# Pipeline Safety Interpretation PI-83-0110

- **operation:** document
- **citation:** PI-83-0110
- **title:** Pipeline Safety Interpretation PI-83-0110
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1983-10-31
- **effective on:** Not available
- **summary:** PI-83-0110 concerning 192.727.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-83-0110.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-83-0110.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-83-0110
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1983/g83-10-31_McGowan_192.727-msfx.pdf
**body:**

<<<PAGE 1>>>

PI-83-0110
October 31, 1983
Mr. John B. McGowan, Jr.
Vice President, Utilities Material and Controls
Corporation
P.O. Box 991
Paoli, PA 19301
Dear Mr. McGowan:
This is in response to your letter of September 19, 1983, requesting our interpretation of §192.727 of 49 CFR Part 192
relative to the use of your company's expandable polymer plug process for permanent abandonment of a service line.
Our position remains the same as stated in the June 2, 1981, letter of Acting Associate Director Melvin A. Judah. The
method would satisfy the requirements of §192.727(d)(2) whenever service to a customer is discontinued. However,
use of a plug device without disconnecting the service from the source of gas would not meet the requirements of
§192.727(b). We point out, also, that the industry Code ANSI/ASME B31.8 - 1982 and the ASME Guide for Gas
Transmission and Distribution Piping Systems - 1983 both state that abandoned lines should be "physically
disconnected" or "disconnected" from all sources of gas as the first item listed under "abandonment" or "abandoning"
relative to this matter.
As we stated in our letter of July 15, 1981, if you or gas opera-
tors wish to request a rule change to permit use of the process for abandonment of gas services, the guidelines in 49
CFR §106.31 would be applicable.
I trust this information will be of assistance to you.
Sincerely,
Richard L. Beam
Associate Director for
Pipeline Safety Regulation
Materials Transportation Bureau

<<<PAGE 2>>>

September 19, 1983
Mr. Melvin A. Judah
Chief, Technical Division
OPSR/MTB
Research & Special Programs Administration
Department of Transportation
Washington, DC 20590
Dear Mel:
Thank you so much for your time and that of your staff on Friday, September 2, 1983. The meeting was most
informative and produc-
tive.
As you know, our company is currently developing a process whereby a heat expandable polymer plug will be inserted
in a service line, positioned at the second threaded joint of the tee and expanded to permanently shut off gas flow on
low pressure services. The pipe would then be internally cut three feet from the basement wall of the dwelling, the
stub removed and the wall patched.
Our interpretation of 192.727 is that such a system satisfies the requirements for a permanent abandonment of a
service line. You will recall some confusion about what this section provides for service abandonments - it seems to be
ambiguous.
Please consider this a formal request for your departments interpretation of this section as it applies to our system for
permanent abandonments. Enclosed for your perusal are two of my earlier correspondences with your department
concerning this matter.
I anxiously await your response.
Sincerely,
John B. McGowan, Jr.
Vice President
Enclosure

<<<PAGE 3>>>

December 30, 1980
Mr. Paul J. Cory
Material Transportation Bureau
Office of Pipeline Safety Operations
U.S. Department of Transportation
400 Seventh Street, SW
Washington, D.C. 20590
Dear Paul:
This letter follows-up our recent telephone conversation concerning accepted and approved methods of permanently
abandoning or deactivating the service lines to customers of pubic gas distribution utilities. -More specifically: Section
192.727-"Abandonment or inactivation of facilities" of the Federal Code.
Our company is currently interested in marketing an internal, heat expandable polymer plug, which would be inserted
from the dwelling end of the service, out and expanded into the tee connection at the main. This process would
eliminate excavation, which is today one of the greatest costs in a utility maintenance budge.
It is our interpretation that this method would be acceptable under Section (d), Part (2) of 192.727. A number of our
clients interpret the code to read that a physical disconnection, i.e.; cutting the service away from the main, is required.
As I interpret this section, a physical disconnect is only one of the options which can be followed.
It would be helpful if you could send a written clarification on this question. Please include whether physical
disconnection of the service line from the main supply is optional or manditory [sic].
If you have any questions regarding our systems, please do not hesitate to contact our office.
Thanking you for your attention to this request, I am,
Sincerely,
John B. McGowan
President
Enclosure

<<<PAGE 4>>>

June 2, 1981
Mr. John B. McGowan
President, Utilities Material
& Controls Corporation
P.O. Box 991
Paoli, Pennsylvania 19301
Dear Mr. McGowan:
This responds to your recent question regarding 49 CFR §192.727(d)(2).
The method you describe to prevent the flow of gas by the inser-
tion of an expandable plastic device into a service line would satisfy the requirements of §192.727(d)(2). This device
may be used whenever service to a customer is discontinued.
The first paragraph of your letter mentions permanently abandon-
ing a service line. To avoid any misunderstanding about the application of the various paragraphs of §192.727,
paragraph (b) deals with all pipelines which have been abandoned, and specifi-
cally requires a physical disconnect. The use of a plug device without a physical disconnect would not satisfy the
requirements of §192.727(b).
Sincerely,
Melvin A. Judah
Acting Associate Director for
Pipeline Safety Regulation
Materials Transportation Bureau

