# Massachusetts Department of Public Utilities — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-93-050
- **title:** Massachusetts Department of Public Utilities — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1993-08-17
- **effective on:** Not available
- **summary:** PI-93-050 response to Massachusetts Department of Public Utilities concerning 192.605.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-93-050.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-93-050.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-93-050
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1993/PI93050.pdf
**body:**

<<<PAGE 1>>>

August 17, 1993
Mr. Chris Bourne
Chairman, New England Pipeline Safety Representatives
Massachusetts Department of Public Utilities
Saltonstall Building
100 Cambridge Street
Boston, MA 02202
Dear Mr. Bourne:
Thank you for your letter of July 12, 1993, commenting on the applicability of 49 CFR
Part 193 to mobile LNG plants. You asked us to reconsider our position that such plants
are covered by Part 193, and to determine instead that they are subject to the operating
and maintenance plan requirements of 49 CFR 192.605. You further asked us to
comment on a set of draft guidelines intended either as instructions for enforcement of
§192.605 or as conditions under state waivers of Part 193.
After reviewing the matter once more, we do not believe there is sufficient reason to
change our position that mobile LNG plants are covered by 49 CFR Part 193 rather than
49 CFR Part 192. However, we believe the draft guidelines are appropriate to use as
conditions under state waivers of Part 193. In fact, as you pointed out, one version of the
suggested guidelines is already in effect under a waiver granted by New Hampshire. The
guidelines could be used as conditions under a single waiver a state agency might grant all
jurisdictional operators who apply for a waiver of Part 193 requirements.
Identical letter being sent to Richard Marini and Philip Sher.
Sincerely,
Cesar De Leon
Director, Regulatory Programs
Office of Pipeline Safety
dal\192.605\93-08-17