- **summary:** PI-72-011 response to Wisconsin Public Service Commission concerning 192.465.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-72-011.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-72-011.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-72-011
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1972/PI72011.pdf
**body:**

<<<PAGE 1>>>

March 3, 1972
Mr. R. E. Purucker
Chief Engineer
Wisconsin Public Service Commission
Mill Farms State Office Building
Madison, Wisconsin 53702
Dear Mr. Purucker:
This will acknowledge receipt of your letter of January 5, 1972, and the accompanying letter of
December 15, 1971, from the Wisconsin Utilities Association.
The request by the Wisconsin Utilities Association that an alternative to the provisions of
Paragraph 192.465(a) be made available to utilities operating within the jurisdiction of the
Wisconsin Public Service Commission would be in the nature of a change to the Federal safety
standards for your State. A change to the Federal safety standards can be made only by the Office
of Pipeline Safety. This does not preclude the Wisconsin Public Service Commission from
adopting for intrastate pipeline systems additional, or more stringent standards, which are not
incompatible with the Federal standards.
We have considered the alternative to Paragraph 192.465(a) that the Wisconsin Utilities
Association proposed and feel that it would be detrimental to public safety. We feel that
Paragraph 192.465(a) is concerned with measures that should be taken to prevent leaks while the
alternative proposed would only detect leaks instead of preventing them.
We hope that this answers your question. If we can be of further assistance, please let us know.
Sincerely,
Joseph C. Caldwell
Acting Director
Office of Pipeline Safety
dal\192\465\72-03-03
1

<<<PAGE 2>>>

State of Wisconsin \ PUBLIC SERVICE COMMISSION
January 5, 1972
Office of Pipeline Safety
Department of Transportation
400 Sixth Street SW
Washington, D.C. 20590
Gentlemen:
Enclosed in duplicate is a request by representatives of Wisconsin distribution utilities
regarding section 192.465(a) of the Minimum Federal Safety Standard. We have adopted as a
state standard the existing wording of section 192.465(a) but because the request of the utilities is
general in nature there is a question as to whether or not this Commission, as a state regulatory
body operating under a 5(a) certificate, has the necessary authority to grant or deny such a
request. If it is your position that this Commission does have the necessary authority to deal with
the request, please so inform us. If it is your position that this Commission does not have the
necessary authority, we would like to add the following comments.
We feel the position of the Wisconsin utilities is well-founded and support the request. At
this time, however, we would not support a general change of the rule to apply to the industry as
a whole but only as such a change would pertain to the distribution utilities operating in the state
of Wisconsin. Our support is based primarily on our leak survey requirements (PSC 192.723;
copy attached to utilities' letter), which in almost all cases are carried out by the use of mobile
flame ionization leak detection units. Most of the surveys performed are done with operator-
owned equipment. In some cases the operators are actually covering their systems more often
than that required by our rules. In addition, we are requiring under section PSC 192.457(d) (copy
attached to utilities' letter) all operators to cathodically protect all effectively coated steel
distribution pipelines by August 1, 1975. This requirement will apply to short sections. Under
such circumstances because of the applicability of the present wording of section 192.465(a) our
operators would be required to survey many more short sections of main than would presently be
required.
dal\192\465\72-03-03
2

<<<PAGE 3>>>

We feel the request is reasonable, will not reduce pipeline safety, and will be in the best
interests of the public.
Very truly yours,
R.E. Purucker
Chief Engineer
Enclosures
dal\192\465\72-03-03
3

