# Pipeline Safety Interpretation PI-78-0110

- **operation:** document
- **citation:** PI-78-0110
- **title:** Pipeline Safety Interpretation PI-78-0110
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1978-11-30
- **effective on:** Not available
- **summary:** PI-78-0110 concerning 192.3.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-78-0110.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-78-0110.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-78-0110
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1978/g78-11-30_SIMPSON_192.3_Transmission%20Line-nlmx.pdf
**body:**

<<<PAGE 1>>>

PI-78-0110
November 30, 1978
Mr. A. D. Simpson, III
East Tennessee Natural Gas Company
P.O. Box 2511
Houston, Texas 77001
Dear Mr. Simpson:
As a result of your September 6, 1978, letter supplying additional information about the
Kingsport Lateral System, we have reconsidered our Interpretation of August 2, 1978, that the
portion of the Kingsport Lateral System used to deliver gas to the General Shale Corporation is
not a "transmission line."
Of particular importance is your point that the present definition of "transmission line" in 49 CFR
192.3 was not preceded by a proposed definition of the term in the notices of proposed
rulemaking upon which Part 192 is based. Since the term "transmission line" was used in those
notices and the notices were, in general, based on the U.S.A.S. B31.8 Code (1968 ed.), we agree
that the notices must have been drafted with the B31.8 definition of "transmission line" in mind.
Under these circumstances, it would be improper to conclude as we did in the August 2, 1978,
Interpretation that the adopted definition of "transmission line" in Part 192 was intended to alter
the meaning intended by the B31.8 Code.
Since the term "transmission line" in Part 192 is intended to have the same meaning as that in the
B31.8 Code, it follows that the term "distribution center," which marks the end of a "transmission
line" in the adopted definition, must be interpreted to include a "large volume customer," a term
which marked the end of a "transmission line" under the B31.8 Code.
To apply this interpretation, we must determine what B31.8 meant by "large volume customer."
There is no question that as we previously stated, a "distribution center" occurs at a "point where
gas enters piping used primarily to deliver gas to customers who purchase it for consumption."
Basically, this includes points where title to gas is transferred from a transmission company to a
distribution company. Since in the B31.8 Code, the terms "distribution center" and "large
volume customer" were both used to define the end of a "transmission line," it is logical to
conclude that except for the factor of resale, a "large volume customer" meant a customer with
attributes similar to those of a distribution company. Foremost among these attributes are the
receipt of similar volumes of gas and the operation of piping facilities common to a distribution
company. Thus, a customer fitting this description would also represent a "distribution center"
under Part 192.
To properly answer your original inquiry, we have looked at whether the General Shale
Corporation qualifies as a "large volume customer" within the meaning of the B31.8 Code.
Based on the information you have submitted, we find that General Shale (1) receives gas in a

<<<PAGE 2>>>

quantity almost as large as that delivered to the neighboring distribution company, Volunteer
Natural Gas Company; and (2) operates piping similar to that operated by a distribution
company. Since these factors characterize a "large volume customer" within the meaning of
"distribution center" under the adopted "transmission line" definition, the portion of the
Kingsport Lateral System serving General Shale, or the General Shale lateral, is a "transmission
line" under Part 192. Further, based on the information provided in your May 17, 1978, letter
concerning class locations, it appears that at least 50 percent of the length of the General Shale
lateral is in a Class 1 location, and therefore, the lateral is exempt from orodization under section
192.625(b((3).
To ensure that our interpretation of "transmission line." particularly the "distribution center"
aspect regarding "large volume customers" is applied uniformly, we intend to publish it in the
Federal Register. At the same time, we will invite public comments on the Impact of this
interpretation on the regulated industry and on public safety, and also on our judgment as to what
constitutes a "large volume customers." If the comments warrant it, we may change our
interpretation or propose to change the definition of "transmission line."
Sincerely,
Cesar DeLeon
Associate Director for
Pipeline Safety Regulation
Materials Transportation Bureau

