# Herbert Schroeder, Jr. — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-76-017
- **title:** Herbert Schroeder, Jr. — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1976-04-13
- **effective on:** Not available
- **summary:** PI-76-017 concerning 192.619.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-76-017.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-76-017.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-76-017
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1976/PI76017.pdf
**body:**

<<<PAGE 1>>>

April 13, 1976
Mr. Byrd L. Minter, Manager
Sealants Department
Ford, Bacon & Davis
P.O. Box 1762
Monroe, Louisiana 71201
Dear Mr. Minter:
This refers to your letter of March 26, 1976, in which you ask whether Section 192.619(c) or
Section 192.621(a) governs the maximum allowable operating pressure of a steel distribution
pipeline with an inlet pressure of 170 psig.
For a steel or plastic high-pressure distribution pipeline the maximum allowable operating
pressure is governed by Section 192.619, subject to the applicable limitation of Section 192.621.
Under these requirements, a person may not operate a pipeline at a pressure permitted by Section
192.619(c) if that pressure would exceed the applicable limitation of Section 192.621.
If we may be of further assistance, please let us know.
Sincerely,
Cesar DeLeon
Acting Director
Office of Pipeline
Safety Operations
dal\192\619\76-04-13
1

<<<PAGE 2>>>

March 26, 1976
DOT Pipeline Safety Policy
Office of Safety Affairs
400 7th Street SW
Washington, DC 20590
Gentlemen:
I need clarification regarding the maximum allowable operating pressure of a natural gas
distribution feeder line. The line is welded ERW and does not have any service lines connected to
it. Elements of the system have been installed over the past thirty years. Elements were tested at
varying pressures between 100 psig and 275 psig. Two elements of the system have a different
history, prior to July 1, 1970, of maximum operating pressure prior to their being connected and
becoming a continuous system.
One element of the system has a history of maximum operating pressure of less than 100 psig.
Another element of the system has a history of maximum operating pressure of approximately 150
psig. Recently an element with a history of operating pressure of approximately 300 psig and test
pressure of 500 psig has become part of the system. The maximum inlet pressure to the system is
now approximately 170 psig.
The basic question is which section of the rule applies to this type of line (system), paragraph
192.619 or 192.621. As I understand:
If 192.619 applies, then paragraph (c) governs the MAOP even though certain elements of
the system were only tested at a lower design pressure in accordance with (a)(2)(ii).
If paragraph 192.621 applies, and a design pressure in accordance with paragraph (a)(1) is
less than the history of the maximum safe operating pressure, then paragraph (a)(1)
applies.
Your clarification of the interpretation of these two paragraphs would be appreciated as this is a
typical question that comes up many times during discussions of MAOP's of gas distribution
feeder lines operating in the less than 200 psig range.
Sincerely,
Byrd L. Minter, Manager
Sealants Department
dal\192\619\76-04-13