<<<PAGE 4>>>

WISCONSIN UTILITIES ASSOCIATION
Wisconsin Gas Company
626 E. Wisconsin Avenue
Milwaukee, Wisconsin 53201
414 276-6720, extension 608
December 15, 1971
AIR MAIL
Director
Office of Pipeline Safety Department of Transportation
400 Sixth Street SW
Washington, D.C. 20590
Dear Sir:
The Gas Codes Task Force responsible to the Executive Committee of the Wisconsin Utilities
Association has carefully reviewed the provision of sub-part I of Part 192 Minimum Federal
Safety Standards, and offers the following comments and request relative to Section 192.465(a)
regarding requirements for monitoring the level of cathodic protection.
The requirement of testing at least 10% of isolated protected structures with a different 10%
checked each succeeding year, the entire system thereby being covered in a ten-year period, is one
which will impose an undue operating cost upon our customers that is not commensurate with the
potential benefits to be achieved. We invite your consideration of the status of (1) short main
sections, and (2) isolated steel service risers in systems operated by utilities subject to the
jurisdiction of the Public Service Commission of Wisconsin as follows:
(1) Short Main Sections
We recognize the desirability of testing to determine the adequacy of protection on
sections of piping falling within the scope of this paragraph. We feel, however,
that the practicality of monitoring the level of cathodic protection on the thousands
of short sections of mains, many of which are used for transition sections between
plastic and metal or between plastic systems and as jumper connections and loops,
is not commensurate with the need. We are convinced that these short sections of
pipe which have been coated and cathodically protected will remain under such
dal\192\465\72-03-03
4

<<<PAGE 5>>>

protection. To maintain either test wire stations, install such stations where not
now existing, or to contact the pipe from the surface through a barhole on the
premise that such surveillance would possibly reveal a structure which had lost
protection and in which a leak could conceivably develop, would be more
expensive and cause more disruption to public and private property than is
warranted.
You are undoubtedly aware that the Public Service Commission of Wisconsin,
having adopted and administered a gas safety code since 1952, has incorporated its
requirements as Chapter PSC 135 of the Wisconsin Administrative Code. On
december 13, 1971, the Commission held a public hearing in Madison, Wisconsin
for the purpose of adopting a new Chapter PSC 135 which would include the
Federal Minimum Safety Standards and such other additional requirements deemed
appropriate. One of these additional requirements, which had previously been in
effect as paragraph 852.2 will be retained in the consolidated code and will be
redesignated as PSC 192.723 (d).
The provisions of paragraph PSC 192.723 (d) (copy attached) are significant to
this discussion in that these extensive requirements for leakage surveys provide a
realistic and effective means of detecting any potentially hazardous situation
resulting from the loss of cathodic protection in isolated structures. The mobile
flame ionization and infrared units cited in PSC 192.723 (d) exhibit exceptional
sensitivity, capable as they are of detecting and indicating the presence of as little
as 100 parts per million (.01%) of gas in air in the case of the infrared and 5 parts
per million (.0005%) in the case of the flame ionization instruments. These levels
of sensitivity are 1/400 and 1/8,000 respectively, of the lowest concentrations at
which an explosive mixture of gas in air would exist.
We are convinced that, with the availability of these detection units, the systematic
surveys of mains that are required by the Wisconsin code provide a more
comprehensive and more frequent coverage of short main sections than does the
sampling approach required by 192.465(a). In the unlikely event that the
combination of remote possibilities leading to a leak in a cathodically protected
structure actually did occur, the situation would be recognized much more
promptly as a result of annual leakage surveys than as a result of the 10%
monitoring provision.
Further, one of the additional requirements that the Wisconsin Public Service
Commission will incorporate in its current code writing action will make it
mandatory that all existing coated steel mains and services be brought under
cathodic protection, whether or not active corrosion is taking place. A copy of the
proposed language (PSC 192.457(d)) is attached.
dal\192\465\72-03-03
5

<<<PAGE 6>>>

(2) Isolated Steel Service Risers
Under the provisions of Chapter PSC 134.30(1) (copy attached) it is necessary
that each gas utility schedule a service crew to enter the premises of customers at
least once every twelve years to remove, inspect, and adjust or repair the
customer's gas meter. It would be reasonable, in our estimation, to schedule a
crew to perform the inspection of isolated steel service risers coincident with the
meter replacement cycle. Conversely, there being no basis to assume that a ten-
year cycle is related to benefits measurably superior to a twelve-year cycle, it
would be unnecessarily expensive and inefficient to conduct the service riser
inspection cycle independent of the meter inspection cycle.
Furthermore, these services are subject to the leakage surveys as described in PSC
192.723(d).
On the basis of the foregoing, we request that an alternative to the provisions of paragraph
192.465(a) be made available to utilities operating within the jurisdiction of the Wisconsin Public
Service Commission, as follows:
In the case of electrically isolated sections of steel main piping less than twenty-five (25)
feet in length used as transition sections between metallic and/or plastic systems, where
such piping has been coated and cathodically protected, utilities may as a substitute tot he
provisions of 192.465(a) perform a leakage survey in accordance with the provisions of
PSC 135 paragraph PSC 192.723(d). In the case of electrically isolated steel services
where such piping has been coated and
cathodically protected, the interval of testing the level of cathodic protection shall be the
same as the interval between meter tests as prescribed in Section PSC 134.30.
Yours very truly,
dal\192\465\72-03-03
6

