# Arkla Energy Resources — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-89-002
- **title:** Arkla Energy Resources — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1989-03-11
- **effective on:** Not available
- **summary:** PI-89-002 response to Arkla Energy Resources concerning 192.229.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-89-002.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-89-002.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-89-002
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1989/PI89002.pdf
**body:**

<<<PAGE 1>>>

Mr. Paul G. Espinosa
DOT Compliance & Pipeline Safety
Arkla Energy Resources
P.O. Box 21734
Shreveport, Louisiana 71151
Dear Mr. Espinosa:
We have considered your letter of May 8, 1989, in which you request permission to requalify
welders under §192.229(c) by using a twice-a-year schedule instead of the 6-month interval the
rule prescribes.
It is our policy not to grant a request for waiver of a gas pipeline safety standard unless the
request is for a special situation, one that does not exist among gas pipelines in general. Because
your proposed schedule would maximize the usefulness of, and add flexibility to, the welder
qualification period, it would benefit all gas operators that are subject to §192.229(c). We,
therefore, are treating your letter as a request to change §192.229(c) rather than as a request to
waive the requirements of §192.229(c) in a special situation.
As such, the merits of your request will be considered in the review phase of a rulemaking
proceeding we have scheduled to equalize the gas and hazardous liquid pipeline welding rules.
Any change we propose to adopt for §192.229(c) will be announced in a notice of proposed
rulemaking for this proceeding, which we plan to publish next year.
Sincerely,
/signed/
Richard L. Beam
Director
Office of Pipeline Safety
DB
C:\WP51\INTERPRT\192\229\89-03-11
1
- **truncated:** false
- **body characters:** 1351
