# Public Utilities Commission of Ohio — Pipeline Safety Interpretation

- **operation:** document
- **citation:** PI-94-019
- **title:** Public Utilities Commission of Ohio — Pipeline Safety Interpretation
- **source type:** guidance
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** guidance
- **official:** true
- **published on:** 1994-05-02
- **effective on:** Not available
- **summary:** PI-94-019 response to Public Utilities Commission of Ohio concerning 192.551.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-94-019.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-94-019.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-interpretation-pi-94-019
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1994/PI94019.pdf
**body:**

<<<PAGE 1>>>

May 2, 1994
Mr. Edward M. Steele
Chief, Gas Pipeline Safety Section
The Public Utilities Commission of Ohio
180 E. Broad Street
Columbus, OH 43266-0573
Dear Mr. Steele:
I am responding to your letter of March 23, 1994, concerning the maximum allowable operating
pressure (MAOP) of pipeline in two distribution systems. Answers to your questions regarding
each system follow.
The first system has an MAOP of 125 psig based on a maximum safe pressure (§§ 192.619(b)(6)
and 192.621(a)(5)), but the system was operated at 145 psig during the 5–year period prior to
July 1, 1970. Section 192.619(c) would allow a new MAOP of 145 psig if the system is now in
“ satisfactory condition,” and the limitations on MAOP under § 192.611 (class location change)
and § 192.621 (high-pressure distribution systems) are met. However, any increase in MAOP
above 125 psig must comply with the uprating requirements of Subpart K of Part 192
(§ 192.551). Subpart K would still have to be met even if the system has been tested after
construction to at least 218 psig (1.5 time 145 psig).
The second system has an MAOP of 5 psig based on a maximum safe pressure, but the system
was operated at 10 psig during the 5–year period prior to July 1, 1970. Although the system has
been checked for corrosion and rid of leaks, the operator may not raise the MAOP to 10 psig
merely by certifying that 10 psig should have been the original MAOP. As with the first system,
the operator must uprate the system under Subpart K.
Sincerely,
Cesar De Leon
Director for Pipeline Safety
Regulatory Programs
dal/192.551
94/05/02
- **truncated:** false
- **body characters:** 1601
