{"operation":"document","citation":"PI-95-033","title":"U. S. Oil Co., Inc. — Pipeline Safety Interpretation","source_type":"guidance","agency":"Pipeline and Hazardous Materials Safety Administration","status":"guidance","official":true,"published_on":"1995-08-15","effective_on":null,"summary":"PI-95-033 response to U. S. Oil Co., Inc. concerning 195.1.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-95-033.json","markdown":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-95-033.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-interpretation-pi-95-033","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/legacy/interpretations/Interpretation%20Files/Pipeline/1995/PI95033.pdf","body":"<<<PAGE 1>>>\n\nAugust 15, 1995\nMr. Thomas J. Sullivan\nU. S. Oil Co., Inc.\n425 S. Washington St.\nCombined Locks, WI 54113\nDear Mr. Sullivan:\nAs you requested, this is to confirm that the distillate and gasoline pipelines described in your\nletter of November 4, 1994, to Donald E. Moore, did not come under the regulations in 49 CFR\nPart 195 until August 11, 1994. Before that date, low-stress petroleum product pipelines were\nnot subject to those regulations (59 FR 35465; July 12, 1994).\nSincerely,\nRichard D. Huriaux, P.E.\nDirector for Technology and\nRegulations\nOffice of Pipeline Safety","truncated":false,"body_characters":588}