# Mr. James R. Troutman — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-78-002
- **title:** Mr. James R. Troutman — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1978-01-09
- **effective on:** Not available
- **summary:** PI-78-002 concerning 195.210.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-78-002.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-78-002.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-78-002
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/PI78002.pdf
**body:**

<<<PAGE 1>>>

January 9, 1978
Mr. James R. Troutman
Route 1, Box 698-C
Salisbury, North Carolina 28144
Dear Mr. Troutman:
Your letters of December 3, 1977, to the North Carolina Utilities
Commission and of November 1977, to the Environmental Protection
Agency have been forwarded to this Office for response.
The Materials Transportation Bureau, Office of Pipeline Safety
Operations, regulates the safety of interstate petroleum
pipelines (such as the one proposed by the Colonial Pipeline
Company) under the Transportation of Explosives Act (18 USC 831-
835). Regulations governing the design, construction, operation,
and maintenance of petroleum pipelines are contained in 49 CFR
Part 195 (copy enclosed). These regulations provide for public
safety through requirements governing the structural integrity of
pipelines.
The regulations do not require that environmental impact studies
be prepared for the construction of pipelines. In the Federal
government, such a study may have been prepared by the U.S. Army
Corps of Engineers for the Colonial pipeline if that agency
granted a permit for it to cross a navigable waterway. You may
contact that agency at its Office of Public Affairs, Washington,
D.C. 20314, for further information on whether a study has been
prepared.
Regarding your specific question about the safety of the pipeline
if it is constructed 20 feet from your house, Section 195.210(a)
of the regulations states that a pipeline right-of-way must be
selected to avoid, as far as practicable, areas containing
private dwellings, industrial buildings, and places of public
assembly. However, where avoidance of populated areas is not
practicable, Sections 195.210(b) and 195.248 prescribe an
additional 12 inches of cover for pipelines within 50 feet of any
private dwelling. Assuming normal excavation, a minimum of 48
inches of cover will be required if the line is constructed
within 50 feet of your home.
This Office will be reviewing Colonial Pipeline Company's
construction plans and specifications and making onsite field
inspections during the construction of the pipeline to check for
compliance with the Federal standards.
dal\195\210\78-01-09
1

<<<PAGE 2>>>

I hope that this information is satisfactory. Thank you for your
interest in pipeline safety.
Sincerely,
Cesar DeLeon
Acting Director
Office of Pipeline
Safety Operations
Enclosure
dal\195\210\78-01-09
2

<<<PAGE 3>>>

December 9, 1977
Mr. James C. Thomas, Chief
Southern Region
Department of Transportation
Office of Pipeline Safety Operations
1568 Willingham Drive, Suite 207B
Atlanta, Georgia 30337
Dear Mr. Thomas:
Attached is a letter we received concerning construction of
the new 40" Colonial Pipeline in North Carolina. Since we do not
regulate such lines under Part 195, I am forwarding this letter
for your response.
Yours very truly,
I. H. Hinton, Director
Transportation Division
Attachment
dal\195\210\78-01-09
3
- **truncated:** false
- **body characters:** 2915
