving and reviewing external GPIS clearance
requests, applications/plans, and entering comments
as outlined in the Company policies and
procedures.
• Applying for PennDOT permits which includes creating new application, adding attachments, adding
work summary and locations, completing application identification, adding fee information, reviewing
application summary, submitting applications, saving a copy of the application to the permit drawing
folder, updating the tracking spreadsheet, PennDOT notification and issuing of the permit
• Responsible for the creation of AIMS orders and preparing AIMS orders to be dispatched to
Construction. Assists in requesting police and documenting the applications
• Request police, document application and assist in billing.
• Assist in documenting and processing various invoice types
• Performs other related duties as assigned.
• Must have regular and acceptable attendance
EDUCATION & EXPERIENCE QUALIFICATIONS
• HS Education
Planning Drafter I (Updated: 10/2016)

<<<PAGE 14>>>

Planning Drafter I (Updated: 10/2016)

<<<PAGE 15>>>

Supervisor Drafting Services
Planning Utility Drafters I, II, II, Senior Estimators and
Senior Field Drafters
THIS JOB
POSITIONS REPORTING TO THIS POSITION
None
Planning Drafter I (Updated: 10/2016)

<<<PAGE 16>>>

• Sedentary work - Exerting up to 10 pounds of force occasionally, and/or a negligible amount of force frequently or constantly to lift,
carry, push, pull or otherwise move objects, including the human body. Sedentary work involves sitting most of the time. Jobs are
sedentary if walking and standing are required only occasionally, and all other sedentary criteria are met.
• Light work - Exerting up to 20 pounds of force frequently, and/or a negligible amount of force constantly to move objects. If the use of
arm and/or leg control requires exertion of forces greater than that of sedentary work and if the worker sits most of the time, the job is
considered light work.
X Medium work - Exerting up to 50 pounds of force occasionally, and/or up to 20 pounds of force frequently, and/or up to 10 pounds of
force constantly to move objects.
• Heavy work - Exerting up to 100 pounds of force occasionally, and/or up to 50 pounds or force frequently, and/or up to 20 pounds of
force constantly to move objects.
• Very heavy work - Exerting in excess of 100 pounds of force occasionally, and/or in excess of 50 pounds of force constantly to move
objects.
SPECIFIC WORK REQUIREMENTS:
Utilizing the "Key" below, check appropriate boxes for each requirement category as it pertains to performing the essential
functions of the attached position.
Key:
C = Constantly 75% or more of an average workday
F = Frequently 50% to 75% of an average workday
O = Occasionally 25% to 50% of an average workday
R= Rarely less than 25% of an average workday
F
R
WORKING ENVIRONMENT DESCRIPTIONS
Indoor Work: Performs duties subject to inside environmental conditions protected from weather but not
necessarily from temperature changes.
Weather Work: Performs duies subject to ulside environmental conditions with no effective protection from
x
Extreme Temperatures: Performs work activities at temperatures below 32 degrees or above 100 degrees for
periods of more than one hour, this includes such factors as the affects of wind and humidity
x
Noise: There is sufficient noise to cause the worker to shout in order to be heard above the noise level and/or
affect hearing ability.
x
Vibration: There is sufficient exposure to oscillating movements of the extremities or whole body.
Hazards: Exposed to one or more hazards such as moving mechanical parts, moving vehicles, electrical
current, high places, high heat, chemicals, etc.
Atmospheric Conditions: Exposed to one or more conditions that affect the respiratory system such as fumes,
odors, dusts, mists, gases, poor ventilation, etc
Planning Drafter I (Updated: 10/2016)