<<<PAGE 7>>>

R. H. Holder, P.E.
Chairman
Gas Codes Task Force
Enclosure - 3
dal\192\465\72-03-03
7

<<<PAGE 8>>>

192.457 EXTERNAL CORROSION CONTROL: BURIED OR SUBMERGED
PIPELINES INSTALLED BEFORE AUGUST 1, 1971.
(a) Except for buried piping at compressor, regulator, and measuring stations, each buried
or submerged transmission line installed before August 1, 1971, that has an effective external
coating must, not later than August 1, 1974, be cathodically protected along the entire area that is
effectively coated, in accordance with this subpart. For the purposes of this subpart, a pipeline
does not have an effective external coating if its cathodic protection current requirements are
substantially the same as if it were bare. The operator shall make tests to determine the cathodic
protection current requirements.
(b) Except for cast iron or ductile iron, each of the following buried or submerged
pipelines installed before August 1, 1971, must, not later than August 1, 1976, be cathodically
protected in accordance with this subpart in areas in which active corrosion is found:
(1) Bare of ineffectively coated transmission lines.
(2) Bare or coated pipes at compressor, regulator, and measuring stations.
(3) Bare or coated distribution lines. The operator shall determine the areas of active
corrosion by electrical survey, or where electrical survey is impractical, by the study of corrosion
and leak history records, by leak detection survey, or by other means.
(c) For the purpose of this subpart, active corrosion means continuing corrosion which,
unless controlled, could result in a condition that is detrimental to public safety.
PSC 192.457(d) Notwithstanding the provisions of 192.457(b) (regarding active
corrosion), effectively coated steel distribution pipelines must, not later than . . . (The
remainder of this page did not print and the typist has no idea what was on it.)
dal\192\465\72-03-03
8

<<<PAGE 9>>>

(b) Mains in places or on structures where anticipated physical movement or external
loading could cause failure or leakage must be patrolled at intervals not exceeding 3 months.
PSC 192.722 Distribution Mains: Markers.
When distribution mains are located outside urban areas, their location shall be marked
(recognizable to the public) at each fence line, road crossing, railroad crossing, river, lake,
stream, or drainage ditch crossing and wherever it is considered necessary to identify the
location of a pipeline to reduce the possibility of damage or interference.
192.723 DISTRIBUTION SYSTEMS: LEAKAGE SURVEYS AND PROCEDURES.
(a) Each operator of a distribution system shall provide for periodic leakage surveys in its
operating and maintenance plan.
(b) The type and scope of the leakage control program must be determined by the nature
of the operations and the local conditions, but it must meet the following minimum requirements:
(1) A gas detector survey must be conducted in business districts, including tests of the
atmosphere in gas, electric, telephone, sewer and water system manholes, at cracks in pavement
and sidewalks, and at other locations providing an opportunity for finding gas leaks, at intervals
not exceeding 1 year.
(2) Leakage surveys of the distribution system outside of the principal business areas must
be made as frequently as necessary, but at intervals not exceeding 5 years . . . (The remainder of
this page did not print and the typist has no idea what was on it.)
dal\192\465\72-03-03
9

