{"operation":"document","citation":"PI-23-0014","title":"Murchison Law Firm, PLLC — Pipeline Safety Interpretation","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"2025-07-21","effective_on":null,"summary":"PI-23-0014 response to Murchison Law Firm, PLLC concerning 195.0.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-23-0014.json","markdown":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-23-0014.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-23-0014","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2025-10/US-Venture-PI-23-0014-Withdrawal-with-Signature.pdf","body":"<<<PAGE 1>>>\n\nU.S. Department\nof Transportation\nPipeline and Hazardous\nMaterials Safety\nAdministration\n1200 New Jersey Avenue, SE\nWashington, DC 20590\nJuly 21, 2025\nMr. Vince Murchison\nMurchison Law Firm, PLLC\n325 North St. Paul Street\nSuite 2700\nDallas, TX 75201\nRe.: Withdrawal of Interpretation Letter PI-23-0014\nDear Mr. Murchison:\nOn June 10, 2024, PHMSA responded to your request for an interpretation of the Federal\npipeline safety regulations relating to the applicability of 49 CFR Part 195 to certain facilities in\nthe Green Bay area owned and operated by U.S. Venture, Inc. This letter is to inform you that\nPHMSA has withdrawn that response to further consider the matter. PHMSA will provide\nfurther information upon completion of its review. Until the review is complete, PHMSA does\nnot intend to conduct Part 195 compliance inspections of the facilities in question.\nIf we can be of further assistance, please contact Joseph Berry at 720-601-3577.\nSincerely,\nJohn A. Gale\nDirector, Office of\nStandards and Rulemaking","truncated":false,"body_characters":1030}