{"operation":"document","citation":"PI-76-078","title":"Bray — Pipeline Safety Interpretation","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"1976-12-15","effective_on":null,"summary":"PI-76-078 concerning 192.705.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-76-078.json","markdown":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-76-078.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-76-078","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1976/PI76078.pdf","body":"<<<PAGE 1>>>\n\nDecember 15, 1976\nMr. Bray\n9310 Almeda-Genoa Road\nHouston, Texas 77034\nDear Mr. Bray:\nThis is in reply to your letter of December 6, 1976, concerning requirements for leak survey for\ntransmission lines.\n49 CFR, Part 192, Section 705 requires a patrol program for transmission lines, including\nindications of leaks, and as you state, Section 192.789 states requirements for record keeping of\nleaks discovered.\nWe have opened a Houston office. It is located at 201 Fannin Street, Room 316, Houston, Texas\n77002, and headed by Marshall Taylor.\nWe hope this answers your question and if you have further questions, do not hesitate to ask.\nSincerely,\nJoseph C. Caldwell\nDirector, Acting\nOffice of Pipeline Safety\ndal\\192\\705\\76-12-15","truncated":false,"body_characters":742}