<<<PAGE 5>>>

June 5, 1981
Mr. Melvin A. Judah
Acting Associate Director
for Pipeline Safety Regulation
Materials Transportation Bureau
Department of Transportation
Washington, D.C. 20590
Dear Mr. Judah:
Regarding the receipt of your letter dated June 2, 1981, in reference to the interpretation of 49 CFR §192.727(d)(2).
As you know, we have developed a new system for the abandonment and/or the disconnection of gas service lines
without excavation at the main which, of course, is a major cost to the consumer and the utilities, as well as the general
nuisance to the general public. In addition to the general plugging system we have a method to physically disconnect
service lines by internally cutting the service, thus rendering it completely separated from the main.
Mr. Robert Langley, of your office, and myself had a lengthy phone conversation in regard to the paragraph
§192.727(b), as to where the service line had to be disconnected.
We would very much like to invite you and your people involved in this area to visit our Frazer, Pennsylvania (suburban
Philadel-
of how it works.
phia) laboratory, where we could demonstrate our present system so that your people could get first hand knowledge
We feel that our system, which is a new state of art, could be considered for a rule change if the need exists.
We thank you for your letter and hope that you will accept our invitation to visit our facilities.
Best Regards,
John B. McGowan
President

<<<PAGE 6>>>

July 15, 1981
Mr. John B. McGowan
President, Utilities Material and Controls
Corporation
P.O. Box 991
Paoli, PA 19301
Dear Mr. McGowan:
This responds to your letter of June 5, 1981, about your system for "abandonment and/or the disconnection of gas
service lines" and your kind invitation to our staff to visit your laboratory in Frazer, Pennsylvania.
I am sure that we would find the demonstration of your new system most interesting. Regrettably, because of recent
staff deple-
tions and high workload priorities, we will not be able to accept your offer.
If you or the gas operators you supply wish to request a rule change to permit a system as you have described to be
used for the abandonment of gas services, we list the following guidelines for proposing rule changes. Of particular
importance are the technical facts supporting any change proposed for the safety regulations.
MTB's rulemaking procedures in 49 CFR §106.31, Petitions for rulemaking, state:
(a) Any interested person may petition the Director to establish, amend, or repeal a regulation.
(b) Each petition filed under this section must-
(1) Set forth the tests or substance of the regulation or amendment proposed, or specify the rule that the
petitioner seeks to have repealed, as the case may be;
(2) Explain the interest of the petitioner in the action requested; and
(3) Contain any information and arguments available to the petitioner to support the action sought.
By way of advice, the "information and arguments" of (b)(3) above should cover the following points:
 What is the safety problem relating to the action sought?
 Why is the existing rule, or lack of rule, inadequate? Include history or origin of existing safety situation
with facts supporting need for change.
 How will the proposed action solve the problem? Why is it the best of alternative solutions to the
problem in terms of costs, feasibility, etc.
 State any anticipated benefits (quantify if possible).
 What is the estimated cost, or the savings, of the proposal?
I trust the above information will be of assistance to you.
Sincerely,
Melvin A. Judah

<<<PAGE 7>>>

Acting Associate Director
for Pipeline Safety Regulation
Materials Transportation Bureau

<<<PAGE 8>>>

November 2, 1983
Mr. Richard L. Beam, Associate Director
Office of Pipeline Safety Regulations
Material Transportation Bureau
Department of Transportation
Washington, D.C. 20590
Dear Mr. Beam:
I recently received a copy of your memorandum dated September 14, 1983, to Robert L. Paullin regarding a
request for clarification of Section 192.614(b)(4). I was shocked to learn that this memorandum completely
contradicted a position your office took on this matter in June, 1983. This turnaround concerns me greatly because the
credibility of the Office of
Pipeline Safety Regulation has been seriously questioned by myself and many of my state pipeline safety colleagues. I
would expect that any verbal communication of positions would carry the same weight or importance as any written
position.
Being a strong supporter of the Federal/State partnership in pipeline safety, I believe we must all work together
to accomplish the task of fulfilling our responsibilities under the appropriate Federal and State pipeline safety laws. I
would encourage your office to establish procedures to inform interested persons of actions your office intends to take
regarding inquiries from those interested people prior to circulating such material throughout the country. This should
help ensure that the issue being addressed was completely understood.
I do not believe my June 17, 1983, letter to Mr. Edward Ondak regarding Section 192.614(b)(4) was properly
characterized or addressed in your September 14, 1983, answer to Mr. Paullin's
request for clarification. I am willing to discuss this matter with you or your staff and if additional information or further
clarification is required, I will be pleased to work with you.
I would appreciate your consideration in the matter and will indicate that we are not attempting to weaken the
intent of the regulations but are recognizing that damage prevention programs are different from state to state. The
Michigan damage preven-
tion legislation (1974 PA 53) and the one call communication system (MISS DIG) is the heart of the damage prevention
program in Michigan. This program, together with the cooperation of excavators and various utilities, has operated in
an effective and efficient manner and it is my desire to see that continue.
Very truly yours,
Michael J. Kidd, Supervisor
Office of Gas Operations
- **truncated:** false
- **body characters:** 11411
