{"operation":"document","citation":"PI-71-0100","title":"Pennsylvania &amp; Southern Gas Co. — Pipeline Safety Interpretation","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"1971-01-07","effective_on":null,"summary":"PI-71-0100 response to Pennsylvania &amp; Southern Gas Co. concerning 191.7.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-71-0100.json","markdown":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-71-0100.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-71-0100","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1971/g71-01-07_Lohmann_191.7-lmx.pdf","body":"<<<PAGE 1>>>\n\nPI-71-0100\nJanuary 7, 1971\nMr. E. L. Lohmann\nVice Presidnet\nPennsylvania & Southern Gas Co.\n103 S. Elmer Avenue\nSayre, PA. 18840\nDear Mr. Lohmann:\nThe interpretation you have made of 49 CFR, Section 191.11 is correct. Lines operating at or over 20% SMYS\nmust be reported on Form F 7100.1-1.\nYou are also correct in that you must report each of your four systems separately as covered in 49 CFR, Section\n191.7.\nAs requested, 30 copies of each form and four copies of each of the instructions are enclosed.\nThank you for your interest in the pipeline safety program.\nSincerely,\nSIGNED\nJoseph C. Caldwell\nActing Director\nOffice of Pipeline Safety\n\n<<<PAGE 2>>>\n\nPennsylvania & Southern Gas Company\n103 So. Elmer Avenue\nP.O. Box 188\nSayre, Pennsylvania 18840\nDecember 22, 1970\nMr. Joseph C. Caldwell, Deputy Director\nOffice of Pipeline Safety\nDepartment of Transportation\nWashington, D. C. 20590\nRe: Part 191 - Reports of Leaks\nDear Mr. Caldwell:\nWe received today the following items from your office:\n1 copy - Instructions for Completing DOT Form F 7100.1-1\n1 copy - Instructions for Completing DOT Form F 7100.2-1\n1 copy - Form F 7100.2-1\nThere was no copy of form F 7100.1-1 included. We assume that this form was missed in the mailing.\nOur Company is basically in gas distribution. We have, however, some lines operating over 20% of\nSMYS. Our interpretation of Part 191.11 is that we must report on both forms. We also operate in four\ndifferent states, namely New York, Pennsylvania, Maryland and North Carolina. We assume that we must\nreport each system separately either to the respective state or to your office. Please advise.\nA supply of 30 of each of these forms and 4 copies of each of the instruction sheets would be greatly\nappreciated.\nThank you.\nVery truly yours,\nPennsylvania & Southern Gas Company\nE.L. Lohmann, Vice President","truncated":false,"body_characters":1854}