# Pipeline Safety Interpretation PI-82-0113

- **operation:** document
- **citation:** PI-82-0113
- **title:** Pipeline Safety Interpretation PI-82-0113
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1982-12-27
- **effective on:** Not available
- **summary:** PI-82-0113 concerning 192.327.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-82-0113.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-82-0113.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-82-0113
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1982/g82-12-27_Leach_192.327-nlmx.pdf
**body:**

<<<PAGE 1>>>

PI-82-0113
U. S. Department of Transportation
Research and Special Programs Administration
400 Seventh Street, S.W.
Washington, D.C. 20590
December 27, 1982
The Honorable Jim Leach
U.S. House of Representatives
Washington, D.C. 20515
Dear Mr. Leach:
This refers to your communication of December 7, 1982, requesting our consideration of a letter from Bonnie T. Eggers
regarding the proper depth at which gas pipelines should be buried. Ms. Eggers' concern stems from the death of two
relatives in a recent pipeline accident at Hudson, Iowa.
The Federal safety standards for gas pipelines are set forth in Part 192 of Title 49 of the Code of Federal Regulations.
These standards were issued under the Natural Gas Pipeline Safety Act of 1968 (49 U.S.C. 1671 et seq.). Section 192.327
of the standards requires that buried transmission lines in rural areas, like the one involved in the Hudson accident, be
constructed with at least 30 inches of soil cover or 18 inches of rock cover. The required cover increases to 36 inches
and 18 inches, respectively, for areas with a higher population density. These burial depths exceed the depths that
were recommended for gas pipelines by the American Society of Mechanical Engineers in its B31.8 Code for pressure
piping that was in effect when the standards were adopted.
The purpose of the prescribed depths is to reduce the likelihood that a buried pipeline will be damaged by normal
cultivation or other digging activities. While a greater burial depth might logically be expected to further reduce this
likelihood, there is no empirical evidence supporting the proposition that increasing burial depth would be cost-
effective from a safety perspective.
In contrast, experience has shown that measures such as line marking, mapping, and advance coordination of
construction work provide more effective and economical approaches to damage prevention than deeper burial. In this
regard, the Federal safety standards require operators of buried pipelines in rural areas to install permanent marking
signs along the pipelines to show their location. Each sign provides a warning, the name of the operator, and a
telephone number that an excavator may call to learn more specific information about the pipeline before beginning to
dig. Another standard that was recently adopted for pipelines in populated areas (47 FR 13818; April 4, 1982) requires
operators to provide a damage prevention program. Typically, under these programs an excavator calls a publicized
number before digging, and the pipeline operator furnishes temporary marking at the job site. Such programs provide
advance coordination between operators and excavators and are often run in cooperation with operators of other
underground utilities. We will be monitoring the effects of the various damage prevention programs established under
the new regulation before taking any further rulemaking action toward prevention of outside force damage to buried
pipelines. The protective measures that the Federal standards provide are, of course, not infallible. I understand that
the pipeline involved in the tragic Hudson accident had been temporarily marked before it was damaged by the
trenching equipment. Human error, particularly by excavators outside the pipeline industry and the reach of our
jurisdiction, will inevitably continue to be a causal factor in pipeline accidents despite the most diligent Federal
regulatory efforts.
I trust this adequately responds to your inquiry, but should you need additional information, do not hesitate to contact
me.
Sincerely,
Howard Dugoff

<<<PAGE 2>>>

1006 Park Street
University Park, IA 52595
December 1, 1982
The Honorable James Leach
House of Representatives
Washington, D. C, 20515
Dear Mr. Leach:
On November 4, 1932, a gas pipeline exploded near Hudson, Iowa, taking the lives of my uncle, cousin, and three
other innocent people'. Not until that tragedy happened was I or the general public aware that the gas companies
were required to bury their pipelines only 30 inches deep. This is a travesty which must be remedied.
While I am aware that regulating the gas companies has been delegated to an Administrative Agency; namely, the
United States Department of Transportation, I believe this should be changed. Legislation should be introduced to
regulate the gas companies.
Although I do plan to petition the United States Department of Transportation, I have worked in a law office for five
(5) years and therefore, I know that it is nearly impossible to get an administrative rule change,
Mr. Leach, you represent a state that is largely comprised of farmers. I know of several farmers who presently have
exposed pipelines or the pipelines are buried below the minimum standard, -With soil erosion, doesn't a 30-inch
minimum standard seem more than a little ridiculous? How long before a farmer hits one of these lines with a chisel
plow? Are you aware that this makes about the fifth explosion in the past three years? Perhaps the loss of a few lives
due to lax regulations and indifference are no big deal.
I beseech you to introduce legislation to remedy the situation. My family members can never be brought back, but
please don't let them have died in vain.
Please let me hear from you.
Yours very truly,
Bonnie J. Eggers JJ
- **truncated:** false