# Baltimore Gas & Electric Company — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-71-086
- **title:** Baltimore Gas & Electric Company — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1971-12-14
- **effective on:** Not available
- **summary:** PI-71-086 response to Baltimore Gas & Electric Company concerning 192.59.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-71-086.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-71-086.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-71-086
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1971/PI71086.pdf
**body:**

<<<PAGE 1>>>

Mr. B. C. Trueschler
Vice President
Baltimore Gas & Electric Company
Gas & Electric Building
Baltimore, Maryland 21203
Dear Mr. Trueschler:
This is in further reply to your letter of September 30, 1971, requesting an interpretation of the
corrosion control regulations as they apply to the use of the Bonded Products Epi-Seal process.
We have considered your letter and we find that the process does not meet the requirements of
§192.59(a)(1) for plastic pipe. For that reason, we cannon accept the Bonded Products Epi-Seal
process of internal lining as equivalent to plastic insert pipe. It will, therefore, be necessary to
comply with the corrosion regulations for ferrous pipe.
In the event you are not in accord with this determination, you may petition for a waiver from the
applicable requirements in Subpart I to permit the use of steel pipe in which the plastic lining
materials is used. Your petition should include detailed justification in support of your position.
A public hearing will be held in the event that you petition for a waiver, and we will appreciate
your advice regarding acceptable dates.
Sincerely,
/signed/
Joseph C. Caldwell
Acting Director
Office of Pipeline Safety
DB
C:\WP51\INTERPRT\192\59\71-12-14
1
- **truncated:** false
- **body characters:** 1247