<<<PAGE 17>>>

X
Crawling: Moving about on hands and knees or hands and feet.
Light Carrying/Lifting: Physically transporting items weighing less than 15 pounds from one location to
another
Moderate Carrying/Lifting: Items weighing 15 to 44 pounds
Heavy Carrying/Lifting: Items weighing 45 pounds and over
Fingering: Picking, pinching, typing, or otherwise working primarily with fingers rather than with the whole hand
or arm
Grasping: Applying pressure to an object with fingers (including thumb) and palm
Kneeling: Bending legs at knees to come to rest on one or both knees
X
Light Lifting: Raising objects under 15 pounds from a lower to a higher position or moving objects horizontally
from one position to another
Moderate Lifting: Objects 15 - 44 pounds
X
Heavy Lifting: Objects 45 pounds and over
Pulling Hand over Hand: Using upper extremities to exert force in order to draw, drag, haul, or tug objects in a
sustained motion
X
Pushing: Using upper extremities to press against something with steady force in order to thrust forward,
downward, or upward
Reaching above shoulder: Extending hand(s) and arms) in any direction
Repetitive motion: Substantial movements of the wrists, hands, and/or fingers for sustained periods of time
Sitting: Particularly for sustained periods of time
Standing: Particularly for sustained periods of time
x
Walking: Moving about on foot, particularly for long distances.
Hearing: Utilizes hearing to perform one or more of the following: use communication equipment, detect
specific noises, proper equipment operation, understand what clients are saying in normal conversation
Planning Drafter I (Updated: 10/2016)

<<<PAGE 18>>>

assignment or general observations of facilities/structures (i.e. custodial, inspection, security guard, laborer)
C
F
R
COMPREHENSION
Ability to understand, remember, and apply oral and/or written instructions or other information
Ability to understand, remember, and communicate routine, factual information
Ability to understand complex problems and to collaborate and explore alternative solutions
Ability to understand opposing viewpoints highly complex issues and to negotiate/integrate different viewpoints
C
F
R
ORGANIZATION
X
Ability to organize thoughts and ideas into understandable terminology
Ability to organize and prioritize own work schedule on short-term basis (longer than one month)
Ability to organize and prioritize work schedules of others on short-term basis
X
Ability to organize and prioritize work schedules of others on long-term basis
C
F
R
REASONING and DECISION MAKING
X
Ability to apply common sense in performing job
x
Ability to make decisions which have moderate impact on immediate work unit
Ability to make decisions of significant impact on the immediate work unit & moderate impact outside work unit
Ability to make decisions which have significant impact on the department's credibility, operations, and services
C
F
R
COMMUNICATION
Ability to understand and follow basic instructions and guidelines
Ability to complete routine forms, use existing form letters and/or conduct routine oral communication
Ability to compose letters, outlines, memos, basic reports and/or to orally communicate technical information
x
Ability to communicate with individuals utilizing a telephone; requires ability to hear & speak effectively on phone
x
Ability to express or exchange ideas by means of the spoken word, communicating orally with others accurately,
loudly, and quickly
x
Ability to make informal presentations speaking before groups inside and/or outside the organization
x
Ability to compose materials such as detailed reports, work-related manuals, publications of limited scope or
impact, etc., and/or to make presentations outside the immediate work area
x
Ability to formulate complex and comprehensive materials such as legal documents, authoritative reports, official
publications of major scope and impact, etc., and/or to make formal presentations
Planning Drafter I (Updated: 10/2016)

<<<PAGE 19>>>

C F 0 R MATHEMATICS
X No mathematical ability is required
X Ability to count accurately
X Ability to add, subtract, multiply, divide and to record, balance, and check results for accuracy
X Ability to compute, analyze, and interpret numerical data for reporting purposes
X Ability to compute, analyze, and interpret complex statistical data and/or to develop forecasts and computer
models
EQUIPMENT/ DEVICE OPERATION: Check All that Apply
COMPUTER SOFTWARE VEHICLES □ Microsoft Office 0 Bicycle X Outlook X Standard Passenger Vehicle (Coupe, □ ADP Sedan, Light SUV, Minivan, etc.) □ Oracle 0 TrucksNans (Pick-up, CDL, Cargo Van, □ Visio etc.) □ SCCS 0 Skilled Trade Vehicles (Excavator, Front X AIMS End Loader, Crane, Towed Compressor, □ Forklift, etc.) Goldmine 0 Other, (describe below) □ Other, (describe below) Gas Calc AutoCAD
Google Earth
Adobe PRO
HEAVY EQUIPMENT/TOOLS
□ Construction Equipment (Jackhammers,
excavation hand tools, shovels, bars,
rakes, levels, etc.)
□ Welding Tools (AC/DC welders, Arc
welders, Welding machines
X Drafting Tools (CAD, drafting machines,
hand compass, dividers, protractors, etc.)
□ Natural Gas Equipment (compressors,
scrubbers, evaporators, refrigeration
equipment, etc.)
□ Other, (describe below)
APPROVALS:
Union Representative Printed Name & Title
Union Representative's Signature Date

- **truncated:** true
- **body characters:** 40166