# Georgia Public Service Commission — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-74-0100
- **title:** Georgia Public Service Commission — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1974-01-04
- **effective on:** Not available
- **summary:** PI-74-0100 response to Georgia Public Service Commission concerning 192.181.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-74-0100.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-74-0100.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-74-0100
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1974/g74-01-04_Crudup_192.181-nlmx.pdf
**body:**

<<<PAGE 1>>>

PI-74-0100
January 4, 1974
Mr. J. J. Crudup
Utilities Engineer
Georgia Public Service Commission
244 Washington Street, SW
Atlanta, GA 30334
Dear Mr. Crudup:
This responds to your letter of December 3, 1973, requesting an interpretation of Section 192.181(c) (1).
Your letter states:
"Part 192.181 (c) (1) states that each valve as a main installed for operating or emergency purposes
must be placed in a readily accessible location so as to facilitate its operation in an emergency. Does
this require the operator to bring all seek valve stems up to grade through standpipes, or by similar
manner?"
The intent of the requirement is to provide for the quick and easy operation of a valve installed for
operating or emergency purposes on a main. The employees of a gas operator should be able to close
such a valve within minutes after arriving at the valve site. If , for instance, a valve is buried and time must
be spent to locate it and then remove the paving and backfill in order to operate it, the requirement of
section 192.181 (c) (1) has not been met.
An operator can comply with the requirement by bringing the valve stem up to grade in a standpipe, as
you suggest, or by operating the valve at the level of burial through a standpipe by using a portable
extension. Other methods may also be employed. The operator or designer of the system who has
experience and familiarity with local conditions should be able to determine the best procedure to use.
You also asked if we had considered the degree of accessibility as a function of class location. There was
no such consideration when the regulation was adopted. Section 192.181(c) (1) is based on a comparable
provision in the 1968 edition of the American National Standard Code for Pressure Piping, Gas
Transmission and Distribution Piiping Systems, B31.8, which does not classify accessibility by location. This
code was used by the gas industry on a voluntary basis prior to issuance of the Federal Gas Safety
Standards.
I hope this answers your questions fully. If we can be of any further assistance, please contact us.
Sincerely,
Original signed by:
Joseph C. Caldwell
Director
Office of Pipeline Safety

<<<PAGE 2>>>

Georgia Public service Commission
244 washignton Street, S.W.
Atlanta, Georgia 30334
December 3, 1973
Mr. Joseph C. Caldwell, Director
Office of Pipeline Safety
U. S. Department of Transportation
400 Seventh Street, S. W.
Washington, D. C. 20590
Dear Mr. Caldwell:
This Commission requests clarification and interpretation of CFR 49, Part 192.181 - Distribution Line Valves.
Part 192.181 (c) (1) states that each valve on a main installed for operating or emergency purposes must be
placed in a readily accessible location so as to facilitate its operation in an emergency. Does this require the
operator to bring all such valve stems up to grade through standpipes, or by similar manner?
Furthermore, has any consideration been given by OPS to the degree of accessibility as a function of class
location? Your reply to these questions will be greatly appreciated.
Yours truly,
J. J. Crudup
Utilities Engineer
- **truncated:** false
- **body characters:** 3111