<<<PAGE 10>>>

(b) In each principal business district a building survey shall be conducted once a year.
The piping from the service entrance to the meter outlet and metering and regulating equipment
shall be tested for gas leakage in those buildings that have gas service.
(c) A survey of all buildings used for public gatherings such as schools, churches,
hospitals, and theaters shall be conducted once each year. The piping from the service entrance
to the meter outlet and metering and regulating equipment shall be tested for gas leakage.
(d) In residential areas, in addition to a survey of public buildings the vegetation shall
be checked. At least 3 barhole tests shall be made in each block; at least one street opening
shall be checked if one exists in each block or at each intersection; and on streets where system
is operating at a pressure of more than 10 p.s.i.g., all street openings shall be checked. (See
192.723(b) (1) above for types of street openings.) The utility may substitute for the barhole
tests a ground surface survey with a hand-operated, continuous-sampling instrument capable of
detecting combustible gas in air concentrations of 100 parts per million. The utility may
substitute for all the tests required by this section (PSC 192.723(d)) a survey by mobile flame
ionization or infrared gas detecting units, provided that a method be included to check
individual services. The tests required by this section (PSC 192.723(d)) shall be made each
year.
(e) Along lines in rural areas, the vegetation shall be checked annually.
(f) When a leak compliant is received and the odor og [sic] gas indicates that there is a
leak in or near the premises, a search shall be carried to conclusion until such leak is found.
PSC 192.724 FURTHER LEAKAGE SURVEY AFTER REPAIR OF LEAK . . . (The remainder
of this page did not print and the typist has no idea what was on it.)
dal\192\465\72-03-03
10

<<<PAGE 11>>>

(3) Rotary meters shall be tested at two loads with the minimum load at 10% of rating by
the use of a portable or volumetric meter or other approved proving devices, or be given a
differential test. In the latter case an original test record shall be set up immediately after
installation; further differential test results shall be recorded and compared with the original test
record.
(4) A test of an orifice meter shall consists of tests of the recording gauges, and the
removal, inspection and measurement of the orifice.
(5) Temperature-compensated gas displacement meters when tested shall be proved to a
base temperature of 60 degrees Fahrenheit.
(6) Turbine-type meters shall be tested at two loads with the minimum load at 10% of
rating by the use of a portable or volumetric meter or other approved proving the devices, or be
given a turbine blade, rotor and gear assembly spin test, either by manual or velocity rotation.
Before a particular type turbine meter can be used, the manufacturer must file with and be
accepted by the Commission a minimum coasting time which will satisfactorily indicate the
operating condition of the internal metering mechanism. For the spin test method a test record
shall be set up; and the original and subsequent spin test results shall be recorded and compared
with the specified minimum coasting time as filed with the Commission for that type meter.
History: Cr. Register, February; 1959, No. 38, eff. 3-1-59; am. (3), Register, November,
1962, No. 83, eff. 12-1-62; cr. (5), Register, January, 1965, No. 109, eff. 2-1-65; cr. (6),
Register, April, 1969, no. 160, eff. 5-1-69.
PSC 134.29 Installation test. No meter shall be used to meter gas consumption for billing
purposes unless it was tested and found correct, as defined in Wis. Adm. Code section PSC
134.27 not longer than 15 months previous to its use. The first test on a meter or a retest after a
major overhaul shall include a check of the registering device and linkages.
History: Cr. Register, February, 1959, No. 38, eff. 3-1-59; am. Register, April, 1969, No.
160. eff. 5-1-69.
PSC 134.30 Periodic testing and maintenance. Each utility shall test its meters according
to the following schedule except as provided in Wis. Adm. Code section PSC 134.26(1). Where
pressure regulators, volume corrective devices, or other measuring devices are used on the service
or used in conjunction with the meters, they shall be tested on the same schedule as the meters.
(1) All diaphragm meters that are measuring dry gas and have nonabsorptive type
diaphragms or were rediaphragmed since the introduction of dry gas shall be due for removal
dal\192\465\72-03-03
11

<<<PAGE 12>>>

from service, tested, adjusted, repaired if necessary, and retested if reused, every 144 months if
the meter capacity is 2,400 cubic feet per hour or less at 1/2-inch water column and every 48
months if the capacity is greater than 2,400 cubic feet. Meters shall be tested during the calendar
year in which said 144th or 48th month falls.