# Mid-Continent Pipe Line Company — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-89-020
- **title:** Mid-Continent Pipe Line Company — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1989-09-19
- **effective on:** Not available
- **summary:** PI-89-020 response to Mid-Continent Pipe Line Company concerning 195.1, 195.3, 195.8.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-89-020.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-89-020.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-89-020
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1989/PI89020.pdf
**body:**

<<<PAGE 1>>>

Mr. H. L. Crawford, Jr.
Vice President
Mid-Continent Pipe Line Company
907 South Detroit Avenue
Tulsa, Oklahoma 74120
Dear Mr. Crawford:
Your letter of August 11, 1989, to the Office of Pipeline Safety
(OPS), with enclosures, gave notice as required by 49 CFR ?195.8 of
your intention to operate hazardous liquid pipelines constructed of
a material other than steel pipe. Specifically, Mid-Continent
proposes to install and operate certain crude oil gathering lines
in Oklahoma City, Oklahoma, using polyethylene plastic pipe. In an
earlier communication with Dennis Fothergill of the Oklahoma
Corporation Commission, we found the proposed plastic pipelines to
be subject to 49 CFR Part 195.
Additional information and data concerning this notice were
supplied verbally by Mr. Brad Lange to an OPS senior staff engineer
on August 22, 1989. Mr. R. D. McKenzie of your company provided
additional information and data by letter of August 29, 1989.
Also, Mr. McKenzie on September 14, 1989, concurred by telephone
with the two lists of regulations included in Enclosures 1 and 2
which must be complied with concerning these pipelines.
From the above described sources, the following is our
understanding concerning your proposal:
E Installation will consist of a total of approximately
38,800 feet of polyethylene plastic pipe.
E The pipe will be 3, 4, and 6 inch, SDR-11, PE 3408,
Phillips Driscopipe 6400.
E The pipe and fittings will be manufactured in compliance
with ASTM D2513, "Standard Specification for
Thermoplastic Gas Pressure Pipe, Tubing, and Fittings."
E Joining of polyethylene pipe will be by heat fusion.
E The pipelines will ne installed with a minimum cover of
48 inches.
DB
C:\WP51\INTERPRT\195\3\89-09-19
1

<<<PAGE 2>>>

E The pipelines will transport crude oil in a gathering
system in a commercial/residential area classified per
49 CFR ?192.5 as Class location 3.
E Each Lease Automatic Custody Transfer (LACT) station
feeding the system will be equipped with an automatic
shut-down which will deactivate the pump to assure the
system operates below the maximum design temperature of
100?F.
E The pipelines are designed for an estimated life of 50
years.
E The plastic pipelines will provide no significant
increase in hazards to the water table or any body of
water in their normal operation as compared with steel
pipelines in the same service.
E Design of plastic pipe will comply with 49 CFR ?192.121
with a factor of 0.20 being substituted for the 0.32
factor shown in the equation.
E The polyethylene pipelines shall be designed and
constructed in accordance with the requirements
pertaining to plastic pipelines contained in 49 CFR Part
192 and listed in Enclosure 1 to this letter. Otherwise
the pipelines shall comply with the requirements of 49
CFR Part 195 listed in Enclosure 2 to this letter.
Based upon the above information and our technical evaluation of
the safety of the proposed pipelines, we have determined in
accordance with 49 CFR ?195.8 the use and operation of polyethylene
plastic pipe in the above described manner would not be unduly
hazardous and the transportation may proceed as planned.
Sincerely,
/signed/
Richard L. Beam
Director
Office of Pipeline Safety
Enclosures
DB
C:\WP51\INTERPRT\195\3\89-09-19
2

<<<PAGE 3>>>

ENCLOSURE 1
Sections from 49 CFR Part 192 required for design, installation,
testing, and operation of polyethylene plastic pipelines in a crude
oil gathering system in Oklahoma City, Oklahoma.
Subpart B - Materials
192.59 Plastic pipe
192.63 Marking of materials
Subpart C - Pipe Design
192.121 192.123 Design of plastic pipe (modified by using a .20
factor instead of the .32 factor in the equation)
Design limitations for plastic pipe
Subpart D - Design of Pipeline Components
192.145 Valves
192.191 Design pressure of plastic fittings
192.193 Valve installation in plastic pipe
Subpart F - Joining of Materials Other Than by Welding
192.281 Plastic pipe
192.283 Plastic pipe; qualifying joining procedures
192.285 Plastic pipe; qualifying persons to make joints
192.287 Plastic pipe; inspection of joints
Subpart G - General Construction Requirements for Transmission
Lines and Mains
192.311 Repair of plastic pipe
192.321 Installation of plastic pipe
Subpart J - Test Requirements
192.503 General requirements
192.513 Test requirements for plastic pipelines
192.517 Records
Subpart L - Operations
192.619 Maximum allowable operating pressure: Steel or
plastic pipelines
DB
C:\WP51\INTERPRT\195\3\89-09-19
3

<<<PAGE 4>>>

ENCLOSURE 2
Sections of 49 CFR Part 195 required for polyethylene plastic
pipelines in a crude oil gathering system in Oklahoma City,
Oklahoma.
Subpart A - General (all sections)
Subpart B - Reporting Accidents and Safety-Related Conditions (all
sections)
Subpart C - Design Requirements
195.101 Qualifying metallic components other than pipe
195.104 Variations in pressure
195.108 External pressure
195.110 External loads (except for the second sentence in
paragraph (a))
195.118 Fittings
Subpart D - Construction
195.202 Compliance with specifications or standards
195.204 Inspection - general
195.206 Material inspection
195.246 Installation of pipe in a ditch
195.250 Clearance between pipe and underground structures
195.252 Backfill
195.256 Crossing of railroads and highways
195.258 Valves: General
195.260 Valves: Location
195.266 Construction records
Subpart F - Operation and Maintenance
195.401 General requirements
195.402 Procedural manual for operations, maintenance, and
emergencies
195.403 Training
195.404 Maps and records
195.408 Communications
195.410 Line markers
195.412 Inspection of rights-of-way and crossings under
navigable waters
195.420 Valve maintenance
195.422 Pipeline repairs
195.424 Pipe movement
195.440 Public education
DB
C:\WP51\INTERPRT\195\3\89-09-19
4
- **truncated:** false
- **body characters:** 5808