# UTILITY SAFETY AND DESIGN INC — Integrity Assurance Notification

- **operation:** document
- **citation:** PHMSA 19-152318
- **title:** UTILITY SAFETY AND DESIGN INC — Integrity Assurance Notification
- **source type:** inspection
- **agency:** Pipeline and Hazardous Materials Safety Administration
- **status:** historical
- **official:** true
- **published on:** 2018-04-02
- **effective on:** 2018-04-02
- **summary:** GAS TRANSMISSION in AL,TN; PROGRAM; PHMSA status: RESOLVED.
- **machine formats:** - **json:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152318-operator-39394.json
- **markdown:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152318-operator-39394.md
- **app url:** https://regulus.evalyn.ai/document/phmsa-leading-ian-19-152318-operator-39394
- **source url:** https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/data_statistics/pipeline/SRCR_and_Integrity_Assurance_Notifications.zip
**body:**

As required under 49 CFR 192.909, this is notification that the Integrity Management Plan for the US Gypsum - Bridgeport interstate pipeline, operated by Utility Safety and Design, Inc. {USDI) under PHMSA OPID 39394 has been modified and updated. Please accept this as the &quot;30-day notification&quot; required under 49 CFR 192.909 and in accordance with 49 CFER 192.949. Below is a brief summary of the modifications made to the program, a copy of which was recently reviewed by PHSMA Southern Region. These modifications do not change the schedule for carrying out the program elements.
- **truncated:** false
- **body characters:** 591
