{"operation":"document","citation":"PHMSA 19-152318","title":"UTILITY SAFETY AND DESIGN INC — Integrity Assurance Notification","source_type":"inspection","agency":"Pipeline and Hazardous Materials Safety Administration","status":"historical","official":true,"published_on":"2018-04-02","effective_on":"2018-04-02","summary":"GAS TRANSMISSION in AL,TN; PROGRAM; PHMSA status: RESOLVED.","machine_formats":{"json":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152318-operator-39394.json","markdown":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152318-operator-39394.md"},"app_url":"https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152318-operator-39394","source_url":"https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip","body":"As required under 49 CFR 192.909, this is notification that the Integrity Management Plan for the US Gypsum - Bridgeport interstate pipeline, operated by Utility Safety and Design, Inc. {USDI) under PHMSA OPID 39394 has been modified and updated. Please accept this as the &quot;30-day notification&quot; required under 49 CFR 192.909 and in accordance with 49 CFER 192.949. Below is a brief summary of the modifications made to the program, a copy of which was recently reviewed by PHSMA Southern Region. These modifications do not change the schedule for carrying out the program elements.","truncated":false,"body_characters":591}