# G&K Management Co., Inc. — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-77-014
- **title:** G&K Management Co., Inc. — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1977-05-01
- **effective on:** Not available
- **summary:** PI-77-014 response to G&K Management Co., Inc. concerning 192.457.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-77-014.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-77-014.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-77-014
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1977/PI77014.pdf
**body:**

<<<PAGE 1>>>

May 1, 1977
Mr. Sherman Gardner
President
Association of HUD
Management Agents
G&K Management Co., Inc.
1309 Wilshire Boulevard
Suite 250
Los Angeles, California 90010
Dear Mr. Gardner:
This refers to your letter of March 4, 1977, in which you suggest that since the enforcement
activities of this Office are directed to a lesser degree to master meter operators, the deadline for
compliance with 49 CFR 192.457 should be extended to allow HUD-insured developments time
to obtain appropriate funding for compliance activities.
After consideration of the argument presented in your letter, this Office does not feel that you
have presented any additional information that would justify amending the cathodic protection
deadline under Section 192.457 for HUD-insured developments. Our policy with respect to
enforcement is not founded on the appropriateness of the legal requirement, and should not be
construed as such. We have discussed the issue of notice in previous correspondence and in the
absence of any showing that HUD developments in general were unable to secure funding during
the 5-year lead time provided for compliance, we do not feel that the requirement is unreasonably
applied to those developments. We would of course consider individual applications for waiver of
the requirement, based on evidence of a good faith effort to comply within the 5-year period and
an inability to secure funding in that period.
With regard to any development which is now operating in violation of the requirement, our
enforcement policy takes into account all timely efforts made to achieve compliance and any
extenuating circumstances involved.
Sincerely,
Cesar DeLeon
Acting Director
Office of Pipeline
Safety Operations
dal\192\457\77-05-01
1

<<<PAGE 2>>>

March 4, 1977
Mr. Cesar DeLeon, Acting Director
Office of Pipeline Safety Operations
Department of Transportation
Materials Transportation Bureau
Washington, D.C. 20590
Dear Mr. DeLeon:
Although I have appreciated your correspondence regarding the Cathodic Protection deadline, it
is our hope you will address our dilemma more succinctly.
You indicated in your most recent letter of January 26, 1977 that your enforcement activities are
primarily directed toward pubic utilities, and to a lesser degree--master meter operators.
Since you indicate in your letter that Cathodic Protection enforcement for public utilities will be
addressed to a different degree than master meter operators, it would equitably follow that a
revised implementation date for small firms such as those in our Association would be
appropriate. I specifically refer to the three-year extension we originally requested, which would
enable owners of HUD-insured developments time to collaborate with HUD to determine how
such funding is to be achieved.
I would like to point out that since 1972 we have built numerous apartment complexes in
accordance with and subject to HUD specifications. Never was cathodic protection
implementation enforced.
As you know, the nature of federally subsidized housing is such that funding solicitation, if not
already contractual, is a most tedious and slow bureaucratic process.
It is hoped that, based on the above, there will be a reevaluation of the implementation deadline
through the knowledge that the public utilities are better equipped to facilitate funding for such a
formidable endeavor, and are entirely different entities from small management firms whose
complex fundings are subject to HUD specifications.
Most sincerely,
Sherman Gardner
dal\192\457\77-05-01
2

<<<PAGE 3>>>

President
ASSOCIATION OF HUD MANAGEMENT AGENTS
G&K MANAGEMENT CO., INC.
dal\192\457\77-05-01
3
- **truncated:** false
- **body characters:** 3670