{"operation":"document","citation":"PI-90-018","title":"IBEW - Local Union 1245 — Pipeline Safety Interpretation","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"1990-05-18","effective_on":null,"summary":"PI-90-018 response to IBEW - Local Union 1245 concerning 199.3.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-90-018.json","markdown":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-90-018.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-90-018","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1990/PI90018.pdf","body":"<<<PAGE 1>>>\n\nMay 18, 1990\nMs. Jane Brunner\nStaff Attorney\nIBEW - Local Union 1245\nP.O. Box 4790\nWalnut Creek, CA 94596\nDear Ms. Brunner:\nWith regard to your April 26, 1990, letter to Cesar De Leon, I have enclosed a copy of our recent\nletter to Thomas Robertson of the Sierra Pacific Power Company, which discusses application of\nour drug testing rules to meter readers. Also enclosed are copies of our guidelines on application\nof the drug testing rules in general.\nPlease feel free to comment at your convenience on Sierra’ s March 23, 1990, letter to us and our\nresponse. We have no procedural regulations governing communications from parties, such as\nSierra, that request clarification of regulations we administer. In general, such communications\nare reviewed and answered in house, without inviting public participation.\nSincerely,\nGeorge W. Tenley, Jr.\nDirector\nOffice of Pipeline Safety\ndal/199.3/Employee\n90-05-18.3","truncated":false,"body_characters":926}