<<<PAGE 3>>>

August 2, 1978
Mr. A. D. Simpson, III
East Tennessee Natural
Gas Company
P. O. Box 2511
Houston, Texas 77001
Dear Mr. Simpson:
By letter of May 17, 1978, you requested our opinion on whether 49 CFR 192.625(b)(1) and (2)
requires East Tennessee to odorize that portion of its Kingsport Lateral System that is used to
deliver gas to the General Shale Corporation.
As shown on Exhibit A to your May 17 letter, the Kingsport Lateral System consists of an
arrangement of interlocking pipelines from East Tennessee's 3300 line. That portion of the
System serving General Shale consists of the Kingsport Lateral, about 2,642 feet of the Mead
Corporation Lateral, and the General Shale Lateral.
To answer you correctly, we asked for an explanation of East Tennessee's basis for classifying
that portion of the System serving General Shale as a "transmission line" under Part 192. This
information was provided by your letter of June 9, 1978.
You have made at least three separate arguments: First, you point out that under the industry
code in effect before the adoption of 49 CFR Part 192 (the ANSI B31.8 Code), a "transmission
line" was defined as " 'pipe installed for the purpose of transmitting gas from a source or sources
of supply to one or more distribution centers or to one or more large volume customers...'"
Because of the volume being delivered to General Shale (4196 Mcf/d), presumably we are to
conclude that the pipeline involved is a transmission line under the ANSI definition. Regardless
of such a conclusion, however, the term "transmission line" is defined in Part 192 (§192.3), and it
is that definition that we must look to first in determining which gas pipelines are subject to Part
192 standards that apply to transmission lines. Only if the "transmission line" definition is
considered ambiguous in any respect would we look for clarifying information in background
documents such as the B31.8 Code.
Your next argument relates to the statutory definition of the term "interstate transmission
facilities." You state that all East Tennessee's facilities fall within that statutory definition and,
therefore, are by implication "transmission pipelines." Notwithstanding this implication, the
term "transmission line" in Part 192 is not defined in terms which relate to an "interstate
transmission facility." Therefore, it cannot be correctly concluded that if a pipeline fits the
statutory definition of "interstate transmission facility," it is consequently a "transmission line"
under Part 192. Further, while we disagree with your interpretation of the 1976 amendment to
the statutory definition of "interstate transmission facility," we concur with your view that there
is no relation between that amendment and the classification of pipelines as "transmission lines"
under Part 192.

<<<PAGE 4>>>

Your last argument relates to the definition of the term "transmission line" in Section 192.3.
Under Section 192.3, if a gas pipeline which is not a gathering line (1) either transports gas from
a gathering line or storage facility to a distribution center or storage facility,(2) operates at 20
percent or more of SMYS, or (3) transports gas within a storage field, it is a "transmission line."
Otherwise it is a "distribution line." Considering all the information presented (including the
excerpted Technical Pipeline Safety Standards Committee transcript), it appears that by this
definition, that portion of the Kingsport Lateral System used to deliver has to the General Shale
Corporation would be a transmission line in its entirety only if the point of delivery qualifies as a
"distribution center." Since this latter term is not defined, it must be interpreted in light of its
ordinary meaning and usage in the industry.
You have argued that the point of delivery to General Shale is a "distribution center" because the
downstream piping is "a distribution network which delivers gas to the various points of
utilization in the General Shale plant." We are not persuaded, however, that the natural gas
transmission industry commonly refers to a point of delivery to an industrial customer as a
"distribution center." The word "distribution" itself has a plural connotation, and the ANSI
definition of "transmission line" which you cited distinguishes "distribution centers" from "large
volume customers."
We have not found a written definition of the term "distribution center" in ANSI B31.8 or in
other relevant background material. Nevertheless, we believe that the term commonly refers to
that point where gas enters piping used primarily to deliver gas to customers who purchases it for
consumption as opposed to customers who purchase it for resale. In this sense, the connection of
the Kingsport Lateral with the 3300 Line is a "distribution center," and the downstream piping
comprises either mains or service lines which must be odorized under the requirements of
Section 192.625(a).
We recognize that under this interpretation, the lines serving General Shale have a different
classification than existed under ANSI B31.8 prior to the adoption of Part 192. However, we
have no reason to believe that the Part 192 definition of "transmission line" - inasmuch as it
deletes the reference to large volume customers contained in the ANSI definition - was not
intended to alter prior classifications. Indeed, just the opposite seems true, as indicated by the
preamble to Part 192 where it is stated with respect to Section 192.3, "We have defined those
terms which are being used in a different sense than the commonly understood meaning.
Sincerely,
Cesar De Leon
Associate Director for
Pipeline Safety Regulation
Materials Transportation Bureau