# Murchison Law Firm, PLLC — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-23-0014
- **title:** Murchison Law Firm, PLLC — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 2025-07-21
- **effective on:** Not available
- **summary:** PI-23-0014 response to Murchison Law Firm, PLLC concerning 195.0.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-23-0014.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-23-0014.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-23-0014
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2025-10/US-Venture-PI-23-0014-Withdrawal-with-Signature.pdf
**body:**

<<<PAGE 1>>>

U.S. Department
of Transportation
Pipeline and Hazardous
Materials Safety
Administration
1200 New Jersey Avenue, SE
Washington, DC 20590
July 21, 2025
Mr. Vince Murchison
Murchison Law Firm, PLLC
325 North St. Paul Street
Suite 2700
Dallas, TX 75201
Re.: Withdrawal of Interpretation Letter PI-23-0014
Dear Mr. Murchison:
On June 10, 2024, PHMSA responded to your request for an interpretation of the Federal
pipeline safety regulations relating to the applicability of 49 CFR Part 195 to certain facilities in
the Green Bay area owned and operated by U.S. Venture, Inc. This letter is to inform you that
PHMSA has withdrawn that response to further consider the matter. PHMSA will provide
further information upon completion of its review. Until the review is complete, PHMSA does
not intend to conduct Part 195 compliance inspections of the facilities in question.
If we can be of further assistance, please contact Joseph Berry at 720-601-3577.
Sincerely,
John A. Gale
Director, Office of
Standards and Rulemaking
- **truncated:** false
- **body characters:** 1030
